Cooper Lighting ADY080863 - Manual
Cooper Lighting ADY080863 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
access to bolts from side of fixture.
2.
Using 1/4-20 x1" screws, secure mounting brackets to bottom
Brackets can be attached as shown or reversed allowing
of ballast enclosure.
1.
Insert driver through
mounting holes in bracket
to secure brackets to ballast
enclosure.
Visor and Non-Visor
Sheet 1 of 3
performed by a certified electrician.
2.
Warning
: Before starting any work ensure
that all sources of power are turned off. All
work must meet local/national codes and be
mount fixtures vertically.
Installation Instructions
1.
Do not
Roundel, XL
IN/OUTDOOR
BI
(B
ase,
I
ntegral
)
ADY080863 REV A(ECN080377)
Pre-installed
(x4)
1/4-20 bolts
1/4-20 nut
(x4)
1.
After securing mounting brackets to ballast enclosure, slide
brackets over pre-installed 1/4-20 bolts in mounting
surface.(Refer to page 3 for mounting dimensions)
2.
Using appropriate nuts, secure ballast enclosure to surface.
(x10)
1/4-20 x1"
Fixture door
screws
Exploded View and Part Call-Out
enclosure
Captive door
Aiming screw
(4x)
Securing Mounting Brackets
(2x)
(x12)
Integral ballast
Screw
cover plate
#10-32 x 1/2"
brackets (2x)
End cap
Pan head screws
Hex End bolt
Mounting
Ballast enclosure
(2x)
3/8-16 x1"
1/4-20 x1"
1/4-20 x1"
Screw
(4x)
Securing Ballast Enclosure to Surface
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.