Page 2 - Instrucciones de seguridad • Español; Precautions; 安全须知; 注意
This symbol is intended to alert the user of important operating and maintenance (servicing) instructions in the literature provided with the equipment. This symbol is intended to alert the user of the presence of uninsulated dangerous voltage within the product’s enclosure that may present a risk o...
Page 3 - PoleVault Systems Installation • Introduction; Introduction; Overview; This manual covers the installation of the; Extron PoleVault; in a drop ceiling room with a wood or concrete; The PoleVault System; FCC Class A Notice; the interference at his own expense.
1-1 PoleVault Systems Installation • Introduction Introduction Overview This manual covers the installation of the Extron PoleVault ™ System in a drop ceiling room with a wood or concrete structural ceiling above. If the location has a concrete or beam style ceiling and no drop ceiling, alternative ...
Page 4 - Extron Cables & Notes; PoleVault System installation and wiring overview
PoleVault Systems Installation • Introduction 1-2 Introduction, cont'd L R AU X/MIX IN DO NO T GR OU ND OR SHOR T SPEAKER OU TPUTS ! 1B 1A INPUTS OUTPUTS 2B 2A 3B 3A RS-232 MLC/IR DC VO L 4/8 Ohms AMPLIFIED OUTPUTS VO L/MUTE Tx A B C Rx IR 12V 10V PO WE R 12V 3A MA X US LIS TE D 1 7T T AU DIO /VI DE...
Page 5 - PoleVault Systems Installation • Introduction — Planning; Before you Begin Installation - Planning; that key aspects have been considered.; Typical classroom installation
1-3 PoleVault Systems Installation • Introduction — Planning Before you Begin Installation - Planning Before installation is started, you must consider several major factors to ensure that the overall installation is as smooth and trouble free as possible, and that the final finished project meets t...
Page 6 - Introduction — Planning, cont’d; • Lighting; Example of a classroom installation; b. Location of the screen and projector; • Proposed screen location; ADA overhead and side clearance requirements
PoleVault Systems Installation • Introduction — Planning 1-4 Introduction — Planning, cont’d • Lighting Type and control (important for projector image viewing) Ambient light from windows Student Desks Teacher’s Desk TV / VCR / DVDInputs Screen/White BoardLocation Windows MLC ControllerLocation ...
Page 7 - d. Type and location of the speakers; Example classroom with four speaker installation
1-5 PoleVault Systems Installation • Introduction — Planning • Viewing obstructions Pillars, furniture etc., window locations for glare reduction, obstructions between projector and screen c. Location of MediaLink Controller and Wall Plates • Forward and side reach (for full details refer to a cop...
Page 8 - Introduction — Inventory Overview; hardware, individually boxed and labeled.; PoleVault A/V Source Input Wall Plates, and are shipped as follows:; PoleVault System Devices and Hardware; PMP
PoleVault Systems Installation • Introduction — Inventory Overview 1-6 Introduction — Inventory Overview 2. Inventory a. Included items The PoleVault System (PVS xxx) ships in two boxes. The larger box (42-1xx-xx) contain the devices and hardware, individually boxed and labeled. The smaller box (42-...
Page 9 - PoleVault System Devices and Hardware, cont’d
1-7 PoleVault Systems Installation • Introduction — Inventory Overview PVT CV D Wallplate PVT CV D White 60-819-13 (1) Mud ring (2) Dog legs(2) Dog leg screws (2) PVT mounting screws(1) Decora ® Faceplate (2) Faceplate screws *Part #’s 42-109-03 and 42-110-03contain 3 or 4 PoleVault Wallplates, acco...
Page 10 - PoleVault System Ceiling Speakers
Introduction — Inventory Overview, cont’d 1-8 PoleVault Systems Installation • Introduction — Inventory Overview 1-8 N If any items in the PoleVault System boxes are damaged or missing, contact the Extron Technical Hotline (see rear cover for contact numbers). PV SI 3C LP Speakers PV SI 3C LP White ...
Page 11 - b. Items not included; Toggles (used for screen mounting on dry wall)
1-9 PoleVault Systems Installation • Introduction — Inventory Overview 1-9 b. Items not included The following items are not included. However, input and display devices are essential parts of the system, and at any installation they may vary depending on their use. This list suggests various device...
