Kohler K-6269-C11-BN- Manuals

Kohler K-6269-C11-BN– Installation Manual in PDF format online.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20

Summary

Page 2 - Before You Begin; Before finishing the wall, ensure the supply; Avant de commencer; ATTENTION: Risque d’endommagement du matériel.; Avant de terminer le mur,; Lambourde de 2x4

Tools/Outils/Herramientas Before You Begin CAUTION: Risk of property damage. Before finishing the wall, ensure the supply lines are connected to the mixer valve with the cold supply line plumbed on theleft and the hot supply line plumbed on the right. Doing so will avoid replacingthe finished wall d...

Page 3 - mur soit installée afin d’éviter le gel des tuyaux.; Antes de comenzar; PRECAUCIÓN: Riesgo de daños a la propiedad.; Antes de terminar la pared,

Avant de commencer (cont.) NOTICE: Pour des installations de mur extérieur, s’assurer qu’une bonne isolation du mur soit installée afin d’éviter le gel des tuyaux. Respecter tous les codes de plomberie et de bâtiment locaux.Couper l’alimentation d’eau principale.Inspecter avec précaution la tuyauter...

Page 4 - Prepare the Site; Install the Framing; The mixer valve requires special framing and support.; Attach the Mixer Valve; Préparer le site; Installer le cadrage; Le mélangeur nécessite un cadrage et un support spéciaux.

1. Prepare the Site Install the Framing NOTE: The mixer valve requires special framing and support. Construct the framing for the faucet installation. A suggested framing example is illustrated.Verify the constructed framing is level and will be parallel to the finished wall. Adjust as needed. Attac...

Kohler Manuals