APC SMT 3000 - Manual
An Installation Manual for the SMT 2200/3000 VA UPS hardware kit covers essential safety procedures, including electrical work precautions, before detailing how to replace input/output panels on APC’s tower-style UPS units. The guide emphasizes proper disconnection of cables, secure mounting of terminal blocks and strain relief clamps, and labeling connections for hot, ground, and neutral wires. It also highlights compatibility with 100/120/230 VAC systems while omitting non-essential administrative or support-related details.
Table of Contents:
- Page 1 – Safety Procedures and Hardware Kit Contents
- Page 2 – Installation of Input/Output Panels
- Page 3 – Wiring and Securing Hardware Kit for UPS
- Page 4 – Connector Management and Customer Support
- Page 5 – Copyright and Warranty Information
Installation Guide SMT 2200/3000 VA
Input/Output Hardwire Kit
Safety
Adhere to all national and local electrical codes. A certified electrician must perform all electrical
connections.
1. Disconnect equipment connected to the UPS.
2. Press the OFF button located on the front of the UPS.
3. Disconnect the batteries in the UPS.
4. Disconnect the UPS from utility power.
NOTE: When removing the panels from the UPS, note which cable is connected to the AC input. There are two
4-pin connectors on the UPS and they are not interchangeable.
Inventory
Note:
The illustrations in this document may differ slightly from the actual hardware.
Terminal block
Terminal block label
2 screws secure the
terminal block to the UPS
4 grounding screws
8 screws
secure input, output, and
blank panels to the UPS
2 wire nuts
Input panel
Output panel
Blank panel
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Was this manual helpful?
About this manual
- Brand
- APC
- Model
- SMT 3000
- Document type
- Manual
- Language(s)
- English
- Pages
- 5
- File size
- 364.1 KB
- Format
Summary
Safety procedures for electrical work, hardware components included in the kit such as terminal blocks, screws, wire nuts, and panels.
Instructions for removing factory PDU panels, disconnecting cables, and installing replacement input/output panels with strain relief clamps on a UPS unit, including diagrams.
Instructions for installing and wiring the hardware kit for a SMT2200/3000 VA Tower model, detailing terminal block securing, labeling, and connecting input and output cables (hot, ground, neutral).