Crown BWC150 - Manuals

Crown BWC150 – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26

Summary

Page 5 - TABLE 1.1: SUMMARY OF HORIZONTAL VENTING OPTIONS

2 3 TABLE 1.1: SUMMARY OF HORIZONTAL VENTING OPTIONS VENT OPTION # 1 2 3 4 CLASSIFICATION USED IN THIS MANUAL HORIZONTAL TWIN PIPE HORIZONTAL TWIN PIPE HORIZONTAL TWIN PIPE HORIZONTAL TWIN PIPE ILLUSTRATED IN FIGURE 1.2 1.3 1.4 1.4 VENT PIPE PENETRATION THROUGH STRUCTURE WALL WALL WALL WALL AIR INTA...

Page 6 - Termination fittings are never counted.; CAUTION

4 5 Approved vent components and materials - The adaptor kits listed in Table 1.5 are required to connect the venting 2. to the boiler. Starting at the boiler, the first 30 inches of the vent system, and the first elbow, must be CPVC . In addition, use only pipe that meets the following standards: C...

Page 8 - Crown

6 7 Horizontal Vent and Air Intake Terminal Location 6. - Observe the following limitations on the vent terminal location (also see Figure 1.9). When locating a concentric terminal, observe the limitations outlined below for “vent terminals”. Vent terminal must be at least 1 foot from any door, wind...

Crown Manuals