Liebert SL-14050 - Manual
Liebert SL-14050 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – Table Of Contents; INSTALLATION
- Page 3 – RECEIVING & UNPACKING EQUIPMENT; HUMIDIFIERS; SGH Series Humidifier
- Page 4 – BLOWER PACKS; Wall Bracket Mounting Detail
- Page 5 – POWER AND; STEAM DISTRIBUTORS; Overhead and Frontal Clearances for Blower
- Page 6 – Distributor Support; Cutting Duct for Mounting
- Page 7 – PLUMBING; All water supply and drain line connections; Multiple Steam Distributors for Better Mixing; Multiple Steam Distributors
- Page 8 – Drain Line Connection; Steam Line Connection; Sloping the Steam Line
- Page 9 – Do not run steam line more than 1 foot per; Long Steam Lines; Steam Hose Routing; Condensate Tee at any Low Point in Steam Line
- Page 10 – CONDENSATE RETURN LINE; Trap to Prevent Steam in Condensate Line
- Page 11 – ELECTRICAL; LOW VOLTAGE CONTROL WIRING; Controls are available from Liebert as accessories.; External Wiring of On/Off Controls
- Page 12 – Varies With Each; Typical Modulation Wiring
- Page 13 – OPERATION; INTRODUCTION; END OF CYLINDER LIFE
- Page 15 – LIMITED WARRANTY; THE COMPANY makes no warranty and assumes no liability unless the
- Page 16 – Cylinder Last Replaced:; LIEBERT CORPORATION
SGH Steam
Generating Humidifier
Installation and
Operation Guide
IMPORTANT: Read and save this guide for future
reference. This guide to be left with equipment owner.
SL-14050
Form # 99-428 Rev. 1 / 150-1633 Rev. A
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
Table Of Contents INSTALLATION 1 RECEIVING & UNPACKING EQUIPMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 PRE-INSTALLATION CHECKPOINT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 BASIC HUMIDIFIER CONFIGURATION . . . . . . . . . . . . . . . . . ...
INSTALLATION RECEIVING & UNPACKING EQUIPMENT 1. Check packing slip to ensure ALL material hasbeen delivered. 2. All material shortages are to be reported toLiebert within 48 hours from receipt of goods.Liebert assumes no responsibility for anymaterial shortages beyond this period. 3. Inspect shi...
to clearances required for plumbing, electrical, andcontrol entrances. The clearance dimensions shownin this manual are for reference only and are theminimum required for maintenance of the humidifier.Local and National Codes should be consulted prior tofinal location and installation of the humidif...