Mitsubishi PURY-RP200- Installation Manual
Mitsubishi PURY-RP200– Installation Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 3 – Refrigerant Oil Recovery Operation Flow; Refrigerant oil recovery operation monitor display; How to read the LED on the service monitor
- Page 4 – Procedures for refrigerant oil recovery; Evacuating the existing pipes, and ensuring air tightness; Procedure 1
- Page 5 – Opening the valves
- Page 6 – Refrigerant oil recovery operation
- Page 7 – the outdoor unit’s LED indicates a successful completion.; Disconnecting the cylinder; Write on the control box panel the amount of refrigerant charged.; LED; Procedure 9
For use with R410A
GB
D
F
E
I
P
MINERAL OIL COLLECTION (REFRIGERANT OIL RECOVERY) INSTRUCTIONS MANUAL
ANLEITUNGSHANDBUCH FÜR DIE MINERALÖLSAMMLUNG
(KÄLTEMITTELÖLENTNAHME)
MANUEL D’INSTRUCTIONS POUR LA COLLECTE D’HUILE MINÉRALE
(RÉCUPÉRATION DE L’HUILE FRIGORIFIQUE)
MANUAL DE INSTRUCCIONES PARA LA RECOGIDA DE ACEITE MINERAL
(RECUPERACIÓN DE ACEITE REFRIGERANTE)
RACCOLTA DELL’OLIO MINERALE (RECUPERO DELL’OLIO REFRIGERANTE)
MANUALE DI ISTRUZIONI
MANUAL DE INSTRUÇÕES DE RECOLHA DE ÓLEO MINERAL
(RECUPERAÇÃO DO ÓLEO REFRIGERANTE)
Air Conditioners For Building Application
Outdoor Unit
PURY-RP200·250·300YJM-B(-BS)
WT06218X01_cv.fm Page 1 Tuesday, December 14, 2010 4:16 PM
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
3 GB 2. Refrigerant Oil Recovery Operation Flow 2.1 Refrigerant oil recovery operation monitor display (*1) The initial remaining time that indicates the refrigerant oil recovery is 80. A countdown will start on step 3 in the cooling mode. The countdown does not include the time for checking the ref...
4 GB 2.2 Procedures for refrigerant oil recovery 1 Evacuating the existing pipes, and ensuring air tightness Charge airtight gas through the service port on both the high-pressure and low-pressure valves. The air tightness should be 4.15 MPa. After checking the air tightness, evacuate the air throug...
5 GB 3 Opening the valves Open both the high-pressure and low-pressure valves. Use a hexagonal wrench to open the valves. Refer to the table below for the proper wrench size. 4 Connecting the refrigerant cylinder(s) If the required amount of refrigerant is not charged, disconnect the charging hose c...