Page 2 - TABLE OF CONTENTS; Please read and understand these; WARNING; GENERAL INFORMATION
2 SUPERIOR DIRECT-VENT GAS FIREPLACES • MODELS SLDVT-30/35/40/45 • INSTALLATION INSTRUCTIONS TABLE OF CONTENTS Packaging . . . . . . . . . . . . . . . . . . . . . . . . . . 2Introduction . . . . . . . . . . . . . . . . . . . . . . . . 2General Information . . . . . . . . . . . . . . . . . . 2Require...
Page 3 - 0 - latest edition, or the Canadian Electrical; Table 1
3 SUPERIOR DIRECT-VENT GAS FIREPLACES • MODELS SLDVT-30/35/40/45 • INSTALLATION INSTRUCTIONS WARNING Improper installation, adjust- ment, alteration, service or maintenance can cause injury or property damage. Refer to this manual. For assistance or additional information consult a qualified install...
Page 4 - Table 3; REQUIREMENTS FOR THE COMMON-; Table 2; Table 4
4 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. Figure 2 - Dexen Electronic Gas Valve Pilot Stage Terminal Pressure-Tap (Inlet) Pilot Gas Outlet Supply Gas Inlet Pressure-Tap (Manifold) Burner Stage Terminal Ground (TP) PILOT OUT VENT LO TH TP TH TP HI IN IN Regulator Mounting Screw Test gaug...
Page 5 - Figure 3; Typical Locations; HORIZONTAL VENT; When the unit is installed with one; LOCATION; Do not insulate the space between the appli-; COLD CLIMATE INSULATION
5 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. SUPERIOR DIRECT-VENT GAS FIREPLACES • MODELS SLDVT-30/35/40/45 • INSTALLATION INSTRUCTIONS Figure 3 - Typical Locations N O IT A CI L P P A T N E V P O T APPLICATION TOP VENT TN EV PO T NOI TA CI LP PA RECESSED INSTALLATION TOP VENT APPLICATION ...
Page 6 - VENT TERMINATION CLEARANCES; These instructions should be used as a; Vertical Vent Termination Clearances; Termination Heights For Vents; Figure 6; Horizontal Vent Termination Clearances; Side Elevation View; Minimum; Figure 4 - Multiple Terminations
6 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. 12 X Roof Pitch is X/12 2 FT MIN. 2 FT MIN. Lowest Discharge Opening H* *H = MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING OF VENT TERMINATION HEIGHTS FOR VENTS ABOVE FLAT OR SLOPED ROOFS Horizontal Overhang Vertical Wall Vent Termination...
Page 7 - EXTERIOR HORIZONTAL VENT TERMINATION CLEARANCE REQUIREMENTS; Figure 7
7 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. EXTERIOR HORIZONTAL VENT TERMINATION CLEARANCE REQUIREMENTS Figure 7 V V V V V F C Fixed Closed Window Operable Window B B A B H M I = Area where Termination is not Permitted = Air Supply Inlet X = Vent Termination V D V 3 ft. 3 ft. A A A = 9” i...
Page 8 - MINIMUM CLEARANCES TO COMBUSTIBLES; When the; Hearth Extension; not be allowed to en-croach the area defined by the appliance front; Table 5
8 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. 5 (127) 8-1/4 (209) 14 (356) 12 (305) 19 (483) *Shelf Height ( see table) Do not insulate the space between the appliance and the area above it. Shelf Above Fireplace With Top Venting 8 (203) 2 (51) 4 (102) 6 (152) 8 (203) 10 (254) 12 (305) 10 (...
Page 9 - Figure 12 - Nailing Flanges; Figures; Left Side Front Corner of Fireplace Shown; TYPICAL INSTALLATION SEQUENCE; Figure; a. Millivolt Appliances – Install the; PRE-INSTALLATION STEPS; Removing Glass Panels on
9 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. WARNING Failure to position the parts in accordance with these diagrams or failure to use only parts specifi- cally approved with this appliance may result in property damage or personal injury. AVERTISSEMENT Risque de dommages ou de blessures s...
Page 10 - FIREPLACE AND FRAMING SPECIFICATIONS; Vertical Venting Through the Ceiling:; Frame ceiling opening; - Use a plumb line from the ceiling above the appliance to; Framing; Framing should be; Front View
Efficiencies (%) Model Natural Gas Propane AFUE EnerGuide (P4) AFUE EnerGuide (P4) SLDVT-30 57 51 58 54 SLDVT-35 59 59 61 61 SLDVT-40 62 61 64 61 SLDVT-45 64 59 66 61 10 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. FIREPLACE AND FRAMING SPECIFICATIONS Vent Size Coaxial DV Vent Size 4-1/2"...
Page 11 - Table 6; Proper Sizing of Gas Line; Figure 15 - Route Gas Line; Step 2. ROUTING GAS LINE; mm
11 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. FIREPLACE FRAMING SPECIFICATIONS Figure 14 - Corner Framing with Horizontal Termination Inches (millimeters) C Back wall of chase/enclosure (including any finishing materials) D E A B 7 (178) Schedule 40 Black Iron Pipe Inside Diameter (Inches)...
