American Standard 7222.712 - Manual

American Standard 7222.712

American Standard 7222.712 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
Page: / 3
Loading the manual

Installation

Instructions

U S 6 0 4 0 6 R E V. 1. 2

Certified to comply with ANSI A112.18.1M

FINISHED

WALL

1-1/4 DIA HOLE

4

TOP OF

TUB RIM

OPTIONAL TO FINISHED

FLOOR USUALLY

BETWEEN 65'' AND 78''

1/2" N.P.T.

SHOWER ARM

BOTTOM OF TUB

ROUGHING-IN DIMENSIONS

5 REF.

7 REF.

18 OPTIONAL

NOTE: NO CONCEALED PIPING FURNISHED

2" MIN.

3-1/4" MAX.

74 FOR HEAD CLEARANCE

U.S. Patent No. 5,819,789

(2) 1-13/16" DIA. HOLES

FOR VALVES ON 8"

CENTERS (1) 1-13/16"

DIA. HOLE FOR CENTER

TRANSFER VALVE

CROSS

BRACE

1-3/4

TYP.

1-3/4

UNION INLET

1/2"-14 N.P.T.

1/2" N.P.T. TO

SHOWER

Turn off hot and cold water

supplies before beginning.

CAUTION

1

ROUGHING-IN

SHOWER AND SPOUT

2

3

4

1

5

UNION

SWIVEL

"HOT"

"COLD"

7

COUPLING

NUT

IMPORTANT: DO NOT REMOVE PLASTER GUARDS (2) UNTIL STEP 2.

(SHR)

6

Recommended Tools

*Hex key Supplied with Fitting

Flat Blade Screwdriver

Adjustable Wrench

Channel Locks

Plumbers' Putty or Caulking

Phillips Screwdriver

T W O H A N D L E B AT H / S H O W E R S E T

5-1/8"

REF.

1" MIN.

4"

1/2" COPPER

8

10

9

7 2 2 0 . 7 0 2

7 2 2 0 . 7 1 2

7 2 2 0 . 7 2 2

7 2 2 0 . 7 3 2

7 2 2 1 . 7 0 2

7 2 2 1 . 7 1 2

CROSS

BRACE

"COLD"

"MAX WALL"

PLASTER

GUARD

MAXW

AL

L

M

IN

1-5

/8"D

EEP

MAXW

AL

L

M

IN

1-5

/8"D

EEP

Prepare water supplies per Roughing-in Dimensions. Apply sealing tape

to all threaded connections.
Install VALVE

(1)

at indicated height and depth. Make sure the outlet marked

"SHR" is pointing upward. Mount VALVE

(1)

to cross brace with wood screws.

Slip COUPLING NUT over supply pipe and thread UNION SWIVEL to pipe.

Connect HOT

(6)

water supply to LEFT valve inlet and COLD

(7)

water supply

to RIGHT valve inlet.
Prepare SHOWER RISER

(4)

and ELBOW

(3)

. Connect to TOP outlet, marked

"SHR" of VALVE BODY

(1)

.

Prepare TUB FILLER PIPE (8), ELBOW

(10)

and roughing-in COPPER PIPE

(9)

.

Connect to BOTTOM outlet of VALVE BODY

(1)

.

Add cross braces to wall structure and secure piping.
Cap NIPPLES

(5)

and COPPER PIPE

(9)

. Open supply lines and check for leaks.

Remove PLASTER GUARDS

(2)

. Use spline on end of PLASTER GUARD

(2)

to

open both VALVES and check for leaks.
Close both valves and turn off water supplies. Replace PLASTER GUARDS

(2)

.

Finish wall construction.

Thank you for selecting American-Standard...the benchmark

of fine quality for over 100 years.

To ensure that your installation proceeds smoothly--

please read these instructions carefully before you begin.

7 2 2 1 . 7 2 2

7 2 2 1 . 7 3 2

7 2 2 2 . 7 0 2

7 2 2 2 . 7 1 2

7 2 2 2 . 7 2 2

7 2 2 2 . 7 3 2

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Other American Standard Models

All American Standard Other