Bunn WDG-2 - Manual
Bunn WDG-2 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – The grind is preset at the factory to; drip; and workmanship for two years from the date of installation.
- Page 4 – will remain in this position after grinding has ceased.
- Page 6 – - Unplug grinder before removal of
- Page 8 – EXTERIOR SURFACES
- Page 9 – ADJUSTMENTS; ment to the burrs should be followed by an adjustment of the timer,; Burr Adjustment; , to determine other settings, refer to the previous; B U N N
- Page 10 – WDG2 Models can be converted from weight based settings to timed; DIGITAL CONTROL DISPLAY ASSEMBLY FUNCTION LIST - WDG-2
- Page 11 – TROUBLESHOOTING; WARNING; Exercise extreme caution when servicing electrical equipment.
- Page 14 – SERVICE; MODEL
- Page 15 – PNK TO SELECTOR SWITCH; Hopper Selector Switch
- Page 16 – Motors
- Page 18 – Replace if excessively worn or damaged.
- Page 22 – Fan; Fuse
- Page 26 – SINGLE PHASE; SCHEMATIC WIRING DIAGRAM DG2; WIRING DIAGRAMS
- Page 27 – SCHEMATIC WIRING DIAGRAM WDG2
BUNN
®
DG-2
WDG-2
INSTALLATION & OPERATING MANUAL
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
10854.0000 3/00 ©1995 Bunn-O-Matic Corporation
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
2 CONTENTS Introduction .............................................................................. 2Warranty ................................................................................... 2User Notices ............................................................................. 3Electrical...
4 ELECTRICAL REQUIREMENTS This grinder has an attached cordset and requires 2-wire, grounded service rated 120 volts ac, 15 amp, single phase, 60 Hz. OPERATING CONTROLS Off/On/Start Switch OFF - (upper position) Switching to this position stops all operation of the grinder. ON - (middle position) Th...
6 SPECIAL SET-UP FOR FLAVORED COFFEE BEANS 1. WARNING - Unplug grinder before removal of any panel. 2. Select the hopper to be used for flavored coffeebeans. 3. Remove upper front inspection panel locatedbelow control switches. 4. Locate dechaffer blade lever for hopper(s) se-lected in step #2. 5. R...