tekmar 274 - Installation Manual

tekmar 274

tekmar 274 Boiler – Installation Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
Page: / 44

Table of Contents:

  • Page 2 – How to Use the Data Brochure; Menu; Table of Contents
  • Page 3 – Item Field; Menu Item; Display
  • Page 4 – Demand; OR; from EMS; Characterized Heating Curve; Boiler Characterized Heating Curve; Access Level
  • Page 5 – Room Setting in Adjust Menu
  • Page 6 – Boiler Operation
  • Page 7 – LO
  • Page 8 – Relay Setting in Adjust Menu; Alert; Boiler Run Time in View Menu; Manual Differential; Automatic Differential; djust Menu; Combustion Air and Alert Settings
  • Page 9 – an externally powered DHW demand when using a DHW; Domestic Hot Water Operation
  • Page 10 – DHW Differential Setting in Adjust Menu; Boiler Target Temperature during a DHW; Mode OFF / No DHW Generation
  • Page 11 – even if there are less than 4 boilers.; Mode 6 – Dedicated DHW
  • Page 12 – Automatic Priority Override
  • Page 13 – Setpoint Demand; Powered Setpoint Demand; Boiler Target Temperature during a Setpoint; Mode OFF - No Setpoint Operation; Mode 2 - Setpoint in Parallel with Priority; Setpoint Operation
  • Page 14 – Mode 3 - Setpoint in Primary/Secondary with No Priority; Mode 4 - Setpoint in Primary/Secondary with Priority; Setpoint Priority Override Setting in; Conditional DHW Priority; target temperature
  • Page 15 – Input Signal; Offset Setting in Adjust Menu; Example; Section G
  • Page 16 – Normal Operation; Pump Operation
  • Page 17 – The Setback / Off DIP Switch must be set to Setback; Exercising
  • Page 18 – Schedule Types; Setting the Schedule
  • Page 19 – Network; tN4 Thermostat; tekmarNet
  • Page 20 – General; Powered Input Connections; CAUTION; Step One — Getting Ready; Installation; Step Two — Mounting the Base
  • Page 21 – Non-Powered Input Connections; The connection is polarity sensitive. Ensure that
  • Page 22 – Powered Output Connections; Primary Pump P1; Non-Powered Output Connections
  • Page 23 – connect them together.; Testing the EMS Output; Step Five — Testing the Wiring
  • Page 24 – If the relay is set to boiler ignition:; Testing DHW and Primary Pumps; If DHW Mode is enabled:
  • Page 25 – Testing the Demands; Cleaning the Control; Control Settings; DIP Switch Settings
  • Page 27 – SECTION C; VIEW MENU; Display Menus
  • Page 28 – SECTION H
  • Page 29 – Actual; ADJUST MENU
  • Page 30 – SECTION B
  • Page 32 – (parallel with last
  • Page 35 – TIME MENU
  • Page 36 – SECTION J; SECTION J; SECTION K; SECTION K; SECTION K; SCHEDULE MENU
  • Page 39 – SECTION M; MISC MENU
  • Page 40 – HAZARD; Max Heat; Test; Zone Test; Step 1; Testing the Control
  • Page 42 – More than one tN4 device has been assigned the same master number.
  • Page 44 – Technical Data
Loading the manual
Page 1

Input

Universal

Sensor

Included

Input

Universal

Sensor

Included

tN4

Boiler

Bus

Input

Outdoor Sensor

Included

OR

0-10 or 2-10 V (dc)

from EMS

Output

Up to 4

On/Off Boilers

Input

115 V (ac)

Power Supply

Input

Flow OR
C.A. Proof

Output

Up to 2

Boiler Pumps

Output

DHW Pump

OR

Primary Pump

Output

Combustion

Air Damper

OR Alert

OR

OR

Output

Primary

Pump

Input

DHW OR

Setpoint

Demand

Signal

Input

Boiler

Demand

Signal

Primary

DHW

1

1 3

2 4

VIEW

Demands

Setback

Boiler Control 274

One tN4, Four Stage Boiler & DHW / Setpoint

Menu

Item

Test

Boiler Demand
DHW / Setpoint Demand
Proof Demand

EMS Input Signal

Priority Override

Power

115 V ±10% 60 Hz 7 VA, 1150 VA max.

Relays

230 V (ac) 5 A 1/3 hp

Demands 20 to 260 V (ac) 2 VA

Made in Canada by

tekmar Control Systems Ltd

tektra 1020-02

Meets Class B:

