Extron PVS 400 - Manual

Extron PVS 400

Extron PVS 400 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
49 Page 49
50 Page 50
Page: / 50

Table of Contents:

  • Page 2 – Instrucciones de seguridad • Español; Precautions; 安全须知; 注意
  • Page 3 – PoleVault Systems Installation • Introduction; Introduction; Overview; This manual covers the installation of the; Extron PoleVault; in a drop ceiling room with a wood or concrete; The PoleVault System; FCC Class A Notice; the interference at his own expense.
  • Page 4 – Extron Cables & Notes; PoleVault System installation and wiring overview
  • Page 5 – PoleVault Systems Installation • Introduction — Planning; Before you Begin Installation - Planning; that key aspects have been considered.; Typical classroom installation
  • Page 6 – Introduction — Planning, cont’d; • Lighting; Example of a classroom installation; b. Location of the screen and projector; • Proposed screen location; ADA overhead and side clearance requirements
  • Page 7 – d. Type and location of the speakers; Example classroom with four speaker installation
  • Page 8 – Introduction — Inventory Overview; hardware, individually boxed and labeled.; PoleVault A/V Source Input Wall Plates, and are shipped as follows:; PoleVault System Devices and Hardware; PMP
  • Page 9 – PoleVault System Devices and Hardware, cont’d
  • Page 10 – PoleVault System Ceiling Speakers
  • Page 11 – b. Items not included; Toggles (used for screen mounting on dry wall)
  • Page 12 – d. Installation tools; Tools should include, but are not confined to:
  • Page 13 – PoleVault Systems Installation • Installation Overview; Installation Overview; in five sections, Stages One though Five.; Outline of installation steps; Install projector to verify location (page 2-; — Install the PV SI 3C LP Ceiling Speakers.; Install the PMK 450 pole mount kit (page 2-22; — Configuring the system.
  • Page 14 – PoleVault Systems Installation • Installation — Stage 1; Stage One — Install the Screen and Projector; Stage 1; PMP Projector Mounting Pole; Projector Bracket; PCM 240 Projector Ceiling Mount
  • Page 15 – Mark screen location; When marking the location of screens, devices, or site; Do not drill the holes at this time; Install projector to verify location; Place the PCM 240 over the T-frame, between the two; PCM
  • Page 16 – Installation — Stage One, cont’d; Using suitable screws, mount the projector onto the; Verify the image location; Verify image size and location by loosening the
  • Page 17 – Cut the ceiling tile; Place the tile on a box, mark the hole’s center on the; Finish Projector Ceiling Mount; Take measurements with the PCM 240
  • Page 18 – Secure the Projector Ceiling Mount; Mark and drill holes at 10 degrees out from vertical.; Attach turnbuckles at the corners; Tighten the turnbuckles
  • Page 19 – Install any optional power outlets in the 2 gang opening; Install the Screen; Following the screen manufacturers guidelines, continue
  • Page 20 – PoleVault Systems Installation • Installation — Stage 2; Stage Two — Install the Wall Plates and MLC 104 IP; Stage 2; This stage involves installing the devices shown below.; PVT CV D and PVT RGB D PoleVault A/V Source Input Wall Plates; Right Side; Rear View; MLC 104 IP Plus MediaLink Controller
  • Page 21 – PVT transmitter installation; the MLC to the MLC/Power control port on the
  • Page 22 – Stage Two — Install the Wallplates and MLC 104 IP Plus; rear doglegs should fit easily into the opening. Bend; Repeat steps a to c for all the transmitters needing to be; MLC 104 IP Plus mud ring; Features for mud ring installation
  • Page 23 – • CAT 5 cables for signal transmission from the; Signal Cable; Pull the cables at each location.
  • Page 24 – Installation — Stage Two, cont’d; Install wall plates
  • Page 25 – Install MediaLink Controller; Connect the MLC power and RS-232 control cable as; Connecting the MLC to the switcher; From MLC 104 IP Plus; Wire stripping lengths
  • Page 26 – Connect the IR/RS-232 projector communication cable as; Connect to the LAN using a CAT 5 cable; Terminal
  • Page 27 – Secure the MLC 104 IP Plus to the; Connections made to the MLC 104 IP Plus
  • Page 28 – PoleVault Systems Installation • Installation — Stage 3; Stage Three — Install the PV SI 3C LP Ceiling Speakers; Stage 3; Receives and outputs audio signal from PVS 204SA switcher; Speaker Installation:; Cables
  • Page 29 – Install the speaker in the ceiling tile; Lay two supplied speaker V-rails across the tile on either
  • Page 30 – Installation — Stage Three, cont’d; Use a handheld screwdriver, as a powered screwdriver; Secure speakers to structural ceiling; Bend down the V-rail tabs to hold it in place and give; Cable the speakers; run the cable from the PVS 204SA to the
  • Page 31 – (5 mm) and secure the wires into the supplied
  • Page 32 – Finish speaker installation; Install/replace the speaker grill on the front of the
  • Page 33 – PoleVault Systems Installation • Installation — Stage 4; Stage 4; This stage covers installing the devices shown below.; PVS 204SA PoleVault Switcher; Stage Four — Install the PMK 450 and the PVS 204SA; VGA cable (connects to RGB output and projector)
  • Page 34 – Installation — Stage Four, cont’d; The installation must conform to national and local; Install the PMK 450 Pole Mount kit; Gather the cables, pass them down; Switcher and projector cable overview
  • Page 35 – Install the PVS 204SA switcher; bottom plate into the holes in the base of the PVS 204SA
  • Page 36 – Finish installing the Pole Mount kit; Lift the bottom plate (complete with the PVS 204SA; Do not apply power yet.; Do not thread the power cable through the
  • Page 37 – Attach and screw down rear plate
  • Page 38 – PoleVault Systems Installation • Installation — Stage 5; Stage 5; Items needed to help complete this stage:; Configure the system; Download and install the Extron Global Configurator; Stage Five — Configure the System; Launch the Global Configurator 2
  • Page 39 – Select MLC 104 IP Plus/PoleVault System
  • Page 40 – Installation — Stage Five, cont’d; Check that an image is present, adjust; pitch; Turn on the MLC 104 IP Plus controller
  • Page 41 – Set MLC volume to maximum, and adjust; Replace the front plate and; Final installation
  • Page 42 – Optional Accessory Installation — PPC 25; Priority Page Controller included parts:; Installation Procedure; tightly; Open the sensor and loop a wire
  • Page 43 – supplied blue sensor cable. Use it to connect the Relay Out; pins on the PoleVault PVS 204SA Vol/Mute; Paging Sensor
  • Page 44 – Connect the power supply via the; Ensure the sensor and wires fit
  • Page 45 – Testing and Adjustment Procedure; Sensitivity; Priority Page Controller Time DIP switch; Sensitivity knob adjustment
  • Page 46 – PoleVault Systems Installation • Reference Information; Reference Information; Specifications; manuals, or the product pages at; Mounting hardware; Specifications are subject to change without notice.
  • Page 47 – Devices; Wall or furniture mountable with included Decora wall plate.; All nominal levels are at ± 10%
  • Page 48 – Installation — Reference Information, cont’d
Loading the manual

