Bunn WDG-2 - Manual

Bunn WDG-2

Bunn WDG-2 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
Page: / 28

Table of Contents:

  • Page 2 – The grind is preset at the factory to; drip; and workmanship for two years from the date of installation.
  • Page 4 – will remain in this position after grinding has ceased.
  • Page 6 – - Unplug grinder before removal of
  • Page 8 – EXTERIOR SURFACES
  • Page 9 – ADJUSTMENTS; ment to the burrs should be followed by an adjustment of the timer,; Burr Adjustment; , to determine other settings, refer to the previous; B U N N
  • Page 10 – WDG2 Models can be converted from weight based settings to timed; DIGITAL CONTROL DISPLAY ASSEMBLY FUNCTION LIST - WDG-2
  • Page 11 – TROUBLESHOOTING; WARNING; Exercise extreme caution when servicing electrical equipment.
  • Page 14 – SERVICE; MODEL
  • Page 15 – PNK TO SELECTOR SWITCH; Hopper Selector Switch
  • Page 16 – Motors
  • Page 18 – Replace if excessively worn or damaged.
  • Page 22 – Fan; Fuse
  • Page 26 – SINGLE PHASE; SCHEMATIC WIRING DIAGRAM DG2; WIRING DIAGRAMS
  • Page 27 – SCHEMATIC WIRING DIAGRAM WDG2
Loading the manual

BUNN

®

DG-2

WDG-2

INSTALLATION & OPERATING MANUAL

BUNN-O-MATIC CORPORATION

POST OFFICE BOX 3227

SPRINGFIELD, ILLINOIS 62708-3227

PHONE: (217) 529-6601 FAX: (217) 529-6644

10854.0000 3/00 ©1995 Bunn-O-Matic Corporation

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - The grind is preset at the factory to; drip; and workmanship for two years from the date of installation.

2 CONTENTS Introduction .............................................................................. 2Warranty ................................................................................... 2User Notices ............................................................................. 3Electrical...

Page 4 - will remain in this position after grinding has ceased.

4 ELECTRICAL REQUIREMENTS This grinder has an attached cordset and requires 2-wire, grounded service rated 120 volts ac, 15 amp, single phase, 60 Hz. OPERATING CONTROLS Off/On/Start Switch OFF - (upper position) Switching to this position stops all operation of the grinder. ON - (middle position) Th...

Page 6 - - Unplug grinder before removal of

6 SPECIAL SET-UP FOR FLAVORED COFFEE BEANS 1. WARNING - Unplug grinder before removal of any panel. 2. Select the hopper to be used for flavored coffeebeans. 3. Remove upper front inspection panel locatedbelow control switches. 4. Locate dechaffer blade lever for hopper(s) se-lected in step #2. 5. R...

Other Bunn Models

All Bunn Other