Page 3 - Contents; Note
Contents Fluid Cooler Location ............................................................................. 5 Fluid Cooler Shipment ............................................................................ 6 Receiving Fluid Cooler ....................................................................
Page 4 - Preparation; Safety First; WarNiNg; gain access to the fan deck or maintenance access doors; Warning
4 Preparation The Marley MH Fluid Cooler with CoolBoost™, purchased for this instal-lation represents the current state of the art in crossflow, induced draft fluid cooler design. Thermally and operationally, it is the most efficient fluid cooler of its class. These instructions—as well as those off...
Page 5 - Fluid Cooler Location
5 Preparation It is not intended nor assumed that access to the fan deck on single-flow models—Models MHF702 thru MHF705—is needed or necessary. Those are only some of the safety issues that may arise in the design process. SPX strongly recommends that you consult a safety engineer to be sure that a...
Page 6 - Forklifting from base of fluid cooler; The clips for the top modules are located at the fan; Hoisting-installation; label; Installation
6 The fluid cooler must be located at such distance and direction to avoid the possibility of contaminated fluid cooler discharge air be-ing drawn into building fresh air intake ducts. The purchaser should obtain the services of a Licensed Professional Engineer or Registered Architect to certify tha...
Page 7 - Fluid Cooler installation; . Before setting top module in place on bottom module, clean any
7 Hoisting clips are provided for ease of unloading and positioning the fluid cooler. For overhead lifts or where additional safety is required, safety slings should also be placed under the fluid cooler modules. Under no circumstances should you combine the top and bottom modules of modular models ...
Page 8 - Motor Wiring; Either of following symbols may be shown on the motor nameplate –; . These symbols represent how the motor is constructed on; When using a starter:; • Set motor overload protection to 110% of motor nameplate amps.
8 Fasteners and components provided by others that are to be at-tached to the tower must be compatible with the cooling tower materials—i.e. fasteners in a stainless steel cold water basin must be stainless steel. 6. Attach process fluid supply and return piping to the coil. Field piping connection ...
Page 9 - When using a; six
9 • Do not start the motor more than six times per hour. Short cycling the tower will cause fuses, breakers or O.L.s to operate and will decrease motor life. When using a two-speed starter: • Motor rotation must be the same at slow speed and high speed.• Single winding motor requires a starter with ...
Page 11 - Mechanical Equipment:; If equipped, check oil level in accordance with the
11 Mechanical Equipment: The fluid cooler is designed to operate at full speed and half speed. Warranty is void if the tower is operated at speeds which cause damaging vibrations to the tower and associated equipment. When utilizing a variable frequency drive, the tower must be tested across the ful...
Page 12 - Run the motor and observe the operation of the mechanical equip-
12 It is essential that the fan cylinder and fan guard be installed in ac-cordance with the drawings shipped with the tower. Do not force the fan cylinder out of round. 4. Momentarily bump (energize) the motor(s) and observe rotation of the fan(s). If rotation is backwards, shut off the fan and reve...
Page 13 - Fluid Cooler Start-Up; must; Operation
1 Fluid Cooler Start-Up Among other sources, outbreaks of Legionnaires’ Disease have report-edly been traced to cooling towers and fluid coolers. Maintenance and water treatment procedures that prevent amplification and dissemina-tion of Legionella and other airborne bacteria should be formulated an...
Page 15 - Fluid Cooler Operation; With the fan in full operation, if the heat load increases,; or — in SI units
15 Fluid Cooler Operation general: The cold process fluid temperature obtained from an operating fluid cooler will vary with the following influences: 1. Heat load: With the fan in full operation, if the heat load increases, the cold process fluid temperature will rise. If the heat load reduces, the...
Page 16 - “Cooling Tower Energy and its Management”; Technical Report; Wintertime Operation:; Caution
16 4. air flow rate: Reducing air flow through the fluid cooler causes the cold process fluid temperature to rise. This is the recommended method by which to control leaving process fluid temperature. If your fluid cooler is equipped with a single-speed motor, the motor may be shut off when the proc...
Page 17 - under; . Under extended extreme cold conditions, it may be necessary to op-
17 Slushy, transitory ice forms routinely in the colder regions of the fill of low temperature towers, and is visible through the tower louvers. Such ice normally has no adverse effect on fluid cooler operation, but its appearance should be a signal to the operator to undertake ice control procedure...
Page 18 - not; intermittent Wintertime Operation:; Basin heaters systems will not prevent the coil from freezing.; Protection against Coil Freezing:
18 Reversal may be at either full or half speed; however, reversal at half speed is recommended. Reverse operation of the fan should be used sparingly and should only be used to control ice, not to prevent it. Reverse fan operation should not need to exceed 1 or 2 minutes. Monitor-ing is required to...
Page 19 - Maintain sufficient flow rate through the coil.
19 When the use of industrial antifreeze solutions is not possible, the system must be operated to meet both of the following conditions. 1. Maintain sufficient flow rate through the coil. 2. Maintain sufficient heat load on the process fluid. Fluid exiting the coil must be maintained at or above 45...