PoleVault Systems

Installation Guide for the PVS 200, 300, and 400

68-1390-01

Rev. D

03 09

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - Instrucciones de seguridad • Español; Precautions; 安全须知; 注意

This symbol is intended to alert the user of important operating and maintenance (servicing) instructions in the literature provided with the equipment. This symbol is intended to alert the user of the presence of uninsulated dangerous voltage within the product’s enclosure that may present a risk o...

Page 3 - PoleVault Systems Installation • Introduction; Introduction; Overview; This manual covers the installation of the; Extron PoleVault; in a drop ceiling room with a wood or concrete; The PoleVault System; FCC Class A Notice; the interference at his own expense.

1-1 PoleVault Systems Installation • Introduction Introduction Overview This manual covers the installation of the Extron PoleVault ™ System in a drop ceiling room with a wood or concrete structural ceiling above. If the location has a concrete or beam style ceiling and no drop ceiling, alternative ...

Page 4 - Extron Cables & Notes; PoleVault System installation and wiring overview

PoleVault Systems Installation • Introduction 1-2 Introduction, cont'd L R AU X/MIX IN DO NO T GR OU ND OR SHOR T SPEAKER OU TPUTS ! 1B 1A INPUTS OUTPUTS 2B 2A 3B 3A RS-232 MLC/IR DC VO L 4/8 Ohms AMPLIFIED OUTPUTS VO L/MUTE Tx A B C Rx IR 12V 10V PO WE R 12V 3A MA X US LIS TE D 1 7T T AU DIO /VI DE...

Other Extron Models

All Extron Other