Page 12 - d. Installation tools; Tools should include, but are not confined to:
PoleVault Systems Installation • Introduction — Inventory Overview 1-10 Introduction — Inventory Overview, cont’d d. Installation tools To aid the professional installer, this checklist gives the tools recommended to complete the installation. Tools should include, but are not confined to: • Laser l...
Page 13 - PoleVault Systems Installation • Installation Overview; Installation Overview; in five sections, Stages One though Five.; Outline of installation steps; Install projector to verify location (page 2-; — Install the PV SI 3C LP Ceiling Speakers.; Install the PMK 450 pole mount kit (page 2-22; — Configuring the system.
2-1 PoleVault Systems Installation • Installation Overview Installation Overview Installation Overview This overview outlines the basic steps for installing the PoleVault System. Detailed description of these steps is given in five sections, Stages One though Five. N Additional installation hardware...
Page 14 - PoleVault Systems Installation • Installation — Stage 1; Stage One — Install the Screen and Projector; Stage 1; PMP Projector Mounting Pole; Projector Bracket; PCM 240 Projector Ceiling Mount
PoleVault Systems Installation • Installation — Stage 1 2-2 Stage One — Install the Screen and Projector Stage 1 This stage involves installing the three pieces of hardware shown below. Cable AccessCutout(install thisend uppermost) Threaded at bothends PMP Projector Mounting Pole T-barSecuring Screw...
Page 15 - Mark screen location; When marking the location of screens, devices, or site; Do not drill the holes at this time; Install projector to verify location; Place the PCM 240 over the T-frame, between the two; PCM
2-3 PoleVault Systems Installation • Installation — Stage 1 1. Mark screen location a. Mark the center line and the outer edges of screen. T When marking the location of screens, devices, or site for installing transmitters and MediaLink control devices, use painters tape to avoid wall surface damag...
Page 16 - Installation — Stage One, cont’d; Using suitable screws, mount the projector onto the; Verify the image location; Verify image size and location by loosening the
PoleVault Systems Installation • Installation — Stage 1 2-4 Installation — Stage One, cont’d e. Using suitable screws, mount the projector onto the lower portion of the UPB 25 (the projector bracket, as shown in step 2e ’s image). Align it so the security flange is at the rear. A minimum of three ar...
Page 17 - Cut the ceiling tile; Place the tile on a box, mark the hole’s center on the; Finish Projector Ceiling Mount; Take measurements with the PCM 240
2-5 PoleVault Systems Installation • Installation — Stage 1 4. Cut the ceiling tile a. Mark the location of the PCM 240 on the T-bar, before removing it. This aids putting it back in the correct location when the tile is replaced. T Mark the screen direction on back of the tile (e.g. with an arrow o...
Page 18 - Secure the Projector Ceiling Mount; Mark and drill holes at 10 degrees out from vertical.; Attach turnbuckles at the corners; Tighten the turnbuckles
PoleVault Systems Installation • Installation — Stage 1 2-6 Installation — Stage One, cont’d 6. Secure the Projector Ceiling Mount to the ceiling a. Attach the four turnbuckles to the mounting plate, one at each corner. C DO NOT rest or lean on the mounting plate or suspended ceiling when attaching ...
Page 19 - Install any optional power outlets in the 2 gang opening; Install the Screen; Following the screen manufacturers guidelines, continue
2-7 PoleVault Systems Installation • Installation — Stage 1 T Install any optional power outlets in the 2 gang opening on the mounting plate, towards the outside edge of the mount, so it does not interfere with the PMK 450 when installed. C For safety, all wiring of the electrical boxes and accessor...
Page 20 - PoleVault Systems Installation • Installation — Stage 2; Stage Two — Install the Wall Plates and MLC 104 IP; Stage 2; This stage involves installing the devices shown below.; PVT CV D and PVT RGB D PoleVault A/V Source Input Wall Plates; Right Side; Rear View; MLC 104 IP Plus MediaLink Controller
PoleVault Systems Installation • Installation — Stage 2 2-8 Stage Two — Install the Wall Plates and MLC 104 IP Stage 2 This stage involves installing the devices shown below. AUDIO IN L R VIDEO IN Audio andVideo input Connectors Audio and VideoOutput Port (at rear) PVT CV D AUDIO IN L R VIDEO IN Mou...