Page 20 - Water Treatment and Blowdown; Maintaining Water Quality:; • An atmosphere surrounding the tower no worse than “moderate indus-
20 Water Treatment and Blowdown Maintaining Water Quality: The steel used in MH Fluid Cooler's has been galvanized with a heavy zinc coating averaging 2.0 mils in thickness. Other materials used (PVC fill, drift eliminators, and louvers, aluminum fans, cast iron Geareducer, etc.) are selected to off...
Page 21 - Fluid Cooler Cleaning:; Maintenance
21 Fluid Cooler Cleaning: Any evaporative-type fluid cooler must be thoroughly cleaned on a regular basis to minimize the growth of bacteria, including Legionella Pneumophila, to avoid the risk of sickness or death. Service personnel must wear proper personal protective equipment during decontami-na...
Page 22 - 00 GPM circulating rate, 18°F cooling range. To maintain 4; Belt Tensioning; See; Figure 1; and; Figure 2; for MH Fluid Cooler models MHF702 thru
22 (percent of flow) required to maintain different concentrations with various cooling ranges*: * Range = Difference between hot water temperature and cold water temperature. EXaMPLE: 700 GPM circulating rate, 18°F cooling range. To maintain 4 concentrations, the required blowdown is 0.458% or .004...
Page 23 - Figure 3; for MH Fluid Cooler models MHF706 and MHF707.The belts; Figure 1; SINGLE MOTOR—TWO FANS; Figure 2
2 Maintenance See Figure 3 for MH Fluid Cooler models MHF706 and MHF707.The belts are adjusted by turning the threaded rod. Before tightening or loosening the belt, the double nuts holding the motor support in place must be loosened.There are two jam nuts at the end of the rod next to the casing. Tu...
Page 24 - Sheave alignment; SHEAVE
24 Maintenance sion is the lowest tension at which the belt will not slip under peak load conditions. Check tension frequently during the first 24-48 hours of run-in operation. Overtensioning shortens belt and bearing life. Keep belts free from foreign material which may cause slipping. Never apply ...
Page 25 - Fluid Cooler Maintenance
25 Fluid Cooler Maintenance Some maintenance procedures may require maintenance personnel to enter the fluid cooler. Each cased face of the fluid cooler has a door for access to the interior of the tower. The optional fan deck ladder—models MHF706 and MHF707— is de-signed and intended solely for per...
Page 27 - Motor relubrication instructions; Figure 4
27 additional cleaning. Refer to “Fluid Cooler Cleaning” section—page 21. Consult your water treatment expert as to prudent biological evaluation testing. Geareducer models used on MH Fluid Coolers are designed for 5-year oil change intervals. To maintain five-year change intervals, use only oil des...
Page 28 - Seasonal Shutdown instructions
28 . Insert grease fittings in grease fill openings and add grease until grease is forced out through relief openings. 4. Replace fill plugs and operate mechanical equipment 0 minutes to one hour to purge excess grease at grease relief opening. 5. Reinstall grease relief plugs and reinstall guard. 6...
Page 29 - Fluid cooler framework:; Fan User Manual; “Electric Motor User Manual”; Prolonged Shutdown
29 has remained effective. Unless there is evidence of a generalized failure of the galvanizing, localized touch-up should be all that is required. To the extent that the galvanizing (zinc coating) still exists, paint will not adhere to it readily. Contact the manufacturer of the coating you intend ...
Page 30 - SPX Cooling Technologies Services; A complete stock of parts and components is main-; Periodic maintenance:; You may wish to contract with SPX Cooling for
0 SPX Cooling Technologies Services Our interest in your MH Fluid Cooler does not end with the sale. Having conceived, designed, and manufactured the most reliable and longest-lasting fluid cooler of its class, we want to make sure that you gain the maximum possible benefit from its purchase. Theref...
Page 31 - Maintenance Schedule
1 Maintenance Schedule Maintenance Service Monthly Semi-annually Seasonal Startup or annually Inspect General Condition and Operation x x Observe Operation of: Mechanical–motor, fan and drive mechanism x x Makeup valve (if equipped) x x Inspect for unusual noise or vibration x x inspect and Clean: A...
Page 32 - Troubleshooting; Trouble
2 Troubleshooting Trouble Cause remedy Motor will not start Power not available at motor terminals Check power at starter. Correct any bad connections between the control apparatus and the motor. Check starter contacts and control circuit. Reset overloads, close contacts, reset tripped switches or r...
Page 34 - increased load requirements:; MH Fluid Coolers are designed so that; Fluid cooler rebuilding:; SPX routinely rebuilds and upgrades fluid coolers; Additional Information
4 increased load requirements: MH Fluid Coolers are designed so that cells of either equal or unequal capacity can be added in the future. This allows you to compensate for the load increases that normally occur with the replacement or addition of production equipment—and still retain continuity wit...
Page 36 - Cooling Technologies
Manual 05-116D / 7401 W 129 Street // Overland Park, KS USA 66213 // +1 913 664 7400 // [email protected] // spxcooling.com / In the interest of technological progress, all products are subject to design and/or material change without notice. ©2007 SPX Cooling Technologies, Inc. | Printed in USA...