Thermo Pride PGT16-160 - Manuals

Thermo Pride PGT16-160 – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38

Summary

Page 4 - This furnace is not to be used as a construction heater.; TURN OFF THE ELECTRICAL POWER; to the furnace before attempting to change blower speed wiring.

All installations and services must be performed by qualified service personnel. 2 This page contains various warnings and cautions reproduced from the Power Gas Furnace Manual. Please read and comply with the statements below . CAUTION: When installing the burner, it should be noted that the loose ...

Page 5 - I. GENERAL INSTRUCTIONS

All installations and services must be performed by qualified service personnel. 3 I. GENERAL INSTRUCTIONS These instructions must be read in their entirety before installing the furnace. It is the installer's responsibility to do the following: 1. Inform and demonstrate to the user, the correct ope...

Page 7 - 00 square inches is required regardless of the input.

All installations and services must be performed by qualified service personnel. 5 EXAMPLE: 100,000 BTUH input furnaces requires "two" openings of 100 square inches each. A minimum opening of 100 square inches is required regardless of the input. If the building is tightly constructed and or...

Thermo Pride Manuals