Carrier 90MU - Manual

Carrier 90MU

Carrier 90MU – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
Page: / 22

Table of Contents:

  • Page 2 – LEGEND
  • Page 10 – FIGURE 6 - CONNECTION LOCATIONS
  • Page 12 – Step 12 - Make Electrical Connections; OPERATION; CAUTION
  • Page 13 – SERVICE; WARNING; Return-Air Grille Removal
  • Page 14 – Evaporator Coil; FIGURE 9 - GRAVITY FLOW METHOD
  • Page 15 – Evaporator-Fan Motor Removal; Crankcase Heater; Discharge and Suction Pressure Switches
  • Page 16 – Oil Charge; - All units are factory charged with oil. On 06D
  • Page 17 – FOR NOTES AND LEGEND, SEE FIGURE 13
  • Page 19 – FOR NOTES AND LEGEND, SEE FIGURE 15
Loading the manual

90MA/MU

Single-Package Marine Cooling Units


Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations

Printed in U.S.A.

90MA-3SI SUPERCEDES FORM 62-02971-00 09-2009

Pg 1

Installation, Operation and Service Instructions

SAFETY CONSIDERATIONS

The 90MA/MU Units are designed to provide safe and

reliable service when operated within design specifications.
However, due to system pressures, electrical components,
and equipment location, some aspects of installation,
operation and servicing of this equipment can be hazardous.

Only trained, qualified installers and service technicians

should install, operate, and service this equipment.

When working on the equipment, observe all precautions

on tags or labels attached to the unit. Safety notes in the
literature, and any other safety precautions that apply.

Follow all safety codes.

Wear safety glasses and work gloves.

Use care in handling, rigging, and placing bulky

equipment.

WARNING

Never reach into unit while fan is running. Lock
open and tag power disconnect before working
on a fan. Remove the fuses and take them with
you after noting this on tag.

Check assembly and component weight to be
sure rigging equipment can handle them safely.
Note also any specific rigging instructions.

When steam cleaning coils, be sure area is
clear of personnel.


GENERAL

The 90MA/MU water cooled single-package cooling units

are designed to provide air conditioning aboard marine
vessels. The 90MA units are fitted with a water cooled
condenser and are factory charged, wired and piped. The
90MU units are similar to the 90MA except they are
configured for use of a remote mounted condenser.

An accessory discharge plenum may be installed to

provide free-blow into the conditioned space. Also, an
optional electric heater may be specified to provide comfort
heating.

INSTALLATION

Step 1 - Inspect Unit

- Check unit against shipping order.

Inspect carefully for concealed shipping damage. If shipment
is damaged or incomplete,

file claim with transportation

company and advise Carrier Transicold immediately.

CONTENTS

Page

SAFETY CONSIDERATIONS

........................................1

GENERAL

.....................................................................1

INSTALLATION

............................................................. 1

Step 1- Inspect Unit .......................................................1
Step 2 - Protect Unit from Damage ................................1
Step 3 - Provide Unit Support ........................................1
Step 4 - Rig and Place Unit ............................................8
Step 5 - Install Accessory Plenum (If Supplied) ............8
Step 6 – Check Fan Shaft and Wheel Alignment ...........9
Step 7 - Install Ventilation Ductwork (If Required) ..........9
Step 8 - Check Return-Air Filters ...................................9
Step 9 - Check Compressor Spring Mounts

(*08 & *12) ................................................................9

Step 10 - Make Condenser Connections .......................9
Step 11 - Install Unit Drain Line ................................... 11
Step 12 - Make Electrical Connections ........................ 12

OPERATION

................................................................ 12

To Start Unit ................................................................. 12
To Shut Down Unit ....................................................... 12
Service Valves ............................................................. 12

SERVICE

..................................................................... 13

Return-Air Grill Removal .............................................. 13
Access Panel Removal ................................................ 13
Evaporator Fan Adjustment ......................................... 13
Lubrication ................................................................... 13
Return-Air Filters .......................................................... 13
Condensate Drains ...................................................... 13
Evaporator Coil ............................................................ 14
Water Regulating Valve ............................................... 14
Condenser ................................................................... 14
Charging the System.................................................... 15
Evaporator Fan Motor Removal ................................... 15
Pressure Relief Device................................................. 15
Crankcase Heater ........................................................ 15
Cycle-LOC

TM

Protection Device ................................... 15

Discharge And Suction Pressure Switches .................. 16
Oil Charge .................................................................... 16

WIRING SCHEMATIC - *04/*06

................................... 17

COMPONENT ARRANGEMENT - *04/*06

.................. 18

WIRING SCHEMATIC - *08/*12

................................... 19

COMPONENT ARRANGEMENT - *08/*12

.................. 20

UNIT SUPPORT DRAWINGS

..................................... 21




Step 2 - Protect Unit from Damage

- To maintain warranty,

protect unit against adverse weather, theft, or vandalism on
job site.


Step 3 - Provide Unit Support

- Refer to Figure 2 and

Tables 1A/B/C/2A/B/C for unit size and weight. If desired,
construct a frame of I-beams or angle iron that adequately
supports unit. See unit support drawings contained in this
document.

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - LEGEND

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations Printed in U.S.A. 90MA-3SI SUPERCEDES FORM 62-02971-00 09-2009 Pg 2 TABLE 1A - 90MA/MU PHYSICAL DATA – R-134A , ENGLISH UNITS (See Table 2A for SI units) ...

Page 10 - FIGURE 6 - CONNECTION LOCATIONS

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations Printed in U.S.A. 90MA-3SI SUPERCEDES FORM 62-02971-00 09-2009 Pg 10 a. Route regulating valve capillary with its flare nut to the fitting on refrigerant ...

Page 12 - Step 12 - Make Electrical Connections; OPERATION; CAUTION

Step 12 - Make Electrical Connections GENERAL - Provide an adequate fused disconnect switch within sight of the unit. Provision for locking switch open (OFF) is advisable to prevent power from being turned on when unit is being serviced. POWER WIRING - Conduit opening for all units is on left side o...