Page 21 - PVT transmitter installation; the MLC to the MLC/Power control port on the
2-9 PoleVault Systems Installation • Installation — Stage 2 PVT transmitter installation • CAT 5 568A signal transmission cables (connects PVT’s to PVS 204SA switcher) MLC 104 IP Plus installation • MLC power and RS-232 control cable (connects the MLC to the MLC/Power control port on the PVS 204SA s...
Page 22 - Stage Two — Install the Wallplates and MLC 104 IP Plus; rear doglegs should fit easily into the opening. Bend; Repeat steps a to c for all the transmitters needing to be; MLC 104 IP Plus mud ring; Features for mud ring installation
PoleVault Systems Installation • Installation — Stage 2 2-10 Stage Two — Install the Wallplates and MLC 104 IP Plus N The installation must conform to national and local electrical codes, and UL requirements. Refer to the devices’ user manuals for details. 1. Install mud rings N These devices can be...
Page 23 - • CAT 5 cables for signal transmission from the; Signal Cable; Pull the cables at each location.
2-11 PoleVault Systems Installation • Installation — Stage 2 2. Pull cables The following cables need to be installed: • CAT 5 cables for signal transmission from the A/V wall plates to the PVS 204SA. N For PVT RGB D wall plates, two CAT 5 signal cables for each input are needed. Maximum distance fr...
Page 24 - Installation — Stage Two, cont’d; Install wall plates
PoleVault Systems Installation • Installation — Stage 2 2-12 Installation — Stage Two, cont’d 3. Install wall plates a. Connect the CAT 5 cables to the rear of the input devices (for RGB devices, cable labeled A to port A, cable B to port B). b. Mount each device into the mud ring. c. Attach the sup...
Page 25 - Install MediaLink Controller; Connect the MLC power and RS-232 control cable as; Connecting the MLC to the switcher; From MLC 104 IP Plus; Wire stripping lengths
2-13 PoleVault Systems Installation • Installation — Stage 2 4. Install MediaLink Controller T Before cabling and installing the MLC 104 IP Plus, locate and write down the MAC address of the device for configuring the IP address. The 12 character alphanumeric address (e.g., 00-05-A6-03-9G-H4) can be...
Page 26 - Connect the IR/RS-232 projector communication cable as; Connect to the LAN using a CAT 5 cable; Terminal
PoleVault Systems Installation • Installation — Stage 2 2-14 Installation — Stage Two, cont’d b. Connect the IR/RS-232 projector communication cable as shown for either RS-232 or IR projector control. c. Connect a CAT 5, 5e, or 6 straight through cable to the MLC ‘s RJ-45 jack. W DO NOT connect the ...
Page 27 - Secure the MLC 104 IP Plus to the; Connections made to the MLC 104 IP Plus
2-15 PoleVault Systems Installation • Installation — Stage 2 ExtronMLC 104 IP Plus Rotate locking armand insert into wallopening. OFF ON OFF ON Ext ron CONFI G DIS PLA Y MLC 104 IP P lus VOLUME 1 2 3 4 ON OF F VC R DV D PC ExtronMR 200 Modular Mud Ring 4e Secure the MLC 104 IP Plus to the mud ring T...
Page 28 - PoleVault Systems Installation • Installation — Stage 3; Stage Three — Install the PV SI 3C LP Ceiling Speakers; Stage 3; Receives and outputs audio signal from PVS 204SA switcher; Speaker Installation:; Cables
PoleVault Systems Installation • Installation — Stage 3 2-16 Stage Three — Install the PV SI 3C LP Ceiling Speakers Stage 3 This stage involves installing the devices shown below. Where it goes: Installs in ceiling tiles at predetermined location for best acoustics. Connects to switcher. What it doe...
Page 29 - Install the speaker in the ceiling tile; Lay two supplied speaker V-rails across the tile on either
2-17 PoleVault Systems Installation • Installation — Stage 3 N The installation must conform to national and local electrical codes, and UL requirements. Refer to the device’s user manual for details. 1. Cut ceiling tile If installing PV SI 3C LP speakers, do the following:a. Remove the ceiling tile...
Page 30 - Installation — Stage Three, cont’d; Use a handheld screwdriver, as a powered screwdriver; Secure speakers to structural ceiling; Bend down the V-rail tabs to hold it in place and give; Cable the speakers; run the cable from the PVS 204SA to the
PoleVault Systems Installation • Installation — Stage 3 2-18 Installation — Stage Three, cont’d e. Loosen the four screws on the front baffle (counter clockwise) ½ turn (see figure, A) and turn the doglegs to lock onto the C-ring. Tighten down the front screws (see figure, B). T Use a handheld screw...
