Bunn TB3-LP - Manual
Bunn TB3-LP – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 3 – INTRODUCTION; CONTENTS; USER NOTICES; WA; OT L; WARNING
- Page 5 – PLUMBING REQUIREMENTS
- Page 8 – AUTO SWEETENER SET-UP
- Page 9 – ADJUSTING BREW VOLUMES; are in place, prior to setting or modifying batch sizes.
- Page 10 – CAUTION - The funnel contains hot liquids. Remove funnel slowly.
- Page 11 – CLEANING; CAUTION - CLEAN AND SANITIZE YOUR ICED TEA BREWER DAILY; and out 5 or 6 times. Reattach the sprayhead.; AUTO SWEETENER CLEANING; Remove the connector off of the bag in a box.
TB3/TB6 Series
Including: TB3; TB3-LP;
TB3Q; TB3Q-LP; TB6; TB6Q
STARTING WITH SERIAL NUMBER: TU00020000
INSTALLATION & OPERATING MANUAL
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
To ensure you have the latest revision of the Operating Manual, or to view the Illustrated Parts
Catalog, Programming Manual, or Service Manual, please visit the Bunn-O-Matic website, at
www.bunn.com. This is absolutely FREE, and the quickest way to obtain the latest catalog and
manual updates. For Technical Service, contact Bunn-O-Matic Corporation at 1-800-286-6070.
41465.0001C 12/12 ©2008 Bunn-O-Matic Corporation
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
Page 3 #00831.0000 #00656.0001 #03408.0000 #03409.0000 #37881.0000 • FILL WATER TANK BEFORE ENERGIZING • DO NOT OVERLOAD CIRCUIT • KEEP AWAY FROM COMBUSTIBLES • DO NOT DEFORM PLUG OR CORD • FAILURE TO COMPLY RISKS EQUIPMENT DAMAGE, FIRE OR SHOCK • BREWER ENERGIZED UNLESS UNPLUGGED SEE INSTRUCTIONS W...
Page 5 120V MODELS These brewers must be connected to a cold water system with a minimum 1.0 gpm flow rate, and operating pressure between 20 and 90 psi (138 and 620 kPa) from a ½˝ or larger supply line. A shut-off valve should be installed in the line before the brewer. Install a regulator in the l...
Page 8 AUTO SWEETENER SET-UP CAUTION - The brewer must be disconnected from the power source throughout the Initial Set-Up, except when specified in the instructions. 1. Remove the top lid and both rear panels. 2. Make sure the brewer water supply is off. 3. Connect sweetener hose from the bag in a ...