Zenith 216666666 - Manual
Zenith 216666666 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – Read These Warnings First; Tapware; Quick Installation Guide; enith
- Page 3 – Installation Requirements; Before installing, ensure that the following are available:; Installation Procedure
- Page 4 – Step Two - Positioning; All Z; Step Five - Commissioning; During the heating cycle, drips fall from the delivery spout or tap.
- Page 5 – Problem Solving; Fault
- Page 6 – enithenith; Operating Procedures; Water Temperature; Economy Setting; Cleaning; Spare Parts
- Page 7 – Tap Temperature Adjustment; Mixer Cartridge “Y”
- Page 8 – Tudor; Head Office; Warranty Information
Z
enith
Tudor
Single point open outlet (vented) water heaters
p Tud over-sink water heater
21
6666666
Zip Tudor 5 Litre under-sink water heater
21
6666666666
utor 10 Litre under-sink water heate
99032
Telescopic Spout accessory for 21000 / 21020
9903
9999999
4 Mono vented mixer tap fo
66
r 21010 / 21030
9
1
9
111
0
88
lo vented mixer tap for 21010 / 21030
99050
Hero vented mixer tap for 21010 / 21030
ä
Installation & Operating Instructions
21
6
00
Z
enith
Tudor 5 Litre over-sink water heater
21
6
20
Z
enith
Tudor 10 Litre over-sink water heater
21
6
10
Z
enith
Tudor 5 Litre under-sink water heater
21
6
30
Z
enith
Tu
d
or 10 Litre under-sink water heater
99032
Telescopic Spout accessory for 21
6
00 / 21
6
20
99
0
7
9 M
ono vented mixer tap for 21
6
10 / 21
6
30
990
80 S
olo vented mixer tap for 21
6
10 / 21
6
30
990
81 H
ero vented mixer tap for 21
6
10 / 21
6
30
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
Page 2 Z enith ip Tudor - Installation & Operating Instructions - 81333 - May 2003 # Read These Warnings First Tapware # Quick Installation Guide Please read all installation requirements, installation procedures andprecautions before installing any Z enith Tudor water heater. Never attempt to i...
Before installing, ensure that the following are available: Installation Requirements Before installing, ensure that the following are available: a) sufficient space to position the heater so there is 270 mm clear accessunder the heater (over-sink models) or 270mm above (under-sink). b) standard 10 ...
Page 4 Z enith ip Tudor - Installation & Operating Instructions - 81333 - May 2003 Installation Procedure continued Step Two - Positioning Over-sink heaters should be installed so that the outlet spout drains to a sinkor basin, and with a clearance of 270 mm beneath the heater to allow forservic...