Chromalox PQ402-6 - Manuals

Chromalox PQ402-6 – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4

Summary

Page 2 - DETAILED ANALYSIS

Boiler syphons water: 1. Follow blowdown instructions. Boiler with condensate system floods overnight: 1. Vacuum breaker is not operating. Elements fail: 1. Low Water Cut-Off system has failed. 2. Lower equalizer tube on Low Water Cut-Off is clogged due tolack of blowdown. 3. Contactor points have f...

Page 3 - PRESSURE CONTROL —; CONTACTOR FAILS TO ENERGIZE

If the contactor fails to energize, check for blown fuses in the control circuit. If the fuses are not blown, check the contac-tor holding coil. The holding coil can be checked by jumperingTerminal L1 of the line and Terminal No. 4 (coil lead) on thecontactor. See Figure 1. A. If the contactor fails...

Page 4 - WATER FEED MECHANISMS —

2150 N. RULON WHITE BLVD., OGDEN, UT 84404 Phone: 1-800-368-2493 www.chromalox.com LOW WATER CUT-OFF — Like the pressure control, difficul- ties can be broken down into the mechanical and electricalgroups. The mechanical difficulties can be corrected on the high pres- sure 100 psig motor and pump un...

Chromalox Manuals