Weber 675 - Manuals

Weber 675 – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16

Summary

Page 2 - INSTALL GAS SUPPLY; Gas line piping; Test connections; DANGER; Do not use an open flame to ch e ck for gas; READ CAREFULLY BEFORE INSTALLATION

INSTALL GAS SUPPLY Gas line piping ■ If the length of line required does not exceed 50 feet,use a 5/8" O.D. tube. One size larger should be usedfor lengths greater than 50 feet. ■ Gas piping may be copper tubing, type K or L;polyethylene plastic tube, with a minimum wallthickness of .062 inch; o...

Page 3 - BUILT-IN CONSTRUCTION GENERAL INFORMATION; WARNING

3 3 BUILT-IN CONSTRUCTION GENERAL INFORMATION WARNING A Weber-Stephen Products Co. insulated s l e eve must be used for any bu i l t - i ninstallation. CLEARANCE FROM COMBUSTIBLE SURFACES ORSTRUCTURES Warning: Clearance from the outside walls of thesides and back of the insulated sleeve must be amin...

Page 5 - BUILT-IN SLEEVE GAS LINE

5 BUILT-IN SLEEVE GASLINE LOCATIONS 475 675 Tolerances A 5.0” 5.0” B 10.1” 10.1” C 2.5” 2.5” + 1 ⁄ 16 - 1 ⁄ 16 + 1 ⁄ 16 - 1 ⁄ 16 + 1 ⁄ 32 - 1 ⁄ 32 BUILT-IN SLEEVE GAS LINE LOCATIONS The dimensions shown indicate the location of the gasline inlet flange in the insulated sleeve. The supportmembers of ...

Weber Manuals