Page 2 - IMPORTANT INFORMATION - PLEASE READ THIS PAGE CAREFULLY; USA BOILERS
IMPORTANT INFORMATION - PLEASE READ THIS PAGE CAREFULLY 1. THIS BOILER HAS LIMITED WARRANTIES, COPIES OF WHICH ARE PRINTED ON THE BACK COVER OF THIS MANUAL. 2. THIS BOILER IS SUITABLE FOR INSTALLATION ON COMBUSTIBLE FLOORING. BOILER CAN NOT BE INSTALLED ON CARPETING. 3. ALL BOILERS MUST BE INSTALLED...
Page 3 - Figure 1: LETM Packaged Boiler
3 I. General Information I. General Information .................................. 3 II. Installation Instructions ............................ 5 III. Operating and Service Instructions .......... 12 TAbLE OF CONTENTS Figure 1: LE™ Packaged Boiler 1 . INSPECT SHIPMENT carefully for any signs of dama...
Page 4 - Alternate method for boiler located within; Figure : Minimum Installation Clearances To
4 3 . PROVIDE COMBUSTION AND VENTILATION AIR. Local code provisions may apply and should be referenced. G N I N R A W r i a n o i t a li t n e v d n a n o i t s u b m o c e t a u q e d A r e p o r p e r u s s a o t d e d i v o r p e b t s u m . n o i t s u b m o c A. Determine volume of space (boile...
Page 5 - II. Installation Instructions
II. Installation Instructions Figure 3: Hinge Installation & Assembly, LE Boiler 1. REMOVE CRATE A. Remove all fasteners at crate skid.B. Lift outside container and remove all other inside protective spacers and bracing. Remove container containing Safety Relief Valve, Boiler Drain Valve and Pip...
Page 10 - Refer to EC5000 Manual for wiring and operation details.; SEQUENCE OF OPERATION
10 Figure 11B: Wiring Diagram for LE Boilers with Beckett AFG Burner, EC000 Control, and Honeywell L4080B High Limit SEQUENCE OF OPERATION Refer to EC5000 Manual for wiring and operation details. SEQUENCE OF OPERATION A call for heat by the thermostat energizes the L7248C control which in turn energ...
Page 11 - Figure 11C: Wiring Diagram for LE Boilers with Riello Burner
11 Figure 11C: Wiring Diagram for LE Boilers with Riello Burner
Page 12 - III. Operating and Service Instructions
1 III. Operating and Service Instructions 1. ALWAYS INSPECT INSTALLATION BEFORE STARTING BURNER. 2. FILL HEATING SYSTEM WITH WATER. NOTE: It is important to properly remove the oil and dirt from the system. CLEAN HEATING SYSTEM If boiler water is dirty, refer to step 13 for proper cleaning instructi...
Page 13 - Error; TABLE 4: LED ERROR CODES; Action; TABLE : L48 CONTROLLER OPERATING
13 Figure 1: L48 Circuit Board Layout - Horizontal Mount E. DISPLAY READOUT In the RUN mode, the Aquastat will flash "bt" (boiler temp) followed by the temperature (i.e., 220), followed by °F or °C. To read boiler settings, press the I key to read the parameter of interest. For example, pres...
Page 14 - Figure 14: Setpoints and Differentials
14 the burner output. The ZC output is energized. The controller continues to monitor the system and automatically restarts if the error condition clears. Refer to Table 4. The operating sequence for the L7248 is shown in Table 5. Figure 14: Setpoints and Differentials G. HIGH LIMIT CONTROLLER The H...
Page 16 - Filling of Boiler and System — General —-
1 Figure 1: Cad Cell Before pressing the reset button call your service- man immediately. N O I T U A C n e h w r e n r u b e h t t r a t s o t t p m e t t a t o n o D t i n u e h t n e h w , d e t a l u m u c c a s a h li o s s e c x e n o i t s u b m o c e h t n e h w r o , r o p a v f o ll u f s ...
Page 18 - Warning; AVOID Breathing Fiber Particulates and Dust; Precautionary Measures
18 Important Product Safety Information Refractory Ceramic Fiber Product Warning : The Repair Parts list designates parts that contain refractory ceramic fibers (RCF). RCF has been classified as a possible human carcinogen. When exposed to temperatures about 1805°F, such as during direct flame conta...
Page 21 - Beckett R7184 Oil Primary Control
1 V. Repair Parts All LE™ Series Repair Parts may be obtained through your local Burnham Wholesale distribu- tor. Should you require assistance in locating a Burnham Distributor in your area, or have questions regarding the availability of Burnham products or repair parts, please contact Burnham Cus...
Page 26 - SERVICE RECORD; DATE
Page 27 - minimum; ll
VI. Low Water Cut Off (LWCO) A 24 VAC LWCO is used primarily for gas fired boilers where a 24 volt control circuit exists within the boiler. However, a 24 VAC LWCO can only be used if the boiler manufacturer has provided piping and wiring connections and instructions to allow for this application. H...
Page 28 - Limited Warranty; FOR RESIDENTIAL GRADE WATER BOILERS
8 if the residential grade water boiler is used or operated over its rated capacity, is subjected to unauthorized modification, or is damaged as a result of being otherwise improperly operated or serviced including, but not limited to, damage from any of the following: operation with insufficient wa...