Page 2 - IMPORTANT INFORMATION - READ CAREFULLY; shall be consulted before installations are made.
2 IMPORTANT INFORMATION - READ CAREFULLY NOTE: The equipment shall be installed in accordance with those installation regulations enforced in the area where the installation is to be made. These regulations shall be carefully followed in all cases. Authorities having jurisdiction shall be consulted ...
Page 4 - Table of Contents; Figure 1: Minimum Clearances to Combustibles
4 Table of Contents Figure 1: Minimum Clearances to Combustibles I. Pre-Installation ............................... 6 II. Unpack Boiler ................................ 7 III. Venting/Air Intake Piping .............. 8 IV. Water Piping and Trim ................. 45 V. Gas Piping ......................
Page 8 - Table 1: Air Intake / Vent System Options; ll
8 III. Venting / Air Intake Piping Table 1: Air Intake / Vent System Options G N I N R A W r o c i l l a t e m n o n , l e e t s s s e l n i a t s 6 1 3 e p y T r o 4 0 3 e p y T , d e z i n a v l a g h t i w r e l i o b s i h t e s u t o n o D C 4 - 9 2 L A n o n r e h t o y n a ® . s m e t s y s t...
Page 10 - General Guidelines; National Fuel Gas Code
10 A. Vent Guidelines Due to Removal of an Existing Boiler For installations not involving the replacement of an existing boiler, proceed to Step B. When an existing boiler is removed from a common venting system, the common venting system is likely to be too large for proper venting of the remainin...
Page 12 - Separate Horizontal Venting System.; Vent Piping
12 a. Wipe the male end of each joint using an alcohol pad to remove any dirt and grease. b. Align weld seams in pipes and use a slight twisting motion to FULLY insert male end into female end of joint. Ensure bead in male end of pipe is below locking band and rest against the end of the female pipe...
Page 17 - E. Separate Vertical Venting System
17 Vertical Venting – 1. Do not exceed maximum vent lengths. Refer to Table 4. 2. Installation of a vertical vent tee 8116304U is required on all vertical vent applications. See Figures 6 and 7. Attach vertical vent drain tee directly to elbow or horizontal pipe from an elbow immediately after vent ...
Page 20 - Extend V
20 Figure 8A: V ertical V e nt/Air T ermination (3” V ent T erminal) Extend V ent/Air Intake Piping to maintain minimum vertical (“X”) and minimum horizontal (“Y”) distance of twelve (12) inches fr om roof surface. Allow additional vertical (“X”) distance for expected snow accumulation.
Page 22 - Figure 9: Vertical Air Intake Piping
Page 23 - Combination Horizontal Venting System –SCG-3 Through SCG-6 ONLY –
23 F. Combination Horizontal Venting System –SCG-3 Through SCG-6 ONLY – See Figures 10 and 11. E C I T O N t o n s t n e n o p m o c s e r i u q e r m e t s y s t n e v s i h T . r e l i o b e h t h t i w d e i l p p u s 1. Do not exceed maximum vent/air intake lengths. Refer to Table 4. 2. Install ...
Page 25 - Figure 10: Combination Horizontal – V
25 Figure 10: Combination Horizontal – V ent/Air Installation (SCG-3 thru 6)
Page 27 - Combination Vertical Venting System
27 n o i t p i r c s e D r e b m u N t r a P 4 - G C S & 3 - G C S 6 - G C S & 5 - G C S r e b m u N t r a P n o t r a C t n e V 1 0 - 2 2 2 0 0 1 1 0 - 3 2 2 0 0 1 e e T r e t r a t S 1 0 - 4 2 2 0 0 1 1 0 - 5 2 2 0 0 1 r o t p a d A r i A / t n e V 1 0 - 6 2 2 0 0 1 S T N E N O P M O C M E...
Page 28 - must; Clearances to Combustibles:
28 1. Saf-T Vent SC is an advanced concentric vent system designed for zero clearance installation in residential applications. The inner wall is constructed from superferritic AL29-4C ® stainless steel. The outer wall is also constructed from stainless steel, providing durability and a lasting fi n...
Page 29 - Vertical Installation Requirements:
29 • For a venting system that extends through any zone above that on which the connected appliance is located (except for one and two family dwellings), the vent system shall be enclosed with an enclosure having a fi re resistance rating equal to or greater than that of the fl oor or roof assemblie...
Page 30 - Joint Assembly Instructions:
30 7. Joint Assembly Instructions: a. Before joining the sections or fi ttings together, use an alcohol pad to wipe the joint area of both ends of the inner pipe. This will remove any foreign matter which may affect the integrity of the seal. Install the system with the female ends (ends with the re...
Page 33 - Horizontal Supports:
33 11. Horizontal Supports: Saf-T Vent SC must have supports for every six (6) feet of horizontal run and after every transition from vertical to horizontal. Support hangers by themselves do not maintain the necessary clearances to combustible materials; be sure to consider clearances when planning ...
Page 34 - Support Legs Rotated Horizontally:; connection. The legs can be cut to shorter lengths if necessary.
34 Support Clamp, (4_ _27SS): Support clamps are sold in pairs and can be clamped around the vent and suspended from a rod or cable. They can be used singularly as a saddle clamp to rest the vent in and suspended from two (2) rods or cables. Support Legs Rotated Horizontally: Support legs can be use...