Page 31 - (5 mm) and secure the wires into the supplied
2-19 PoleVault Systems Installation • Installation — Stage 3 c. To terminate the cable, strip the end of the cable 0.2" (5 mm) and secure the wires into the supplied 4-pole captive screw connector. d. Plug the 4-pole connector into the speaker terminal and replace and secure the plenum cover N T...
Page 32 - Finish speaker installation; Install/replace the speaker grill on the front of the
PoleVault Systems Installation • Installation — Stage 3 2-20 Installation — Stage Three, cont’d 5. Finish speaker installation a. Install/replace the speaker grill on the front of the speaker, using the supplied adhesive tabs (putty) to secure it in place. b. Repeat cabling and final installation st...
Page 33 - PoleVault Systems Installation • Installation — Stage 4; Stage 4; This stage covers installing the devices shown below.; PVS 204SA PoleVault Switcher; Stage Four — Install the PMK 450 and the PVS 204SA; VGA cable (connects to RGB output and projector)
2-21 PoleVault Systems Installation • Installation — Stage 4 Stage 4 This stage covers installing the devices shown below. L R AUX/MIX IN 1B 1A I NPUTS OU TPUTS 2B 2A 4 3 RS-232 MLC/IR DC VOL 4/8 Ohms AMPLIFIED OUTPUTS VOL/MUTE Tx A B C Rx IR 12V 10V POWER 12V 3A MAX US LISTED 17TT AUDIO/VIDEO APPAR...
Page 34 - Installation — Stage Four, cont’d; The installation must conform to national and local; Install the PMK 450 Pole Mount kit; Gather the cables, pass them down; Switcher and projector cable overview
PoleVault Systems Installation • Installation — Stage 4 2-22 Installation — Stage Four, cont’d N The installation must conform to national and local electrical codes, and UL requirements. Refer to the device’s user manual for details. 1. Pull the cables a. Loosen the PCM 240 set screws and remove th...
Page 35 - Install the PVS 204SA switcher; bottom plate into the holes in the base of the PVS 204SA
2-23 PoleVault Systems Installation • Installation — Stage 4 3. Install the PVS 204SA switcher a. Pass two 4-40 x 3/16" screws up through the PMK’s bottom plate into the holes in the base of the PVS 204SA switcher, and secure it in place at the left front of the bottom plate. N Do not install th...
Page 36 - Finish installing the Pole Mount kit; Lift the bottom plate (complete with the PVS 204SA; Do not apply power yet.; Do not thread the power cable through the
PoleVault Systems Installation • Installation — Stage 4 2-24 Installation — Stage Four, cont’d L R AUX/MIX IN 1B 1A I NPUTS OU TPUTS 2B 2A 4 3 RS-232 MLC/IR DC VOL 4/8 Ohms AMPLIFIED OUTPUTS VOL/MUTE Tx A B C Rx IR 12V 10V POWER 12V 3A MAX US LISTED 17TT AUDIO/VIDEO APPARATUS ® RGB VIDEO RGB VIDEO S...
Page 37 - Attach and screw down rear plate
2-25 PoleVault Systems Installation • Installation — Stage 4 FRONT REAR Rear Plate 4c Attach and screw down rear plate 4d Replace projector on the adjuster plate b. Align the bottom plate lugs with the slots in the top plate and slide up and into place. c. Attach the rear plate to secure the PMK 450...
Page 38 - PoleVault Systems Installation • Installation — Stage 5; Stage 5; Items needed to help complete this stage:; Configure the system; Download and install the Extron Global Configurator; Stage Five — Configure the System; Launch the Global Configurator 2
PoleVault Systems Installation • Installation — Stage 5 2-26 Stage Five — Configure the System Stage 5 Items needed to help complete this stage: • Laptop (or PC) with a network connection • GC 2 configuration program (download from www.extron.com ) • MLC 104 IP Plus User’s Manual • Projector manufac...
