Page 3 - Table of Contents; We look forward to hearing from you!; Safety Definitions; WARNING
Table of Contents English 2 Table of Contents This THERMADOR ® appliance is made by BSH Home Appliances Corporation 1901 Main Street, Suite 600 Irvine, CA 92614 Questions? 1-800-735-4328 www.thermador.com We look forward to hearing from you! Safety Instructions .........................................
Page 4 - Safety; IMPORTANT SAFETY INSTRUCTIONS; READ AND SAVE THESE INSTRUCTIONS; Before You Begin
Installation Instructions English 3 Safety IMPORTANT SAFETY INSTRUCTIONS READ AND SAVE THESE INSTRUCTIONS Before You Begin IMPORTANT : Save these instructions for the Local Gas Inspector’s use. INSTALLER : Please leave these Installation Instructions with this unit for the owner. OWNER : Please reta...
Page 5 - Gas Type Verification
Installation Instructions English 4 IMPORTANT SAFETY INSTRUCTIONS READ AND SAVE THESE INSTRUCTIONS Gas Type Verification Verify that the appliance is correct for the type of gas provided at installation location. Ensure that the appliance is connected to the type of gas for which it is certified. Be...
Page 6 - Installation; Planning Information; IMPORTANT; Ventilation Preparation; Select Hood and Blower Models; TOOLS NEEDED
Installation Instructions English 5 Installation Planning Information Before using your appliance, be sure to read this manual. Pay special attention to the Important Safety Instructions located at the beginning of the manual. STEP 1: Ventilation Requirements Refer to the Ventilation Planning Guide ...
Page 7 - STEP 2: Cabinet Preparation
Installation Instructions English 6 STEP 2: Cabinet Preparation • The range is a free standing unit. If the unit is to be placed adjacent to cabinets, the clearances shown in “Installation Clearances” on page 7 are required. The same clearances apply to island installations, except for the overhead ...
Page 8 - Installation Clearances; Installation Clearances with Low Backguard
Installation Instructions English 7 Installation Clearances Installation Clearances with Low Backguard Figure 1: Cabinet Clearances with Low Backguard 5 " (127 mm) min. to combustible sidewalls 5" (12 7 m m) m in. to combustible sidew alls 5" (127 mm) min. to combustible sidewalls 18 ...
Page 10 - Installation Clearances with Flush Island Trim
Installation Instructions English 9 Installation Clearances with Flush Island Trim Figure 3: Cabinet Clearances with Flush Island Trim 5 " (127 mm) min. to combustible sidewalls 5" (127 mm) min. to combusti ble sidewa lls 5" (127 mm) min. to combustible sidewalls 18 " (457 mm) minimu...
Page 12 - Gas and Electric Supply Clearances; Electrical Supply; Model; Power Cord & Receptacle
Installation Instructions English 11 Gas and Electric Supply Clearances NOTICE: — If not already present, install gas shut-off valve in an easily accessible location. — Make sure all users know where and how to shut off the gas supply to the range. — Any opening in the wall behind the appliance and ...
Page 13 - Unpacking the Range; Moving the Range
Installation Instructions English 12 When using a receptacle it may be necessary to recess the receptacle's housing into the rear wall. Refer to Local Electrical Code to determine the minimum volume for all electrical / junction boxes. Follow all local electrical codes. Mount the receptacle securely...
Page 14 - DO NOT; STEP 4: Door Removal and; To Remove the Oven Door
Installation Instructions English 13 2. To remove the pallet bolts use (2) ½'' (13 mm) wrenches, one to hold bolt at the bottom while the other is loosening the nut at the top. Discard the wood packing block inserts. 3. PRDS48JDSGU/C models: To access the pallet bolt located beneath the warming draw...
Page 15 - Adjustment for the Warming Drawer Front
Installation Instructions English 14 To Reinstall the Oven Door To Check Door Fit and Adjustment 1. Open and close the door slowly to test the movement and the fit of the door to the oven cavity. Do not force the door to open or close. If the door is properly installed, it should move smoothly and r...