Page 12 - Approved Vent Components
12 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. Installation of Vent Restrictor A vent restrictor may be needed with this appliance. The restrictor is installed in the appliance top flue outlet as shown in Figure 16 , either before adding vent, from above, or after installation of vent from ...
Page 13 - Note: Convert inches into metric equivalent; Effective Vent Length; Model; Table 7; Figures 25 through; Secure FlexTM pipe may also be used. A Vertical; Figure 5; on; Tables on this page
13 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. Note: Convert inches into metric equivalent measurement, as follows: Millimeters (mm) = Inches x 25.4 Centimeters (cm) = Inches x 2.54 Meters (M) = Inches x .0254 T R A H C H T G N E L N O I T C E S T N E V l a n i m o N h t g n e L n o it c e ...
Page 15 - ) can be installed in the exact same fashion; Swivel joint; Figure 22 - Roof Framing; Storm
15 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. If the vent system extends more than 5 feet (1.5m) above the roof flashing, stabilizers may be necessary. Additional screws may be used at section joints for added stability. Guide wires may be attached to the joint for additional sup- port on ...
Page 16 - as shown in; be used in this; VERTICAL VENT FIGURES/TABLES; rate sections of concentric flexible; vent will be required.
16 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. u Ceiling Firestop / Spacer (SV4.5VF) u When using Se- cure Flex, use Firestop / Spac- er SF4.5VF A Vent Restrictor, as shown in Figure 16 Page 12 , must be used in this application Figure 25 - Top Vent - STRAIGHT u Ceiling Firestop / Spacer (S...
Page 17 - Ceiling; Top Vent - THREE ELBOWS; Figures 29
17 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. Maintain a minimum 1" (25 mm) clearance to combustibles on the vertical sections. Clear- ances for the horizontal runs are; 3" (76 mm) on top, 1" (25 mm) on sides, and 1" (25 mm) at the bottom. B. Frame exterior wall opening - L...
Page 19 - tion Guard; INSTALLING HORIZONTAL TERMINATION; Venting Connection and Exterior Wall Recessing; Table 8; See
19 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. SUPERIOR DIRECT-VENT GAS FIREPLACES • MODELS SLDVT-30/35/40/45 • INSTALLATION INSTRUCTIONS j. Assemble vent run to exterior wall - If not previously measured, locate the center of the vent at the exterior wall. Prepare an opening as described i...
Page 20 - HORIZONTAL VENT FIGURES/TABLES; Typical termination shown.; Termination Kit and 6 In. Vent; zontal vent run is needed, then; Under no circumstances may separate sections of con-
20 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. See Table 8 as an aid in venting component selection for a particular range of exterior wall thicknesses. See Table 8 as an aid in venting component selection for a particular range of exterior wall thicknesses. H u Wall Firestop/Spacer (SV4.5H...
Page 21 - See Table 8 on Page 20 as an aid in venting
21 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. V H H1 Wall Firestop/Spacer (SV4.5HF) Wall Firestop/Spacer (SV4.5HF) When using Secure Flex, use Firestop/Spacer SF4.5HF. Ceiling Firestop/Spacer (SV4.5VF) Note - When using Secure Flex TM , use Firestop/Spacer SF4.5VF. Table E H + H 1 Maximum ...
Page 22 - See Table 8 on Page 20 as
22 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. Example: If 20 feet total (H+H 1 ) horizontal vent run is needed, then 4 feet minimum of (V) vertical vent will be required. This table shows a 1(V) to 5(H) ratio. For every 1 foot of (V) vertical, you are allowed 5 feet of (H+ H 1 ) horizontal...
Page 24 - Page; CAUTION; Verify proper operation after servicing.
24 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. SUPERIOR DIRECT-VENT GAS FIREPLACES • MODELS SLDVT-30/35/40/45 • INSTALLATION INSTRUCTIONS Step 4. FIELD WIRING B. Electronic Wiring (See Figure 38 ) – Note: The electronic appliance must be con- nected to the main power supply. 1. Route a 3-wi...
Page 25 - If an optional control is to be used, wire it in; After the wiring is complete, replace the; WIRING - OPTIONAL FORCED AIR; Blower Access
25 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. SUPERIOR DIRECT-VENT GAS FIREPLACES • MODELS SLDVT-30/35/40/45 • INSTALLATION INSTRUCTIONS Note: Remote receiver should be located in the wall, or if installed in the control compartment, pulled all the way forward and completely to the left or...
Page 26 - Step 6. CONNECTING GAS LINE
26 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. Gas Flex Line Gas Shut-Off Valve Valve Piezo Spring Door Latch Lower Control Compartment SUPERIOR DIRECT-VENT GAS FIREPLACES • MODELS SLDVT-30/35/40/45 • INSTALLATION INSTRUCTIONS Figure 41 Step 6. CONNECTING GAS LINE All codes require a shut-o...
