Weil-McLain 550-141-827/1201 - Manual

Weil-McLain 550-141-827/1201

Weil-McLain 550-141-827/1201 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
Page: / 28

Table of Contents:

  • Page 2 – Read This Page First
  • Page 3 – Table of Contents
  • Page 4 – Before Installing Boiler
  • Page 5 – Provide air for combustion and ventilation:
  • Page 6 – Fiberglass wool and ceramic fiber materials:; Install Non-Packaged Boiler
  • Page 7 – Perform hydrostatic pressure test:
  • Page 8 – Install boiler controls:
  • Page 9 – Install burner (also refer to instructions packed with burner):
  • Page 10 – General chimney requirements:; Connect Breeching
  • Page 12 – General piping information:; Connect Water Piping
  • Page 14 – Piping MULTIPLE ZONES:
  • Page 16 – Use with refrigeration systems:; Connect Tankless Heater Piping
  • Page 17 – To pipe tankless heater:
  • Page 18 – General wiring requirements:; Connect Wiring
  • Page 20 – General oil piping requirements:; Oil piping connection at burner:; Connect Oil Piping
  • Page 22 – Installation and Service Certificate; Check off steps as completed:
  • Page 23 – Burner adjustments for “A” boilers:; Appendix
  • Page 24 – Parts List
  • Page 25 – Parts Drawing
  • Page 26 – Dimensions
  • Page 28 – Ratings
Loading the manual

SGO-W

SERIES 3 OIL-FIRED NATURAL DRAFT WATER BOILER

Installer: • Make sure this is the correct manual for the boiler. Verify boiler model on

rating label.

• Leave all documentation received with boiler and burner with unit for

future reference.

User: Boiler and burner must be installed and serviced by qualified service technician.

Part No. 550-141-827/1201

This Manual

Includes:

Installation

Start-Up

Boiler Parts

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - Read This Page First

Hazard Definitions The following terms are used to bring attention to the presence of hazards of various risk levels or toimportant information concerning product life. Indicates presence of hazards that will cause severe personal injury, death or substantialproperty damage if ignored. Indicates pre...

Page 3 - Table of Contents

Read all instructions before installing. Failure to follow all instructions in proper ordercan cause severe personal injury, death or substantial property damage. Read This Page First . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2Table of Contents . . . . . . . . . . . . . . . . . . . ...

Page 4 - Before Installing Boiler

Installations must comply with: • U.S.— State and local plumbing, heating and electrical codes. — National codes where applicable. • Canada— Canadian Standards Association, CSA B139, Installation Code for Oil-Burning Equipment. — CSA C22.1 Canadian Electrical Code Part One.— Applicable local or prov...

Other Weil-McLain Models

All Weil-McLain Other