Grindmaster RAP-430 - Manual

Grindmaster RAP-430

Grindmaster RAP-430 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
Page: / 12

Table of Contents:

  • Page 2 – Adjustment Section; USER CONTROLS; Figure B; Figure A
  • Page 3 – TEMPERATURE AND BREW TIMING CONTROLS (Refer to Figure C); TEMPERATURE ADJUSTMENT KNOB; Figure C
  • Page 4 – Temperature and Brew Timing Controls; AMERICAN METAL WARE
  • Page 5 – Figure D
  • Page 6 – ERROR MESSAGE; FILLING PROBLEMS; “No power to control board and
  • Page 7 – HEATING PROBLEMS; Tank does not heat; Problem Possible Cause Solution
  • Page 8 – Brew volume too large or too small; BREWING PROBLEMS; Problem Possible Cause Solution; Brew volume erratic
  • Page 9 – Problem Possible Cause Solution; Troubleshooting section
  • Page 12 – WARRANTY; GENERAL WARRANTY INFORMATION; Coverage is not included for labor needed or caused by:; HOW TO OBTAIN WARRANTY SERVICES; Grindmaster Corporation’s Service Dept.
Loading the manual

ICB-400, ICB-300, P-430,

P-330, RAP-430, RAP-330,

RAPS-430, RAPS-330

OPERATIONS MANUAL

INSTALLATION

WARNING: ELECTRIC SHOCK HAZARD! Installation of this appliance should be performed by qualified service
personnel only. Improper installation could result in electrocution.

SET-UP AND POSITIONING OF BREWER

• Remove the brewer from packaging material and attach legs.
• Position the brewer on a strong, stable table or counter. Check the level front to back and side to side. Adjust legs as necessary to level

the unit.

WATER AND ELECTRICAL CONNECTIONS

IMPORTANT:THE PERSON INSTALLING THIS APPLIANCE IS RESPONSIBLE FOR ENSURING THAT ELECTRIC AND WATER
CONNECTIONS MEET THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, NATIONAL PLUMBING CODE AND ANY LOCAL
ORDINANCES.

The water and electrical connection locations are behind the front panel on the right side of the brewer. Remove the screws fastening this panel
to the unit to access these connections.

WATER HOOK-UP

• The water line may enter the brewer through holes in the bottom or rear of the brewer.
• Use 3/8” copper tubing or flexible water line to prevent strain. Do not use low temperature plastic tubing. The connection to the fill valve

is 3/8” flare.

• Water line pressure should be between 30 and 70 psi.
• Hot (up to 160°F) or cold water may be supplied to the unit. Hotter water will allow faster recovery between brews.

ELECTRICAL POWER SUPPLY HOOK-UP

• The electric ratings for this brewer are printed on the nameplate attached to the unit. Always see the name plate for rating information for

the particular brewer.

• The brewer should be connected to its own dedicated circuit with a fused disconnect switch or circuit breaker near the brewer.
• Attach the appropriately sized cord to the brewer with a cord grip for the 1-1/8” electric input opening in either the rear or bottom of the

unit. Use an oil resistant cord such as type SO, SOO, SAO, STOO, SEO, SJO, SJOO, SJTO, SJTOO, SJEO, HSO, HSOO, HSJO or
HSJOO. Alternatively, flexible conduit and type THHN wires may be used. Use only copper conductors.

• Standard units are single element units and are wired internally for single phase, 3 wire service. Connect the neutral line to the N terminal

of the terminal block and the 2 conductors to L1 and L2 of the terminal block. 3 element units may be connected to single or 3-phase
service. 3 element, single-phase units should be connected as described above. For 3 element units intended to operate with a 3 phase
power supply, connect the third phase conductor to L3 of the terminal block.

• The body of the brewer must be grounded. Connect the ground conductor to the ground lug located near the terminal block.

WARNING: ELECTRIC SHOCK HAZARD! Never use the ground conductor as a neutral. This could cause
electrocution.

INITIAL START-UP

• Turn on the water supply to the brewer. Check for leaks at the supply line to fill valve connection. Remove the controller cover panel.
• Turn on the electrical power. The brewer will begin to fill. Units that require more than 5 min. to fill will display an error message “ER1” on

the controller after 5 min. of filling. Press the SELECT button on the controller for 10 sec. to reset the unit and continue filling. To reset the
controller, the SELECT button must be pressed while the LED’s indicate ER1. If the SELECT button is momentarily pressed a timer
numerical value will be displayed. If this occurs, wait 10 sec. and the error message will again be displayed; press the SELECT button for
10 sec. to reset controller and resume filling.

• After the tank has filled, replace the controller cover panel.
• Turn on power and the water heating cycle will begin; it will take 15-35 min. to complete the heating cycle. The WATER HOT light on the

front of the unit will turn on when the water has reached temperature.

• The brewer can now be operated to evaluate brew timer settings and then make adjustments as necessary.

The brewer timers settings are preset at the factory to the following values:
Small brew

(0.75 gal.)

120 sec.

Medium brew

(1.25 gal.)

165 sec.

Large brew

(1.75 gal.)

230 sec.

• Insert the brew baskets and place the appropriate container under the brew basket.
• Portion size is selected with the touchpad located on the front of the brewer. The upper right hand area of the touchpad has 2 LEDs. If

both are lit the unit is set to brew the large volume. If only the upper LED is lit, the brewer will brew the medium volume; if only the lower
LED is lit, the brewer will brew the small brew volume.

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - Adjustment Section; USER CONTROLS; Figure B; Figure A

AMERICAN METAL WARE ® BREWERS INITIAL START-UP (cont’d) Once the appropriate selection is made, press the START switch on the touchpad to begin dispensing water through the sprayhead. Brew at least1 batch for each timer setting. Check the level in the container to be sure the brew volume is correct....

Page 3 - TEMPERATURE AND BREW TIMING CONTROLS (Refer to Figure C); TEMPERATURE ADJUSTMENT KNOB; Figure C

AMERICAN METAL WARE ® BREWERS TEMPERATURE AND BREW TIMING CONTROLS (Refer to Figure C) Temperature and brew timing are set by the dial and keypad located on the main controller. This controller is positioned inside the brewer housing and is accessed by removing the screws which fasten the access pan...

Page 4 - Temperature and Brew Timing Controls; AMERICAN METAL WARE

STANDARD FEATURES Three options are available on this equipment; these options are available independently of each other. The features are described below: Pre-infusion: This option enables the brewer to wet the grounds and then have a dwell period before the brew cycle is completed. This option cau...

Other Grindmaster Models

All Grindmaster Other