Kohler 9948-47- Manuals

Kohler 9948-47– Installation Manual in PDF format online.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24

Summary

Page 2 - Required for installations with grab bars.

Tools and Materials Before You Begin Observe all local plumbing and building codes. Locate the rough plumbing for the drain in accordance with the roughing-in dimensions for yourparticular model. This shower receptor is designed for an alcove installation. These instructions show suggestedinstallati...

Page 3 - Flange Detail

Roughing-In NOTICE: All dimensions are nominal. The stud opening tolerance is +1/4 ″ (6 mm) and -0 (0 mm). Carefully measure your fixture before determining enclosure size. When a fire-rated wall is specified,dimensions are to the inside of the wall board. Some shimming between the stud frame and th...

Page 4 - Install the Plumbing; after; Front; Receptor; Front View

1. Install the Plumbing NOTE: Follow all local codes, standards, and regulations. Locate rough plumbing for the drain according to the correct model’s roughing-in dimensions. Referto the roughing-in provided with this guide. NOTE: If the plumbing will be located on an unfinished stud wall, install t...

Kohler Manuals