APC PDU - Manual

APC PDU

APC PDU – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
Page: / 8

Table of Contents:

  • Page 2 – Installation; How to mount the board in the PDU.; Insert the three socket-head screws into the; Note; Secure the board to the mounting brackets with a
  • Page 3 – How to route power cable wires.; ) to the closest open termination point on the Neutral Bar.
  • Page 4 – How to connect the board to the monitoring unit.; Plug one end of the monitoring cable into the port on the board.; Location of Board; Upper-left side of PDU
  • Page 5 – Configuration; Panel configuration
  • Page 6 – Global Panel Config.; Select; Apply Now; and; YES; to implement your changes.; Specifications; Branch Monitor Parameters
  • Page 8 – APC Worldwide Customer Support; APC
Loading the manual

PDU Branch Current Monitoring Board
Installation and Configuration

Inventory

Safety

Mounting the board in the PDU

The branch current monitoring board mounts to brackets in the PDU on the right and left side of each
circuit breaker panel. The illustration in step 2 on page 2 shows the mounting brackets on the upper
right-hand side of the PDU circuit breaker panel.

(1)

(1)

(3)

(3)

Note

The branch current monitoring board can be installed only in a PDU with a serial
number of

XF0314

or higher.

Electrical

Hazard

Before installing the branch current monitoring board, ensure that your system is
not receiving power (Total Power Off).

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - Installation; How to mount the board in the PDU.; Insert the three socket-head screws into the; Note; Secure the board to the mounting brackets with a

Installation and Configuration 2 Branch Current Monitoring Kit Installation How to mount the board in the PDU. 1. Insert the three socket-head screws into the board and attach the retainers to the screws. 2. Attach the board to any of the four sets of mounting brackets inside the PDU. Note The front...

Page 3 - How to route power cable wires.; ) to the closest open termination point on the Neutral Bar.

Installation and Configuration Branch Current Monitoring Kit 3 How to route power cable wires. 1. Route the phase conductor through a current sensor. If it is a three-phase cable, route each of the L1, L2, and L3 wires through its own current sensor. 2. Connect the L1, L2, and L3 wires to single-pol...

Page 4 - How to connect the board to the monitoring unit.; Plug one end of the monitoring cable into the port on the board.; Location of Board; Upper-left side of PDU

Installation and Configuration 4 Branch Current Monitoring Kit How to connect the board to the monitoring unit. 1. Plug one end of the monitoring cable into the port on the board. 2. Plug the other end of the cable into a port on the PDU monitoring unit. Note If the board is on the left side of the ...

Other APC Models

All APC Other