Wayne P250AF-EP - Manuals

Wayne P250AF-EP – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25

Summary

Page 2 - VISUAL INSPECTION OF THE HEATING SYSTEM; Water

1 These instructions were prepared for the guidance of those installing this particular gas conversion burner. While thy apply in principle to all installations, they should not be interpreted as meaning the only safe and economical way to install a conversionburner. It may be necessary to deviate f...

Page 3 - FLUE PIPE AND CHIMNEY; company should be consulted.; INSPECTION OF HEATING APPLIANCE; and draft hood to the sizes shown in the table.; FIGURE 1

2 FLUE PIPE AND CHIMNEY The flue pipe should be carefully inspected and replaced if necessary in connection with installation of a draft hood. All installations must operate with a negative draft overfire. Refer to your local gas company or codes for assistance or to thefurnace and/or boiler manufac...

Page 5 - Draft Hood and; PREPARATION OF COMBUSTION CHAMBER

4 PREPARATION OF FURNACE OR BOILER Clean combustion chamber thoroughly. Scrape and brush all heating surfaces and flue ways. Soot and fly ash are excellent insulators and unless removed the efficiency of the heating plant will be impaired. Plugged or restricted flue passages willprevent burner from ...

Wayne Manuals