Canadian ICES

FCC Part 15

For maximum heat,

press and hold

Test

button for 3 seconds.

not testing

testing

testing paused

off

red

red

Off

EMS

Rotate

Fixed Last

Pump Sequencer

Exercise

Off

Date Code

H2050

A

Signal wiring must be rated at least 300 V.

DHW

23

/Setp

Com

24

Dem

Pr.

25

Dem

2

5

1

3

–

+

4

6

BRet/

Com

tN4

Boil

Out

Com

Prim

P1

L

N

20

Power

22

21

8

7

Do not apply power

18

DHW

/ P2

17

19

10

9

12

11

14

13

16

15

Fixed Lead

First On / Last Off

First On / First Off

Relay

1

Relay

2

Relay

3

Relay

4

C.A. /

Alert

Boiler

Demand

Sup

DHW

Zone Load Shedding

1

Up to 4 On/Off Boilers

2

Up to 2 On/Off Boilers & 2 Pumps

3

Up to 2 Lo/Hi Boilers

4

1 Lo/Hi Boiler & 1 Pump

5

1 Three Stage Boiler & Pump

6

1 Four Stage Boiler

Modes

The Boiler Control 274 operates up to four on/off boilers to provide outdoor reset operation, domestic hot water and setpoint operation

with priority. When operating as a tN4 System Control, the 274 can connect with up to 24 tN4 devices on a single boiler bus. The 274

has primary pump sequencing capabilities along with a flow proof or combustion air damper proof demand.

• tN4 Compatible
• 24 Hour, 5-1-1, 7 Day Schedule
• Flow or Combustion Air Proof
• Four On/Off Boilers
• Equal Run Time Rotation

• Primary Pump Sequencing
• DHW Operation
• Optional DHW Sensor
• Setpoint Operation

Additional functions include

Installation, Operation and Maintenance Manual

Boiler Control 274

IOM-T-274

WARNING

!

Please read carefully before proceeding with

installation. Your failure to follow any attached

instructions or operating parameters may lead to the

product’s failure.
Keep this Manual for future reference.

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Was this manual helpful?

About this manual

Brand
tekmar
Model
274
Document type
Installation Manual
Category
Boiler
Language(s)
English
Pages
44
Format
PDF

Summary

Page 2 - How to Use the Data Brochure; Menu; Table of Contents

2 IOM-T-274 2123 © 2021 Watts How to Use the Data Brochure This brochure is organized into three main sections.They are: 1) Sequence of Operation, 2) Installation, 3) Control Settings and 4) Testing and Troubleshooting. The Control Settings section of this brochure describes the various items that a...

Page 3 - Item Field; Menu Item; Display

3 IOM-T-274 2123 © 2021 Watts PRIMARY PUMP Displays when primary pump 1 or primary pump 2 is in operation BOILER Displays which boiler stage is operating LOCK Displays when adjusting Access level if Switch is set to lock. WARNING Displays when an error exists. COMMUNICATION BUS Displays when tN4 the...

Page 4 - Demand; OR; from EMS; Characterized Heating Curve; Boiler Characterized Heating Curve; Access Level

4 IOM-T-274 2123 © 2021 Watts Once the control receives a boiler demand it calculates a target water temperature based on the characterized heating curve to provide outdoor reset for space heating. The control can receive a boiler demand three different ways: 1. By applying 20-260 V (ac) to the boil...

Ask a question

Up to 3 photos. Max 5 MB each. Formats: JPG, JPEG, PNG, WebP.