Page 17 - Natural Gas Appliances; Hook Up; NATURAL GAS REQUIREMENTS
Installation Instructions English 16 2. Secure bracket into the wall stud using (2) mounting screws or drywall anchors, as appropriate ( Figure 15 ). 3. Secure the bracket to the floor using the screws provided ( Figure 15 ). 4. Later, when the unit is installed, the adjustable legs will allow the c...
Page 20 - INSTALLER; -Wire Lead Connection
Installation Instructions English 19 4-Wire Connection A unit must be connected to the power supply with a 3- POLE, 4-CONDUCTOR cord kit rated 125/250 VOLTS, 50 AMPERES, and marked for use with ranges. The cord kit must be attached to the range terminal block with a strain relief (not provided) whic...
Page 22 - Keep Hot Shelf; NN; Varies
Installation Instructions English 21 4. Remove protective plastic. Installing a Backsplash with a Keep Hot Shelf A hood can be installed first if the Backsplash is to be installed with a Keep Hot Shelf given that the Keep Hot Shelf covers the top mounting screws of the Backsplash. To protect against...
Page 23 - Low Backguard Installation
Installation Instructions English 22 1. Tape the templates included with the Keep Hot Shelf to the wall accordingly: • Tape the sheet titled Left Hand Template to bottom and left end of hood. Align the bottom line of hood with the top line of the template. • Tape the sheet titled Right Hand Template...
Page 24 - Backguard Installation
Installation Instructions English 23 NOTE: If a Backsplash is to be used in addition to a backguard, install the Backsplash first and the backguard second before sliding range into place. Backguard Installation 1. Depending on model, remove the (3) or (5) T-20 Torx stainless screws in the front face...
Page 25 - Leveling Leg Adjustment; Griddle Tilt Adjustment (not all models)
Installation Instructions English 24 STEP 9: Placing and Leveling the Range Leveling Leg Adjustment For proper performance, the range must be level. This is especially important for all products that have the griddle feature. Priority should be placed on ensuring that the oven cavities are also leve...
Page 26 - Installing the Leg Covers; TOE KICK PARTS
Installation Instructions English 25 Installing the Leg Covers 1. Remove plastic coverings from the stainless steel covers. 2. Place the smaller cover, with cutouts facing up, inside the larger cover with the openings of both stacked and facing the back. 3. Beneath the range, wrap the cover assembly...
Page 27 - Test Burner Ignition
Installation Instructions English 26 5. Mount the Toe Kick Panel on both sides of the unit into the extruded dimples using the (4) T-20 Torx drill point screws provided. Data Rating Label The data rating label shows the model and serial number of the range. It is located in the gap created by the ri...
Page 28 - When Flame is Properly Adjusted:
Installation Instructions English 27 Repeat these Ignition and Flame Test procedures for each rangetop burner. When Flame is Properly Adjusted: There should be a flame at each burner port. There should be no air gap between the flame and burner port. Call THERMADOR ® if: 1. Any of the burners do not...
Page 29 - Installer Final Check List; Gas Supply; Troubleshooting
Installation Instructions English 28 Installer Final Check List Gas Supply Electrical Operation Clean and Protect Exterior Surfaces • The stainless steel surfaces may be cleaned by wiping with a damp soapy cloth, rinsing with clear water and drying with a soft cloth to avoid water marks. Always wipe...
Page 30 - THERMADOR; Service; Entretien; Pièces et Accessoires; Piezas y Accesorios
THERMADOR ® Service | Entretien | Mantenimiento 1901 Main Street, Suite 600, Irvine, CA 92614 • 800-735-4328 • www.thermador.com 9001078740 • Rev. A • 5U06U8 • © BSH Home Appliances Corporation, 05/15 Service We realize that you have made a considerable investment in your kitchen. We are dedicated t...