Page 27 - Never use an open flame to; GLOWING EMBERS AND LOGS; Remove the front glass enclosure panel
27 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. Turn on gas supply and test for gas leaks, us- ing a gas leak test solution (also referred to as bubble leak solution). Note: Using a soapy water solution is an effective leak test solution but it is not recom- mended, because the soap residue ...
Page 28 - Glowing Embers for several applications, do; Place Volcanic; Bag of Glowing
28 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. REFERENCE Firebox Accessories / Parts Cat. No. Model No. Description 88L53 FGE Bag of Glowing Embers 80L42 FDVS Bag of Decorative Volcanic Stone Volcanic Stone 4. Placement of Glowing Embers - Separate the Embers (rockwool) into pieces about th...
Page 29 - Catalog Number for the entire
29 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. SLDVT-30 AND SLDVT-35 LOG PLACEMENT Figure 47 Step 2 Step 3 Step 4 3 Left Rear Brackets Step 1 Align hole at the bottom of left front log (1) over the left front brackets and the right front log over the right front brackets. 2 Align the hole a...
Page 30 - SLDVT-40 LOG PLACEMENT; Ember Chunk
30 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. SLDVT-40 LOG PLACEMENT Step 2 Step 3 Step 1 4 2 Right Front Log "Nub" 3 Step 4 Log Number Description 1 Ember Chunk 2 Left Front Log 3 Right Front Log 4 Left Rear Log 5 Right Rear Log Catalog Number for the entire log set: H7245 4 5 3 2...
Page 31 - SLDVT-45 LOG PLACEMENT; Left Front Log
31 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. SLDVT-45 LOG PLACEMENT Step 2 Step 3 Step 1 Step 4 Figure 49 Log Number Description 1 Left Front Log 2 Right Front Log 3 Center Log 4 Left Rear Log 5 Right Rear Log Catalog Number for the entire log set: H7547 Rest the bottom of log (5) over th...
Page 32 - ) by lifting and pulling the
32 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. Step 9. REMOVING AND INSTALLING THE GLASS DOOR Air Shutter Adjustment Guidelines : Amount of Primary Air Flame Color Air Shutter Adjustment If air shutter is closed too far Flame will be orange Air shutter gap should be increased If air shutter...
Page 33 - Main Burner Factory Air Shutter; Burner Air Shutter Adjustment; Locate adjustment rod and adjust air shutter to the standard set-; ting as shown in; Burner Air Shutter Adjustment Procedure
33 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. WARNINGS • Air shutter adjustment should only be performed by a qualified professional service technician. • Ensure front glass panel are in place and sealed during adjustment. CAUTIONS • Soot will be produced if the air shutter is closed too m...
Page 34 - See Page 5 for Cold Climate Insulation; Combustible Wall Framing
34 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. Step 11. HOOD INSTALLATION (Refer to Figure 55) All of these appliances must have hoods installed prior to operating. Install hood by sliding it into the slots on the lower edge of the cabinet top . FINISHING REQUIREMENTS - Wall Details Complet...
Page 35 - ) o en el termostato; WARNINGS; ) and if used on the; Figure A
35 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. STEP 12. ATTACHING SAFETY-IN-OPERATION WARNINGSIt is the installer’s responsibility to ensure these warnings are properly affixed during installation. These warning labels are a critical step in informing consumers of safe operation of this app...
Page 36 - rigid; INSTALLATION ACCESSORIES; Listed Secure VentTM Components
36 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. Cat. No. Model Description Vent Sections (Rigid) 77L70 SV4.5L6 6 Inch (152 mm) 77L71 SV4.5L12 12 Inch (305 mm) 77L72 SV4.5L24 24 Inch (610 mm) 77L73 SV4.5L36 36 Inch (914 mm) 77L74 SV4.5L48 48 Inch (1219 mm) 77L75 SV4.5LA Telescopic Length Slip...
Page 38 - this installation assumes responsibility for this conversion.; AVERTISSEMENT; assume les responsabilités liées à la conversion.
38 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. Millivolt SIT Systems Propane Gas to Natural Gas Conversion Kits Models Catalog No. SLDVT-30 H6165 SLDVT-35 H7293 SLDVT-40 H7294 SLDVT-45 85L66 Millivolt SIT Systems Natural Gas To Propane Gas Conversion Kits Models Catalog No. SLDVT-30 H6163 S...
Page 39 - Table 9; Millivolt Appliances; Burner Assembly; ment kit is available, order Catalog Number; and replace the pilot orifice as; ELECTRONIC
39 NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. Burner Orifice Sizes Elevation 0-4500 feet ( 0-1372 meters) Model Series Nat.Gas drill size (inches) Propane drill size (inches) SLDVT-30 #50 (0.070")* H4873 • #61 (0.039")* 35M91 • SLDVT-35 (0.0748")* H1355 • (0.045")* 75L10 • ...