Page 37 - Vertical; Install Vent Terminal.; Horizontal; Indoor Air Installation –
37 Vertical – 10. Installation of a vertical vent tee 8116304U is required on all vertical vent applications. See Figure 6. Attach vertical vent drain tee directly to elbow or horizontal pipe from an elbow immediately after vent connector. 11. Install fi re stops where vent passes through fl oors, c...
Page 41 - Air Intake Piping
41 1. Do not exceed maximum vent/air intake lengths. Refer to Table 4. 2. This installation will allow a maximum of fi ve (5) feet vertical exterior run of the vent/air intake piping to be installed on separate horizontal venting and indoor air horizontal venting. E C I T O N t n e l a v i u q e n i...
Page 45 - IV. Water Piping and Trim; LWCO Location
45 A. Design and install boiler and system piping to prevent oxygen contamination of boiler water and frequent water additions. 1. There are many possible causes of oxygen contamination such as:a. Addition of excessive make-up water as a result of system leaks. b. Absorption through open tanks and f...
Page 46 - Figure 23: Recommended Piping for Combination
46 draining the heating system. Many probe LWCO manufacturers recommend an annual inspection of the probe. How to Wire Ensure power is turned off to boiler. Locate the LWCO jumper wire in the factory wiring harness. Remove the jumper wire and install the LWCO wiring from LWCO Model 1100-H4 (P/N 45-1...
Page 47 - it must be mounted; Oil, grease, and other foreign materials; which; After the boiler and system have been cleaned and; and before refi lling the entire system add
47 Figure 24: Supply Water Manifold Piping Install pipe tee between circulator and boiler return along with second tee in supply piping as shown in Figure 25 or 26. Bypass should be same size as the supply and return lines with valves located in bypass and supply outlet as illustrated in Figure 25 o...
Page 50 - Table 5: Gas Ratings; Table 6: Specifi c Gravity Correction Factors
50 V. Gas Piping Table 5: Gas Ratings For materials or conditions other than those listed above, refer to National Fuel Gas Code , NFPA54/ANSI Z223.1, or size system using standard engineering methods acceptable to authority having jurisdiction. Table 6: Specifi c Gravity Correction Factors G N I N ...
Page 51 - boiler gas valve to gas supply system.
51 Table 7: Maximum Capacity of Schedule 40 Pipe in CFH* For Gas Pressures of 0.5 psig or Less Figure 27: Recommended Gas Piping Table 8: Equivalent Lengths of Standard Pipe Fittings & Valves B. Connect boiler gas valve to gas supply system. G N I N R A W n o s d n u o p m o c d a e r h t r e p ...
Page 53 - A separate electrical circuit must be; run from; Refer to; Figures 28 and 29 for details on the internal
53 VI. Electrical G N I N R A W l a c i s y h p s u o i r e s n i t l u s e r y a m r e l i o b e h t o t s n o i t c e n n o c l a c i r t c e l e e r i w y l r e p o r p o t e r u l i a F . m r a h e r o f e b f f o s i r e w o p l l a e r u s e k a M . e c r u o s e n o n a h t e r o m m o r f e ...
Page 55 - Figure 29: Internal Boiler Wiring Ladder Diagram
55 Figure 29: Internal Boiler Wiring Ladder Diagram E C I T O N e h t n i n w o h s r e p m u j t i m i l y r a i l i x u a e h t h t i w s e i r e s n i l l a t s n i , d e s u s i t i m i l m e t s y s l a n o i t i d d a n a f I . w o l e b g n i w a r d
Page 56 - System Controls and Wiring; Set the thermostat heat anticipator to 0.60 amps.
56 D. System Controls and Wiring 1. Refer to National Electric Code or Local Electric Codes for proper size and type of wire required. Follow Code. 2. Use anti-short bushings on all wiring passing through boiler jacket, junction boxes and/or control boxes. 3. Use armored cable (BX) over all exposed ...
Page 57 - iring Schematic for Single Zone Space Heating Only
57 Figure 30: System W iring Schematic for Single Zone Space Heating Only
Page 62 - VII. Modular Installation; Table 9: Modular Boiler Water Manifold Sizing
62 A. General Guidelines 1. Read and follow all venting, combustion air, water piping, gas piping and electrical instructions contained in this manual unless otherwise instructed in this section. 2. Consult Local Building Codes or National Fuel Gas Code, NFPA 54/ANSI Z222.3 for restrictions and inst...
Page 63 - Figure 35: Modular Boiler Gas Piping
Page 65 - Figure 36: Operating Instructions
Page 70 - Figure 42: Flue and Burner Cleanout, 1” Burner
Page 89 - Warning; AVOID Breathing Fiber Particulates and Dust; Precautionary Measures; respirator; First Aid Procedures
89 n o i t a m r o f n I y t e f a S t c u d o r P t n a t r o p m I t c u d o r P r e b i F c i m a r e C y r o t c a r f e R Warning : This product contains refractory ceramic fi bers (RCF). RCF has been classifi ed as a possible human carcinogen. After this product is fi red, RCF may, when expose...
Page 90 - SERVICE RECORD; DATE
Page 92 - Limited Warranty; FOR RE
w a ter b oiler for it s intended p u rpo s e s a nd it s m a inten a nce a ccord a nce with U. S . Boiler Co., Inc. recommend a tion s a nd hydronic s ind us try s t a nd a rd s . The s e w a rr a ntie s will b e in a pplic ab le if the re s identi a l gr a de w a ter b oiler i s us ed or oper a te...