BENDPAK 5150152 - User Manual

BENDPAK 5150152

BENDPAK 5150152 Evaporative Cooler – User Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
Page: / 40

Table of Contents:

  • Page 2 – Installation and Operation Manual; Owner Responsibility.
  • Page 3 – Table of Contents; ordered in a 110 VAC or a 220 VAC version:; DANGER
  • Page 4 – Shipping Information; before; Do not sign the bill of lading until; you have inspected the shipment.; after; Safety Considerations; Read this manual carefully before using your new product.; WARNING; Safety Information; not; Never
  • Page 5 – Symbols; Liability Information
  • Page 6 – Frequently Asked Questions; Question
  • Page 7 – Specifications
  • Page 8 – Model
  • Page 9 – Components; The Cool Boss Unit
  • Page 11 – The Cool Boss Control Panel; The figure below details the Control Panel.; Ozone generators are to be operated in unoccupied spaces only; – Push to increase the Fan speed.
  • Page 12 – CAUTION; – Push to begin playback or pause of the current audio file.; Remote Control
  • Page 13 – Setup; Tools required for Assembly:; Unboxing the Cool Boss
  • Page 14 – Installing the Casters
  • Page 15 – Installing the Media; must; be installed toward the warm air side.; The internal channels within the media; Refer to; To install the Media:; Not to scale, some components removed for clarity.
  • Page 16 – Not to scale, components removed for clarity.; toward the Warm Air Intake side; of the Cool Boss. Slide the first Media as
  • Page 19 – Find a location for your Cool Boss; full; To choose a location for the Cool Boss Cooler:; minimum
  • Page 20 – Fill the Water Reservoir; clean
  • Page 21 – Connecting to Power; Before; It is recommended that a separate; All; electrical work must be accomplished by a; licensed, certified Electrician
  • Page 22 – troubleshooting or maintenance; Minimum
  • Page 23 – Operation
  • Page 25 – Ozone Generator; Ozone generators are to be operated in unoccupied spaces only.; Audio System Operation; To use the Cool Boss Audio System with
  • Page 26 – UE; To charge your phone using the USB port; Power; not the Audio Section
  • Page 27 – Cool Boss Accessories - Ducting Kit; an accessory for the for the; CB-16L and H models only
  • Page 28 – Maintenance; Disconnect the unit from its power source; performing any maintenance!; Monthly
  • Page 29 – To clean the Reservoir:
  • Page 30 – To test the GFCI incorporated into the Cool Boss Power Cord:; If not, check the wall outlet for power.; Do not use the Cool Boss if the GFCI fails this test.; . You may also contact Cool Boss for parts; To store the Cool Boss
  • Page 31 – Troubleshooting
  • Page 32 – Issue
  • Page 33 – Parts Diagram; Number
  • Page 34 – Mounting Bracket, Control Valve
  • Page 35 – Part; Speaker
  • Page 36 – Labels
  • Page 39 – Maintenance Log
  • Page 40 – © 2022 BendPak Inc. All rights reserved.
Loading the manual

5240 Willis Rd.

Theodore, AL 36582 USA

Toll Free: 1 (855) 223-2665

Tel: 1 (805) 933-9970

coolboss.com

Cool Boss™ Portable Evaporative Air Cooler

Installation and Operation Manual

Manual Revision A2 — May 2022 — Manual P/N 5900271

Models:

CB-16L / H

CB-28L / H

CB-36L / H

DANGER

Read the

entire

contents

of this manual

before

using this

product. Failure to follow the instructions and safety precautions in
this manual can result in serious injury or death. Make sure all other
operators also read this manual. Keep the manual near the product
for future reference.

By proceeding with setup and operation,

you agree that you fully understand the contents of this
manual and assume full responsibility for product use.

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - Installation and Operation Manual; Owner Responsibility.

Manual. Cool Boss™ Portable Evaporative Air Cooler, Installation and Operation Manual , P/N 5900271, Manual Revision A2, May 2022. Copyright. Copyright © 2022 by BendPak Inc. All rights reserved. No part of this manual can be reproduced, adapted, translated, or transmitted by any means, electronic o...

Page 3 - Table of Contents; ordered in a 110 VAC or a 220 VAC version:; DANGER

Cool Boss Evaporative Air Cooler 3 P/N 5900271 — May 2022 — Rev. A2 Table of Contents Introduction 3 Operation 23 Shipping Information 4 Maintenance 28 Safety Considerations 4 Troubleshooting 31 Frequently Asked Questions 6 Parts Diagram 33 Specifications 7 Labels 36 Components 9 Maintenance Log 39 ...

Page 4 - Shipping Information; before; Do not sign the bill of lading until; you have inspected the shipment.; after; Safety Considerations; Read this manual carefully before using your new product.; WARNING; Safety Information; not; Never

Cool Boss Evaporative Air Cooler 4 P/N 5900271 — May 2022 — Rev. A2 Keep this manual on or near the equipment so that anyone who uses or services the unit can read it. Assistance with your Cool Boss is available from your dealer, by calling Cool Boss at (805) 933- 9970 , or by emailing [email protec...

Other BENDPAK Evaporative Coolers Models