Kohler K-9379-BN- Installation Manual

Kohler K-9379-BN

Kohler K-9379-BN– Installation Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
Page: / 1
Loading the manual

CAUTION: Risk of product damage. In the following

step, do not overtighten or breakage may
occur.

Copyright

1997 Kohler Co.

115962-2-

AA

(-)

TOOLS AND MATERIALS REQUIRED:

Phillips screwdriver

TO REMOVE EXISTING TRIP LEVER:

1.

Remove tank cover.

2.

Loosen nut securing trip lever to tank by turning clockwise.

The nut has left hand threads.

NOTE: In the following step, use care to prevent dropping

the nut into the vitreous tank. If the nut falls below
the water reservoir, it is not accessible.

3.

Remove trip lever from tank while holding nut to prevent

dropping it into tank.

TO INSTALL NEW TRIP LEVER:

1.

See Fig. #1. From outside the tank, insert trip lever arm

through hole in tank, sliding trip lever arm through the nut.

2.

See Fig. #2. When seating the bushing against the outside

of the tank, position the trip lever arm below the plunger
arm.

3.

See Fig. #2. Hand tighten the nut turning it

counter-clockwise. The nut has left-hand threads.

4.

See Fig. #2. If necessary, loosen the setscrew and

re-adjust the plunger nut until there is a 1/16” gap between
the plunger nut and the plunger arm.

NOTE: If no gap is provided, the toilet will not shut off.

More then 1/16” gap may cause the flush to be too
short.

5.

Replace tank cover.

Nut

Trip Lever

Bushing

Trip Lever Arm

Bearing
Surface

Trip Lever

Trip Lever Arm

Plunger Nut

Plunger Arm

1/16” Gap

Setscrew

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Other Kohler Models

All Kohler Other