Carrier BS1- User Manual
Carrier BS1– User Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 4 – a combustible floor, a combustible floor base must be used.; Fig. 1—Dimensional Drawing and Boiler Ratings and Capacities
- Page 6 – PROCEDURE 2—BOILER LOCATED IN CONFINED SPACE; EXAMPLE 2A: ALL AIR FROM INSIDE THE BUILDING; Table 3A—Fresh Air Duct Capacities for Vertical Ducts (Btuh)*; Table 3B—Fresh Air Duct Capacities for Horizontal Ducts (Btuh)*; INSTALLATION—SYSTEM PIPING; Place boiler in selected location as near chimney as possible.
- Page 7 – a header with 2 risers.; Fig. 3—Recommended Near Boiler Piping Using 1 Supply Tapping
- Page 8 – or pump, a sand strainer should be installed at pump.
- Page 9 – MISSING TEE FOR SKIMMING; WRONG WAY; TAKE OFFS MUST BE BETWEEN RISER & EQUALIZER; WRONG WAY; SWING JOINTS ARE MISSING; WRONG WAY; THIS PIPING CONFIGURATION IS INCORRECT; Fig. 5—Common Near Boiler Piping Mistakes
- Page 10 – PROCEDURE 4—MINIMUM VENT PIPE CLEARANCE; TO SYSTEM
- Page 11 – Fig. 7—Typical Masonry Chimney Requirements; HT; ROOF RIDGE
- Page 13 – NATURAL GAS; LP GAS; Pipe Capacity—Btuh Input
- Page 14 – wire or its equivalent.
- Page 20 – To Turn Off Gas To Appliance; Turn off all electrical power to appliance.
- Page 21 – Open fill valve and allow water to run into boiler.; Fig. 20—Lighting Pilot
- Page 22 – to; OUTER MANTEL
- Page 23 – Probe-type low water cut-offs require no maintenance at this time.
- Page 25 – PROCEDURE 9—BOILER WATER TREATMENT (OTHER THAN CLEANERS)
- Page 26 – SERVICE HINTS; FOR YOUR SAFETY; WHAT TO DO IF YOU SMELL GAS
- Page 27 – REPAIR PARTS; Jacket—Section and Base Parts; This is a Repair Parts List—Not a Packing List; GAS-FIRED STEAM BOILERS; Part No. — Part Description — Boiler Model No.
- Page 28 – Gas Burners and Manifold Parts; FOR USE WITH NATURAL GAS ONLY
- Page 29 – DESCRIPTION; Steam Pressure Gauge; BOILER CONTROLS AND PIPING
- Page 31 – SERVICE TRAINING
NOTE:
Read the entire instruction manual before starting the installation. These instructions must be affixed on or adjacent to the boiler.
This symbol
→
indicates a change since the last issue.
Index
Page
SAFETY CONSIDERATIONS.....................................................................................................................................................................................3
INTRODUCTION..........................................................................................................................................................................................................3
BOILER RATINGS AND CAPACITIES ....................................................................................................................................................................4
ama
ASME
®
A95139
Continuous Pilot
MODEL BS1
A90003
Electronic Intermittent Ignition
MODEL BS2
Installation, Start-Up, and Operating Instructions
BS1 and BS2
Series B
Gas-Fired
Natural Draft Steam Boilers
Sizes 70,000 through 299,000
Form:
IM-BS1A-05
Cancels:
IM-BS1A-04
Printed in U.S.A.
8-03
Catalog No.
63BS-1A3
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
BOILER RATINGS AND CAPACITIES The ratings marked "Net I=B=R Rating" indicate the amount of equivalent direct cast iron radiation each boiler will take care of under normalconditions and thermostatic control. The Net I=B=R Steam Ratings shown are based on an allowance of 1.333 in accordance w...
PROCEDURE 2—BOILER LOCATED IN CONFINED SPACE EXAMPLE 2A: ALL AIR FROM INSIDE THE BUILDING The confined space shall be provided with two permanent openings communicating directly with an additional room(s) of sufficient volume sothat the combined volume of all spaces meets the criteria for an unconfi...
3. This boiler is equipped with two 2-1/2-in. supply connections and two 2-1/2-in. return connections, 1 each on both the left and right sides of boiler. Unused connections must be plugged with factory-supplied 2-1/2-in. plugs. 4. Recommended near boiler piping for gravity return systems is shown in...