Summary

Page 2 - Remove the Transfer Switch; This is; Mounting

SECTION 1 INSTALLATION 1--1 The ASCO 7000 Series Automatic Transfer & Bypass– Isolation Switch (ATB) consists of an upper bypass–isola- tion switch, a transfer switch, a monitoring and transfercontroller, and door–mounted controls. The ATB is factory wired and tested. Installation requires remov...

Page 3 - INSTALLATION; Connecting Power Conductors; Bus Connections; Bolt Diameter; Harnesses; Wiring Diagram

INSTALLATION (continued) 1--2 Connecting Power Conductors A Wiring Diagram is furnished with the ATB. All wiring must be made in accordance with the local codes. After the power cables have been tested, connect them to theappropriate terminal lugs on the Bypass Switch as shown on the wiring diagram ...

Page 4 - Install the Transfer Switch; BYPASS POS; Do not apply any electrical power to the ATB yet.; NORMAL; NOTE; Figure1–2. Solenoid latch interference tag.

INSTALLATION (continued) 1--3 Install the Transfer Switch After the enclosure is installed and power cables or bus connected to the Bypass Switch, the Transfer Switch carriage can be rolled in. The floor of the cabinet must befree of debris and clean. If necessary, use a vacuum cleaner. Make a thoro...

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14

Summary

Page 2 - Remove the Transfer Switch; This is; Mounting

SECTION 1 INSTALLATION 1--1 The ASCO 7000 Series Automatic Transfer & Bypass– Isolation Switch (ATB) consists of an upper bypass–isola- tion switch, a transfer switch, a monitoring and transfercontroller, and door–mounted controls. The ATB is factory wired and tested. Installation requires remov...

Page 3 - INSTALLATION; Connecting Power Conductors; Bus Connections; Bolt Diameter; Harnesses; Wiring Diagram

INSTALLATION (continued) 1--2 Connecting Power Conductors A Wiring Diagram is furnished with the ATB. All wiring must be made in accordance with the local codes. After the power cables have been tested, connect them to theappropriate terminal lugs on the Bypass Switch as shown on the wiring diagram ...

Page 4 - Install the Transfer Switch; BYPASS POS; Do not apply any electrical power to the ATB yet.; NORMAL; NOTE; Figure1–2. Solenoid latch interference tag.

INSTALLATION (continued) 1--3 Install the Transfer Switch After the enclosure is installed and power cables or bus connected to the Bypass Switch, the Transfer Switch carriage can be rolled in. The floor of the cabinet must befree of debris and clean. If necessary, use a vacuum cleaner. Make a thoro...