Cadet EBHN750-8 - Manuals

Cadet EBHN750-8 – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10

Summary

Page 2 - THERMOSTAT; PLACEMENT; BEFORE PROCEEDING WITH THE INSTALLATION INSTRUCTIONS, YOU MUST; WIRING; INSTALLATION INSTRUCTIONS; DO NOT INSTALL ANY BASEBOARD

THERMOSTAT A thermostat is required. A Cadet wall thermostat is recommended for optimum performance, or you may prefer the convenience of a built-in EBKN DPST thermostat kit. For instructions on wiring a thermostat, see the instructions that were included with your thermostat. If you are installing ...

Page 3 - STEP 1: Mount Heater to Wall

INSTALLATION INSTRUCTIONS READ ALL INSTRUCTIONS AND SAFETY INFORMATION. CAUTION - High Temperature, Keep Electrical Cords, Drapes, And Other Furnishings Away From Heater WARNING! RISK OF ELECTRICAL SHOCK. TURN OFF ALL POWER AT THE ELECTRICAL PANEL BOARD SUPPLYING POWER TO THE HEATER BEFORE DOING ANY...

Page 4 - Maintenance; HOW SOFTHEAT HYDRONIC

INSTALLATION INSTRUCTIONS Inside a Softheat baseboard a hermetically sealed heat transfer fluid isheated by an electric heating element. As the solution is heated, warmthis generated and transmitted through dozens of aluminum fins along theheater tube (it could initially take 30 to 60 minutes to war...

Cadet Manuals