American Standard 2742.020 - Manual

American Standard 2742.020

American Standard 2742.020 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
Page: / 8

Table of Contents:

  • Page 2 – brackets must have the opening pointing in the same direction.
  • Page 3 – the opening pointing in the same direction.
  • Page 4 – DRAIN CONNECTION ASSEMBLY AND LEAK TEST
  • Page 6 – AMERICAN STANDARD LIMITED WARRANTY ACRYLIC PRODUCTS; This limited warranty DOES NOT COVER the following:
  • Page 7 – DESCRIPTION; RECOMMENDED TOOLS AND MATERIALS; Assembly; INSTALLATION PROCEDURES
  • Page 8 – CARE AND CLEANING
Loading the manual

Installation Instructions

Enfield Bathtub
2742.020, 2742.222

752846-100 Rev. C

1

DuraBond™

Construction

HIGH GLOSS ACRYLIC

FITTINGS NOT INCLUDED

THANK YOU...

for selecting American Standard . . . the benchmark of fine quality for over 100 years. To ensure that

your installation proceeds smoothly--please read these instructions carefully before you begin. All you need to finish the
installation are your selected fittings. (Certain installations may require professional help.) Also be sure your installation
conforms to local codes.

GENERAL INSTALLATION INFORMATION

Carefully uncrate and inspect your new bath and tub frame for any
shipping damage. If such damage is found, report it to your vendor
immediately.

Protect all finished surfaces of the bath frame during construction
and installation using a drop cloth. If packaging foam is removed for
inspection purposes, save for frame installation procedure.

Fittings (bath filler, drain, and water supplies) are not provided with
the bath and must be ordered separately.

List of Required Components (not included):

• 1593.170.295 Drain*

• 9116.017.295 Bath Filler*

• 9117.012.295 Water Supplies w/deck risers*

* Available at your American Standard Distributor

List of Required Tools and Supplies:

Tools:
• Drill
• Drill bits for wood or tile
• Level
• Tape Measure
• Pipe Wrench
• Crescent Wrench
• Slip Joint Pliers
• Screw Driver
• Standard Woodworking Tools
• Personal Safety Equipment
• Caulking Gun
• Torque Wrench with 1/2" Socket
• #2 Square Drive

Supplies
• Putty
• Painter's Tape

INSTALLER: PLEASE LEAVE THESE INSTRUCTIONS
WITH HOMEOWNER AS THEY PROVIDE IMPORTANT
CLEANING INFORMATION.

FOR AFTER-SALES SERVICE CALL 1 (800) 442-1902

WEEKDAYS.

© American Standard Inc. 2004
All product names listed herein are trademarks
of American Standard Inc. unless otherwise noted.

43-3/4

(1111mm)

2 6 - 3 / 4

( 6 7 9 m m )

4-1/2

(114mm)

4-1/4

(108mm)

2

(51mm)

6
(152mm)

3
(76mm)

8

(203mm)

14

(356mm)

25

(635mm)

C/L OF DRAIN

C/L OF 1/2 NPTS

SUPPLIES

OUTLINE OF

SKID RESISTANT

SURFACE

7
(178mm)

3-1/2
(89mm)

73-3/4

(1873mm)

SUGGESTED LOCATION
FOR BATH FILLER
(MOUNTING HOLES
BY OTHERS)

36-3/4

(933mm)

14-1/4

(362mm)

5-3/4

(146mm)

FINISHED

FLOOR

VIEW

BATH RIM

C/L OF
OVERFLOW

CAST METAL DESIGN INSERTS

PANELED INSERTS

H

C

1/2 N.P.T.S. INLETS

1-3/8 O.D.
TAILPIECE

70 (1778mm)

SUPPORT LEGS

40-3/8 (1026mm)

SUPPORT LEGS

3-1/4

(83mm)

7 3 - 3 / 4 x 4 3 - 3 / 4 x 2 5 I n .

( 1 8 7 3 x 1 1 1 1 x 6 3 5 m m )

1 1 4 L b s . ( 6 6 K g . )

7 4 8 L b s . ( 3 4 0 K g . )

7 6 G a l . ( 2 8 8 L . )

4 1 x 2 1 - 1 / 2 I n . ( 1 0 4 1 x 5 4 6 m m )
6 2 x 3 1 - 3 / 8 I n . ( 1 5 7 5 x 7 9 7 m m )

1 5 - 3 / 4 I n . ( 4 0 0 m m )

3 6 L b s . / S q . F t . ( 1 7 4 K g s / S q . m . )

2 7 . 8
5 5 . 7

GENERAL SPECIFICATIONS FOR 2742 BATHING POOL

I N S T A L L E D S I Z E

W E I G H T
W E I G H T w / W A T E R
G A L . T O O V E R F L O W .
B A T H I N G W E L L A T S U M P
B A T H I N G W E L L A T R I M
W A T E R D E P T H T O O V E R F L O W
F L O O R L O A D I N G
( P R O J E C T E D A R E A )
P T S .
C U B E ( F T

3

)

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - brackets must have the opening pointing in the same direction.

1. Identify desired location of the tub. Please note: the floor area supporting the tub and frame must be capable of supporting a load in excess of 2000 lbs. The supplies and drain mustnot interfere with the floor joists (see rough-in for dimensions). 2. Place the wood frame, finished side down, on ...

Page 3 - the opening pointing in the same direction.

17. Attach the anti-tip bracket to the floor using the 1/4” - 20 socket head bolts and hex key wrench (see photo #5). 18. Repeat for the remaining brackets. Note - all brackets must have the opening pointing in the same direction. 19. Slide the frame into position. The leveler should touch the insid...

Page 4 - DRAIN CONNECTION ASSEMBLY AND LEAK TEST

34. Attach a screw in the bottom hole threading the screw into the slot. 35. Repeat steps 32 thru 34 on the inside of the leg. 36. Repeat for remaining legs. 37. Install the faucet and drain per manufacture’s instructions. 38. Place the wood inserts or cast grilles into the opening in the center of ...

Other American Standard Models

All American Standard Other