Jade W7220 - Manual
Jade W7220 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – INSTALLATION AND SETUP; WARNING; CAUTION; Actuator Wiring Options:
- Page 8 – Power Up; Initial Menu Display; TROUBLESHOOTING; Alarms
- Page 9 – Clearing Alarms
- Page 10 – COMMON INSTALLATION ISSUES AND CONCERNS
- Page 12 – Automation and Control Solutions
INSTALLATION INSTRUCTIONS
62-0331-07
JADE™ Economizer Module
(MODEL W7220)
This document describes wiring, power up, basic
troubleshooting, and common installation issues for the
JADE™ Economizer Module (Model W7220). For further
information on mounting and operation, refer to Honeywell
document 63-2700.
BEFORE INSTALLATION
Review the following before installing the The W7220:
Electrical
Rated Voltage:
20 to 30 Vac RMS; 50/60 Hz
Transformer: 100 VA maximum system input
Relay Digital Output Rating:
30 Vac
IMPORTANT
All inputs and outputs must be Class 2 wiring.
Inputs
A Mixed air (MA) analog sensor is required on all W7220
units; either an OA (Outdoor Air) sensor for dry bulb change
over or an OA Sylkbus sensor for outdoor enthalpy change
over is required in addition to the MA sensor. An additional
Return Air (RA) Sylkbus sensor can be added to the system
for differential enthalpy changeover.
DCV (CO
2
) Sensor (C7232):
2-10 Vdc control signal;
minimum impedance >50k ohm.
Outputs
Actuator signal:
2-10 Vdc; minimum actuator impedance is
2k ohm
; Sylkbus two-wire output for Honeywell Sylkbus
communicating actuators.
Exhaust fan, Y1, Y2 and AUX1 O:
Contact closure (24 Vac)
All Relay Outputs (at 30 Vac):
Running: 1.5A maximum
Inrush: 7.5A maximum
When Installing This Product
1.
Read these instructions carefully. Failure to follow them
could damage the product or cause a hazardous condi-
tion.
2.
Check ratings given in instructions and on the product to
ensure the product is suitable for your application.
3.
Installer must be a trained, experienced service techni-
cian.
4.
After installation is complete, check out product opera-
tion as provided in these instructions.
Accessories
50048926-001 2-pin edge connector for sensors
(20 pieces per bag)
50048926-002 6-pin edge connector for field wiring
(20 pieces per bag)
C7250 20k sensor for MA or OA (dry bulb changeover)
C7400S Sylkbus sensor for enthalpy control in OA and/or RA
and RA for differential dry bulb changeover
W7220 PCMOD interface tool for JADE controller and Per-
sonal Computer. Go to www.customer.honeywell.com/
economizertools for the software
50053060-001 Duct mounting kit for sensors
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
JADE™ ECONOMIZER MODULE 62-0331—07 2 INSTALLATION AND SETUP The Economizer module may be mounted in any orientation. However, mounting in the orientation shown above permits proper viewing of the LCD display and use of the keypad. NOTE: Jade will be in the "set up" mode for the first 60 minu...
JADE™ ECONOMIZER MODULE 62-0331—07 8 Fig. 8. Single Enthalpy curves and boundaries. Power Up After the module is mounted and wired, apply power. Power Up Delay Upon power up (or after a power outage or brownout), the W7220 controller module begins a 5 minute power up delay before enabling mechanical...
JADE™ ECONOMIZER MODULE 9 62-0331—07 Clearing Alarms Once the alarm has been identified and the cause has been removed (e.g. replaced faulty sensor), the alarm can be cleared from the display. To clear an alarm, perform the following: 1. Navigate to the desired alarm. 2. Press the ↵ button. 3. ERASE...