Page 2 - Table 1 - Models and Cross Reference Guide; Features
2 Table 1 - Models and Cross Reference Guide Beckett GeniSys Control Part No. Lockout Time Valve-on delay time 2 Motor-off delay time 2 Replaces Honeywell: Replaces Carlin: 7505A 0000 15 sec - - R7184A, R8184G 48245, 40200, 42230, 50200 1 7505B 1500 15 sec 15 sec - R7184B - 7505P 1515 15 sec 15 sec ...
Page 3 - For programming and diagnostics
3 120v GeniSys Control Installation and Operation Manual Optional Snap-on Display Module: For programming and diagnostics Optional Snap-on Alarm Module: For adding isolated low voltage alarm contacts to the base control. See Alarm Module Instructions for speci fi cations. Reset Button with Red Light...
Page 4 - Electrical Ratings; igniter current; Environmental Ratings:; Maintenance
4 Electrical Ratings Inputs: Voltage: 120 Vac nominal (102 to 132 Vac)Current: 100 mA nominal (150 mA max at 132 Vac)Frequency: 60 Hz Outputs: Motor: 120 Vac, 10 full load amps (FLA), 60 locked rotor amps (LRA) *Note: Reduce motor FLA rating by igniter current Igniter: 120 Vac, 3 A @ 0.7 PF minSolen...
Page 5 - fl; Improper Control Operation; Connect the wire from the R
5 120v GeniSys Control Installation and Operation Manual The control can malfunction if it gets wet, leading to accumulation of oil or explosive oil vapors.Never install where water can fl ood, drip or condense on the control.Never use a control that has been wet - replace it. • • • Can cause severe...
Page 6 - Typical Boiler Wiring:
6 Figure 3 – 7505A (for replacement of R7184A) Interrupted ignition, no valve-on or motor-off delay ► Figure 4 – 7505B (for replacement of R7184B) Interrupted ignition, valve-on delay only (no motor-off delay) ► Figure 5 – 7505P (for replacement of R7184P) Interrupted ignition, valve-on and motor-of...
Page 7 - Typical Furnace Wiring:
7 120v GeniSys Control Installation and Operation Manual Typical Furnace Wiring: Figure 6 – 7505A (for replacement of R8184G) Intermittent ignition, no valve-on or motor-off delays ► SAFETY AND OPERATING LIMITS LIMIT L1 L2 (VLV) VALVE L2 MOTOR L2 (MTR) L2 (IGN) IGNITER CADCELL MOTOR IGNITER W R 80 7...
Page 8 - Fire Hazard
8 Startup / Checkout If the burner or control fails any of the following tests, recheck control wiring. If the burner or control still fails any tests, replace the control. Starting the System Open the shut-off valves in the supply line from the oil tank. Close the disconnect switch to supply power ...
Page 9 - Reset Button Operation; Table 2; Sequence of Operation; Burner States; Standby
9 120v GeniSys Control Installation and Operation Manual 2 1 3 5 6 8 4 7 Standby Motor-off delay Valve-on delay Trial for ignition Ignition carryover Run Lockout Recycle 9 Pump prime is then sent to Motor-Off Delay, if applicable, or it is shut down and sent to Standby. Recycle: If the fl ame is los...
Page 10 - Priming the Pump; tting and fully
10 If the burner is in the below state: Pushing the reset button will: Button Click (press < 1 second) Button Hold (press > 1 second) Button Hold (press 15+ seconds) Lockout Reset from Soft Lockout Reset from Restricted (Hard) Lockout Valve-on Delay, Trial for Ignition, Ignition Carryover Go t...
Page 11 - Cad Cell Resistance Measurement; Flame Detection Range; Before starting or resetting the; Disable Function
11 120v GeniSys Control Installation and Operation Manual automatically return to standby mode. If prime is not established during the four minute pump prime mode, return to step 5 to re-enter Pump Prime mode. Repeat steps 5 through 7 until the pump is fully primed and the oil is free of bubbles. Te...
Page 12 - ts, products must be; Limited Warranty Information
Form No. 61649 R14, Printed in USA 10/10 CORPORATION USA: P.O. Box 1289 ● Elyria, OH 44036 Canada: R.W. Beckett Canada, Ltd. ● Unit #3, 430 Laird Road ● Guelph, Ontario N1G 3X7 www.beckettcorp.com The R. W. BECKETT CORPORATION (“Beckett”) warrants to persons who purchase its “Products” from Beckett ...