Page 39 - Select MLC 104 IP Plus/PoleVault System
2-27 PoleVault Systems Installation • Installation — Stage 5 1d Select MLC 104 IP Plus/PoleVault System from the drop down box d. Select the MLC 104 IP Plus/PoleVault system from the drop-down box. Follow the instructions on the help page. e. To move to the next page shown in the yellow box, click t...
Page 40 - Installation — Stage Five, cont’d; Check that an image is present, adjust; pitch; Turn on the MLC 104 IP Plus controller
PoleVault Systems Installation • Installation — Stage 5 2-28 Installation — Stage Five, cont’d 2c Check that an image is present, adjust as needed. 2. Test the system a. Ensure power is supplied to the PVS 204SA switcher, and power on the MLC 104 IP Plus. b. Connect all the input devices (e.g., PC, ...
Page 41 - Set MLC volume to maximum, and adjust; Replace the front plate and; Final installation
2-29 PoleVault Systems Installation • Installation — Stage 5 2e Set MLC volume to maximum, and adjust the level on the switcher FRONT REAR FrontPlate Cable frompower source Tighten Front andRear Plate Screws (4)and Side Screws (2) 3a Replace the front plate and 3b tighten down the screws on the moun...
Page 42 - Optional Accessory Installation — PPC 25; Priority Page Controller included parts:; Installation Procedure; tightly; Open the sensor and loop a wire
PoleVault Systems Installation • Optional Accessory Installation 2-30 Optional Accessory Installation — PPC 25 The Priority Page Controller (PPC 25) momentarily silences classroom audio whenever a page is made from a public address (PA) system. For detailed information, refer to the PPC 25 Installat...
Page 43 - supplied blue sensor cable. Use it to connect the Relay Out; pins on the PoleVault PVS 204SA Vol/Mute; Paging Sensor
2-31 PoleVault Systems Installation • Optional Accessory Installation POWER C NO PAGING SENSOR OUT TIME RELAY SENSITIVITY 12V 0.5A MAX ON 1 2 L R RS-232 MLC/IR 4/8 Ohms AMPLIFIED OUTPUTS VOL/MUTE Tx A B C Rx IR 12V 10V Priority PageController PVS 204SA 6 Connect the Priority Page Controller to the V...
Page 44 - Connect the power supply via the; Ensure the sensor and wires fit
PoleVault Systems Installation • Optional Accessory Installation 2-32 Optional Accessory Installation — PPC 25 PO WER C NO PAGING RELA Y DELA Y SENSITIVIT Y 12V 0.2A MA X ON 1 2 L R AU X/MIX IN DO NO T GR OUND OR SHOR T SPEAKER OUTPUTS! 1B 1A IN PU TS O U TPU TS 2B 2A 3B 3A RS-232 MLC/IR DC VO L 4/8...
Page 45 - Testing and Adjustment Procedure; Sensitivity; Priority Page Controller Time DIP switch; Sensitivity knob adjustment
2-33 PoleVault Systems Installation • Optional Accessory Installation Testing and Adjustment Procedure The fully installed system is shown below To test that the classroom audio is muted when a PA system announcement (page) occurs: 1 . Turn the classroom audio on. 2 . Speak into the PA system microp...
Page 46 - PoleVault Systems Installation • Reference Information; Reference Information; Specifications; manuals, or the product pages at; Mounting hardware; Specifications are subject to change without notice.
PoleVault Systems Installation • Reference Information 2-34 Reference Information Specifications For detailed specifications and warranty information of the PoleVault System components, refer to the device manuals, or the product pages at www.extron.com . Mounting hardware PCM 240 Mounting ............
Page 47 - Devices; Wall or furniture mountable with included Decora wall plate.; All nominal levels are at ± 10%
2-35 PoleVault Systems Installation • Reference Information Devices PVS 204SA External power supply ................. 100 VAC to 240 VAC, 50/60 Hz, external; to 12 VDC, 3 A, regulated Power input requirements ........... 12 VDC, 0.97 A (typical) Temperature/humidity ................ Storage: -40 to ...
Page 48 - Installation — Reference Information, cont’d
PoleVault Systems Installation • Reference Information 2-36 Installation — Reference Information, cont’d Ceiling mount installation diagram (with item weights) for PoleVault System L R AU X/MIX IN 1B 1A I N P U T S O U T P U T S 2B 2A 4 3 RS-232 MLC/IR DC VO L 4/8 Ohms AMPLIFIED OUTPUT S VO L/M UT E...