Grindmaster 67710E - Manual
Grindmaster 67710E – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – American Metal Ware 67710E Coffee Urn
- Page 3 – Introduction; Page 3
- Page 4 – Safety and Security; no access to hot water or coffee except through faucet.; Operation
- Page 5 – Package Contents; ) Two stainless steel mesh brew baskets.
- Page 7 – Installation; Unpack the Urn; The urn must be connected to a branch circuit with its own shut-off.; Place Urn; right. The height of the feet is adjustable for this purpose.; Complete the Hook Up; WARNING, ELECTRIC SHOCK HAZARD
- Page 8 – Figure 1, Service Hookup Locations; Electric Inlet
- Page 9 – Initial Start Up; Now that the brewer is connected, it can be started and checked.; FILLING; The urn will take approximately 15 minutes to fill.; WATER HOT; will turn on when the
- Page 10 – Turn the brew lock key to
- Page 12 – Adjustments; To change the water tank temperature:; Figure 4, Bypass Valve
- Page 13 – To Change the Water Tank Temperature (cont)
- Page 14 – Fill Rate Adjustment; FAST FILL VALVE
- Page 15 – Cleaning
- Page 18 – Notes
1104 Form # AM-320-02
American Metal Ware
®
Coffee Urn
Installation, Operation & Service Manual
For
Model 67710E
Electric Steam
Special Features
After completing installation and set-up, the
equipment owner should keep this manual for
future reference.
© Grindmaster Corporation™, 1996
PRINTED IN USA
Grindmaster Corporation™
4003 Collins Lane
Louisville, Kentucky 40245 USA
(502) 425-4776
(800) 695-4500
(USA and Canada only)
(800) 568-5715
(technical service only)
FAX: (502) 425-4664
www.grindmaster.com
X
TABLE OF CONTENTS
Warning Labels.......................................2
Introduction.............................................3
About the 67710E Coffee Urn..................4
General Description.....................4
Features of This Model................4
Pre-Installation........................................5
Package Contents.......................5
Rough In Drawing....................................6
Installation...............................................7
Initial Considerations...................7
Complete the Hook Up................8
Initial Start Up..............................9
Operation..............................................10
Load the Coffee.........................10
Start the Brew............................10
After the Brew is Finished..........11
Adjustments..........................................12
Bypass Adjustment....................12
Thermostat Adjustment..............12
Timer Adjustment.......................13
Flow Rate Adjustment................13
Fill Rate Adjustment...................14
Cleaning................................................15
After Each Use...........................15
Each Day...................................15
Semi-Weekly..............................15
Wiring Diagram......................................16
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
Introduction Thank you for purchasing this American Metal Ware product. American Metal Ware hasbeen building beverage equipment since 1883. This product has been designed for thequality and cost conscious restaurant operator in mind. Our metal craftsmen proudly buildeach product with great attention...
About the 67710E Coffee Urn General Description This coffee urn has been engineered to suit the special needs of the prison environment.This section highlights the characteristics and special features of the product. The urn is a large capacity, high-speed, coffee brewing and holding unit. The body ...