Haier 1U18ES2VHA - Manuals

Haier 1U18ES2VHA – Installation Manual in PDF format online.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10

Summary

Page 2 - Required Tools for Installation; Procedure for Selecting the Location; • Since drain flows out of the outdoor unit,; Clearances of Indoor and Outdoor Units

INSTALLATION PAGE 2 ENGLISH Step 1 - Preparation Required Tools for Installation Procedure for Selecting the Location • Drill • Wire Snipper • Hole Saw 2 3/4” • Vacuum pump • Soap-and-water solution or gas leakage detector • Torque wrench • 17mm, 22mm, 26mm • Tubing cutter • Flaring tool • Razor kni...

Page 3 - Screw the mounting plate to the wall.; Piping Exit Options; Step 2 - Installation of the Indoor Unit

INSTALLATION PAGE 3 ENGLISH 2.1 Step 2.1 Using a stud sensor, locate and mark the stud positions in the wall where the indoor unit is to be mounted. 2.2 Step 2.2 Place the mounting plate on the wall in the desired location taking into account the minimum clearances necessary for proper operation. Us...

Page 4 - Illustration 2; Extension piping to attach to this fitting is field supplied.; Mounting the Indoor Unit Onto the Wall Plate

INSTALLATION PAGE 4 ENGLISH Illustration 2 Illustration 3 2.9 Step 2.9 With the top of the indoor unit closer to the wall, hang the indoor unit on the upper hooks of the mounting plate. Slide the unit slightly side to side to verify proper placement of the indoor unit on the mounting plate. Rotate t...

Haier Manuals