APC 208 - Manual

APC 208

APC 208 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
Page: / 48

Table of Contents:

  • Page 2 – About this Manual; InfraStruXure system.
  • Page 3 – Contents; IMPORTANT SAFETY INSTRUCTIONS
  • Page 5 – Safety; Symbols used in this manual; damage to product or other property.; equipment or other property.
  • Page 6 – Warnings; Installation/Maintenance; Maintenance performed while the PDU is receiving input power
  • Page 7 – Total Power Off; DC Disconnect
  • Page 8 – DANGER—Risk of Electric Shock!; • CL2 Class 2 cable for general purpose use; EMI
  • Page 9 – Site Planning; Space Considerations
  • Page 11 – Installation Procedures; Installation Procedure Overview; Service Engineer present.; See “Exchange Side Panels” on page 11 for detailed instructions.
  • Page 12 – Connect utility conductors to the PDU.
  • Page 13 – Configure the InfraStruXure Manager.; Tools Required; Standard screwdriver
  • Page 14 – firm contact with the floor.
  • Page 15 – adjacent; • Adjacent side panels of a PDU and UPS; Exchange Side Panels; Detach the ground wires from the side panels.
  • Page 16 – not; Connect Battery Enclosure communication cables
  • Page 17 – Join the PDU, UPS, and XR Battery Enclosures; the adjacent side panels.
  • Page 18 – Connect Utility Conductors to the PDU; A licensed electrician must connect input conductors to the PDU; Access the PDU Main Input switch; Loosen the two screws holding the larger, hinged door in place.; Attach conduit to the PDU for the input conductors; For wiring under a raised floor:
  • Page 19 – For overhead wiring:; Install a circuit breaker; breaker to protect the PDU against over-current.; Input Voltage
  • Page 20 – Route the input conductors to the Main Input switch; ) within the PDU to the Main Input switch.; Connect input conductors; Torque specs and tools required.; Terminal Torque
  • Page 21 – 08 V input without a transformer:; GEC
  • Page 22 – Connect AC Power and Control Wiring; may connect the AC power and control wiring.; Connect AC power wiring.; input; PDU
  • Page 23 – Connect control wiring.
  • Page 24 – Connect DC Power Wiring, if Applicable; These wires are not for use in external conduits.; Cascade XR Battery Enclosures; XR Battery Enclosure; To
  • Page 25 – adjacent side panels.
  • Page 26 – Connect an Emergency Power Off Switch; Overview; Connecting the switch.
  • Page 27 – Connect an EPO switch to the user connection plate; – Contact Closure—Normally Open
  • Page 29 – Route and Attach Power Cables to the Racks; Overhead Wiring; Route and attach power cables to equipment racks.
  • Page 30 – Automatic; Under Floor Wiring; To wire each power cable to an enclosure:
  • Page 31 – and then up through the wireway (; be installed with a 3-pole circuit breaker.
  • Page 32 – Automatic Transfer Switch
  • Page 33 – Apply power to the system; Safety warnings; Only APC Field Service Engineers or qualified, APC-trained
  • Page 34 – Install at least one battery module (four; The DC bus in the Symmetra PX UPS is energized when battery; Install at least one power module in the
  • Page 36 – Verify UPS battery operation; Top-Level Status Screen; Turn Load On; Control Menu; Confirmation Screen; Start Now
  • Page 37 – Turn Load Off; System Enable
  • Page 38 – Verify proper voltage and phase rotation at the UPS
  • Page 40 – Verify bypass operation; Control; UPS Into Bypass
  • Page 42 – UPS Out of Bypass; Yes, UPS out of Bypass; Power the PDU Distribution Breakers
  • Page 43 – distribution; connected equipment are energized.; Configure the InfraStruXure Manager; For instructions, see the InfraStruXure Manager
  • Page 45 – Specifications; 0 kW InfraStruXure PDU; Input
  • Page 46 – Panel Boards
  • Page 47 – Environmental
  • Page 48 – APC Worldwide Customer Support
Loading the manual

Installation and Start-Up

InfraStruXure

®

For Medium Data Centers

40 kW 208/480/600 V

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - About this Manual; InfraStruXure system.

InfraStruXure System - Installation and Start-Up About this Manual This manual covers basic installation and start-up procedures for certified electricians, American Power Conversion (APC ® ) Field Service Engineers, or APC-trained installers of a 40 kW InfraStruXure ® system. For information about ...

Page 3 - Contents; IMPORTANT SAFETY INSTRUCTIONS

Contents InfraStruXure System - Installation and Start-Up i Safety ................................................................................ 1 IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 Symbols used in this manual . . ....

Page 5 - Safety; Symbols used in this manual; damage to product or other property.; equipment or other property.

InfraStruXure System - Installation and Start-Up 1 Safety IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS This manual contains important instructions that must be followed during installation, operation, and maintenance of the InfraStruXure System. Symbols used in this manual Electrical Haza...