American Standard 6021 - Manual
American Standard 6021 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – COLDER; INSTALL TRIM; SPOUT FLANGE
- Page 3 – TO GAIN ACCESS TO VALVE FOR SERVICING; Turn on water supply and see above for installing TRIM and HANDLE.; VALVE LEAKS WHEN SHUT OFF; BACK TO BACK INSTALLATION; UNABLE TO MAINTAIN CONSTANT TEMPERATURE; INLETS
- Page 4 – MODEL NUMBER; A R I A N A; P R E S S U R E B A L A N C I N G; CHROME
I N W A L L P R E S S U R E B A L A N C I N G
B A T H A N D S H O W E R S E T S
M 9 6 8 4 5 7
B
To assure proper positioning in relation to wall,
note roughing-in dimensions.
Thank you for selecting American-Standard...the benchmark of fine
quality for over 100 years.
To ensure that your installation proceeds smoothly--please read these
instructions carefully before you begin.
ROUGHING-IN DIMENSIONS
Certified to comply with ANSI A112.18.1
I n s t a l l a t i o n
I n s t r u c t i o n s
A R I A N A
6021
6022
THREADED INLETS (STOPS)
INLETS
1/2" NPT
5-7/8"
INLETS 1/2" NPT
OUTLETS
1/2" NPT
OUTLETS
1/2" NPT
3-3/8"
3-3/8"
3-3/8"
THREADED INLETS
Required Tools
Flat Blade Screwdriver
Adjustable Wrench
Channel Locks
Plumbers' Putty or Caulking
Phillips Screwdriver
1
ROUGHING-IN
Turn off water at main supply.
CAUTION
When soldering, remove PLASTER GUARD, CARTRIDGES and CHECK STOPS (IF PRESENT). When finished soldering,
flush valve body, replace cartridges, check stops (if present) and plaster guard to continue installation. Use thread
sealant or Teflon tape on threaded connections.
NOTE
If the valve is installed on a fiberglass
or other thin wall application, the
PLASTER GUARD (4) can be used as a support.
Connect hot and cold water supplies.
Cap off shower pipe (5) and tub filler pipe (6).
For support, use pipe BRACES (7) secured to wooden braces.
With valve turned off, turn on water supplies. Check for leaks.
COLD
HOT
Cut a 3" dia. hole in the shower stall.
Drill two additional 1" holes to allow access
to the stops.
Remove PLASTER GUARD (4), rotate 90˚
so that indicated screw holes fit MANIFOLD (2).
Push CAP on valve, place ESCUTCHEON on and
attach with screws.
1
7
5
3
6
4
2
See Roughing-in diagram before starting.
Connections are:
1/2" female NPT for threaded inlets
Connect RISER PIPE (1) to MANIFOLD (2)
top outlet marked "SHR".
Connect TUB FILLER PIPE (3) at bottom
outlet marked "TUB".
For proper positioning the finished wall
must be within side wall of PLASTER
GUARD (4).
FINISHED WALL
4"
BOTTOM OF TUB
74" FOR HEAD
CLEARANCE
5-1/8" REF.
7-7/8" REF.
18" OPTIONAL
5" REF.
1/2" NPT
1-5/8"
to
3-1/4"
1/2" NPT
7-1/8"
4
-
1
/4"
REF
.
OPTIONAL TO FINISHED
FLOOR USUALLY
BETWEEN 65'' AND 80''
T O P O F T U B R I M
O
f f
H
o t
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
3 INSTALL HANDLE ADJUST HOT LIMIT STOP By restricting HANDLE rotation and limiting the amount of hotwater allowed to mix with the cold, the HOT LIMIT SAFETYSTOP (1) reduces risk of accidental scalding. To set the maximumhot water temperature of your faucet, all you need to dois adjust the setting on...
5 Pull INDEX CAP, unscrew HANDLE SCREW and pull HANDLE off valve stem. Remove two SCREWS holding ESCUTCHEON and remove ESCUTCHEON. Remove COVER by pulling straight out. Shut off water supply by either closing off main water supply, or closing off the hot and cold CHECK STOPS on valve. TO GAIN ACCESS...
M953567-YYY0A SHOWER HEAD A954440-0070A CARTRIDGE 023603-0070A CARTRIDGE SCREWS A923611-0070A HOT LIMIT STOP M961854-0070A FIXATION RING WITH SCREWS M952100-0070A PRESSURE BALANCING UNIT M962286-YYY0A SHOWER ARM AND ESCUTCHEONWITH SEALS M907051-YYY0A CARTRIDGE CAP 078016-YYY0A ESCUTCHEON SCREWS M962...