Zephyr ES1-E30AS - Manuals

Zephyr ES1-E30AS – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13

Summary

Page 3 - CAUTION; TABLE OF CONTENTS; WARNING

Please take note this manual uses the following symbols to emphasize particular information: NOTE: Indicates supplementary information needed to fully complete an instruction. ABOUT THIS MANUAL TOOLS NEEDED TO INSTALL THE RANGE HOOD CAUTION Denotes an instruction which, if not followed, may severely...

Page 4 - MEASURE THE INSTALLATION

1. INSTALL DUCTWORK Plan where and how the ductwork will be installed. Install proper-sized ductwork, elbow(s) and roof or wall cap for the type of blower you areinstalling. If using 6’’ (150 mm) round ducts, use a transition. Use 2’’ (50 mm) duct tape toseal duct joints. Hood 3¼” x 10” duct Roof ca...

Page 5 - PREPARE THE INSTALLATION

NOTE: If the bottom of the cupboard is recessed,attach wood strips (not included), as shownbeside, in order to properly install the rangehood under the cabinet. The wood strips mustbe as thick as recess. HO0002A 2 ” 3 8 Cut-out the openings for duct ( A ) and power cable ( B ), in cabinet or wall, a...

Zephyr Manuals