Emerson THROUGH 1200- Manuals

Emerson THROUGH 1200– User Manual, Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11

Summary

Page 2 - Rating Label; Do not exceed the values on the rating label.; Nameplate

Rating Label Each Automatic Closed–Transition Transfer Switch contains a rating label to define the loads and fault circuit withstand/ closing ratings. Refer to the label on the Transfer Switch for specific values. Do not exceed the values on the rating label. Exceeding the rating can cause personal...

Page 5 - INSTALLATION; Engine Starting Contacts; Functional Test; – Manual Operation Test

INSTALLATION (continued) 1 --- 2 Engine Starting Contacts All customer connections, including the engine controlcontact connections, are located on terminal block TBwhich is mounted on the top right side of the enclosure.Refer to the wiring diagram provided with the automatictransfer switch and conn...

Page 6 - – Voltage Checks

INSTALLATION (continued) 1 --- 3 1 – Manual Operation Test A detachable maintenance handle is provided on the frameof the Transfer Switch for maintenance purposes only.Manual operation of the transfer switch should bechecked before it is energized (operated electrically). Do not manually operate the...

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11

Summary

Page 2 - Rating Label; Do not exceed the values on the rating label.; Nameplate

Rating Label Each Automatic Closed–Transition Transfer Switch contains a rating label to define the loads and fault circuit withstand/ closing ratings. Refer to the label on the Transfer Switch for specific values. Do not exceed the values on the rating label. Exceeding the rating can cause personal...

Page 5 - INSTALLATION; Engine Starting Contacts; Functional Test; – Manual Operation Test

INSTALLATION (continued) 1 --- 2 Engine Starting Contacts All customer connections, including the engine controlcontact connections, are located on terminal block TBwhich is mounted on the top right side of the enclosure.Refer to the wiring diagram provided with the automatictransfer switch and conn...

Page 6 - – Voltage Checks

INSTALLATION (continued) 1 --- 3 1 – Manual Operation Test A detachable maintenance handle is provided on the frameof the Transfer Switch for maintenance purposes only.Manual operation of the transfer switch should bechecked before it is energized (operated electrically). Do not manually operate the...

Emerson Manuals