Page 4 - This furnace is not to be used as a construction heater.; TURN OFF THE ELECTRICAL POWER; to the furnace before attempting to change blower speed wiring.
All installations and services must be performed by qualified service personnel. 2 This page contains various warnings and cautions reproduced from the Power Gas Furnace Manual. Please read and comply with the statements below . CAUTION: When installing the burner, it should be noted that the loose ...
Page 5 - I. GENERAL INSTRUCTIONS
All installations and services must be performed by qualified service personnel. 3 I. GENERAL INSTRUCTIONS These instructions must be read in their entirety before installing the furnace. It is the installer's responsibility to do the following: 1. Inform and demonstrate to the user, the correct ope...
Page 7 - 00 square inches is required regardless of the input.
All installations and services must be performed by qualified service personnel. 5 EXAMPLE: 100,000 BTUH input furnaces requires "two" openings of 100 square inches each. A minimum opening of 100 square inches is required regardless of the input. If the building is tightly constructed and or...
Page 9 - An agency approved gas barometric control or draft diverter; must; be installed. The draft control device must
All installations and services must be performed by qualified service personnel. 7 NOTE: If this furnace replaces an appliance with a vent that was originally installed in a common vent system serving other appliances, the vent system is likely now too large to properly vent the remaining appliances...
Page 12 - TYPICAL PIPING FOR TWO STAGE REGULATION
All installations and services must be performed by qualified service personnel. 10 EXAMPLE: A line must supply a furnace of 110,000 BTU/hr input, a hot water heater of 40,000 BTU/hr input and gas range with a 30,000 BTU/hr input capacity. The total BTU/hr input loading on the line is 180,000 BTU/hr...
Page 14 - TWO PIECE MOUNTING PLATE; Do not place loose insulation around chamber sides and back.; BURNER INSERTION
All installations and services must be performed by qualified service personnel. 12 TWO PIECE MOUNTING PLATE When mounting the burner, the upper mounting plate must be removed to provide access to the area in front of the combustion chamber. The combustion chamber can then be moved forward or backwa...
Page 15 - with combustion equipment and a carbon monoxide detector.; It; requires combustion equipment and a
All installations and services must be performed by qualified service personnel. 13 to have the possibility of being carcinogenic to humans. IARC has also classified these fibrous materials as group 2A carcinogens when they have undergone long term exposure to temperatures greater than 18000F. A gro...
Page 17 - or O; L. REQUIREMENTS AND SIZING OF DUCT WORK
All installations and services must be performed by qualified service personnel. 15 In summary, setting the combustion air on the Thermo Pride Midco RE32 power gas conversion burner is extremely critical. This adjustment should only be made by following these instructions and confirming the set-up w...
Page 18 - DUCT SIZES FOR HOMES, QUIET OFFICES OR SIMILAR INSTALLATIONS
All installations and services must be performed by qualified service personnel. 16 EXAMPLE: Heating output of furnace is 100,000 x 1.4 ÷ 100 = 1400 CFM. Air conditioning installed is 4 tons x 400 CFM = 1600 CFM or 48,000 BTU's. NOTE: The duct system must be sized for the larger CFM requirement for ...
Page 29 - See burner manufacturer instructions for troubleshooting.
All installations and services must be performed by qualified service personnel. 27 II. STARTING THE UNIT A. INITIAL START UP: 1. Check all wiring for loose connections and proper hook up. 2. Leak test gas piping connections. 3. Check tubing to the pressure switch to make sure it is pushed firmly on...
Page 32 - Remove cleanout
All installations and services must be performed by qualified service personnel. 30 V. DEALER MAINTENANCE A. ELECTRICAL: 1. Check all wiring for loose connections. 2. Check for correct voltage at the furnace when operating. 3. Check amp-draw on blower motor and burner to assure they are not exceedin...
Page 34 - VII. REPLACEMENT PARTS
All installations and services must be performed by qualified service personnel. 32 VII. REPLACEMENT PARTS