Lennox 10ACB - Manuals

Lennox 10ACB – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12

Summary

Page 3 - WARNING; Unit must be grounded in accordance with nation-

3DJH SETTING THE UNIT Refer to unit dimensions on page 2 for sizing mountingslab, platforms or supports. Refer to figure 1 for instal-lation clearances. INSTALLATION CLEARANCES FIGURE 1 36 (914 mm) *36 (914 mm) 36 (914 mm) NOTE—48 inch clearance required on top of unit. *NOTE—One side must be 36 inc...

Page 5 - Expansion Valve Systems; IMPORTANT; To Access Schrader Port:

3DJH Expansion Valve Systems Expansion valves equipped with either “Chatleff” or flare type fittings are available from Lennox. Refer to the indoor coil installation instructions or the engineer- ing handbook for applicable expansion valves for use with specific match--ups.If an expansion valve appl...

Page 6 - Using an Electronic Leak Detector or Halide

3DJH 3-- Replace stem cap. Tighten finger tight, then tighten an additional 1/6 turn. FIGURE 5 SUCTION LINE SERVICE VALVE (VALVE OPEN) SCHRADER VALVE SERVICE PORT SERVICE PORT CAP INSERT HEX WRENCH HERE TO INDOOR COIL TO OUTDOOR COIL STEM CAP SCHRADER VALVE OPEN TO LINE SET WHEN VALVE IS CLOSED (FRO...

Lennox Manuals