Thermo Pride MO-425 - Manual

Thermo Pride MO-425

Thermo Pride MO-425 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
Page: / 20

Table of Contents:

  • Page 3 – I. GENERAL INSTRUCTIONS - READ BEFORE START OF INSTALLATION; This furnace is not to be used as a construction heater; COMBUSTIBLE MATERIAL:
  • Page 4 – inside area of the chimney liner; This formula calculates the; minimum
  • Page 8 – REDUCTION OF CLEARANCES WITH SPECIFIED FORMS OF PROTECTION
  • Page 9 – The vent; The vent connector pipe should be as short; DUCT SIZES FOR HOMES, QUIET OFFICES OR SIMILAR INSTALLATIONS
  • Page 10 – RETURN AIR DUCT SYSTEM; should equal the warm air duct system in airflow capabilities.; SIZING THE DUCT WORK FOR A COMBINATION HEATING AND COOLING SYSTEM:
  • Page 11 – Do not; use compression fittings.
  • Page 13 – CO; or oxygen; DO NOT RUN THE PUMP DRY FOR MORE THAN FIVE MINUTES, AS; OR O 2
  • Page 14 – Minimum temperature rise is 55° maximum temperature rise is 85°.; III. DEALER MAINTENANCE
  • Page 18 – EFFECTS OF PRESSURE ON NOZZLE FLOW RATE
  • Page 19 – must; be cleaned or replaced to ensure proper venting.
  • Page 20 – CAUTION: Do not attempt to start burner when:; Excess oil has accumulated
Loading the manual

MO-425

ECN 4392-MA

OIL FURNACE

GENERAL SERVICE AND MAINTENANCE MANUAL


FOR USE WITH THERMO PRIDE OIL FURNACES
























THERMO PRODUCTS, LLC.

PO

BOX

217

NORTH

JUDSON,

IN

46366

PHONE:

(574)

896-2133

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 3 - I. GENERAL INSTRUCTIONS - READ BEFORE START OF INSTALLATION; This furnace is not to be used as a construction heater; COMBUSTIBLE MATERIAL:

All installations and services must be performed by qualified service personnel. 1 I. GENERAL INSTRUCTIONS - READ BEFORE START OF INSTALLATION 1. The heating output capacity of the furnace proposed for installation should be based on a heat loss calculation made according to the manuals provided by ...

Page 4 - inside area of the chimney liner; This formula calculates the; minimum

All installations and services must be performed by qualified service personnel. 2 If the "entire" building is unusually tightly constructed and/or has an exhaust fan installed, a low pressure zone could be created within the structure. Air for combustion and draft control operation must be ...

Page 8 - REDUCTION OF CLEARANCES WITH SPECIFIED FORMS OF PROTECTION

All installations and services must be performed by qualified service personnel. 6 Fig. 7: Alternate constructions that allow reduced clearances to combustible materials. REDUCTION OF CLEARANCES WITH SPECIFIED FORMS OF PROTECTION Type of protection applied to and covering all surfaces of combustible...

Other Thermo Pride Models

All Thermo Pride Other