Elkay EDFPVR217RC - Manual
Elkay EDFPVR217RC – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – FIG; DET
- Page 3 – Harsh abrasive cleaners are not required and should not be used.
- Page 4 – BASIN; TOP VIEW
- Page 5 – TROUBLE SHOOTING & MAINTENANCE; OPERATION OF QUICK CONNECT FITTINGS; PARTS LIST; NS; DESCRIPTION
98409C (Rev. B - 9/08)
EDFPVR217RC
Installation/Care/Use manual
Non-Refrigerated Composite VR Fountain
with Back Panel
To assure you install this model easily and correctly, PLEASE
READ THESE SIMPLE INSTRUCTIONS BEFORE STARTING
THE INSTALLATION. CHECK YOUR INSTALLATION FOR
COMPLIANCE WITH PLUMBING, ELECTRICAL AND OTHER
APPLICABLE CODES. After installation, leave these instruc-
tions inside the fountain for future reference.
IMPORTANT! INSTALLER PLEASE NOTE.
THE GROUNDING OF ELECTRICAL EQUIPMENT SUCH AS TELEPHONE, COMPUTERS, ETC. TO
WATER LINES IS A COMMON PROCEDURE. THIS GROUNDING MAY BE IN THE BUILDING OR MAY
OCCUR AWAY FROM THE BUILDING. THIS GROUNDING CAN CAUSE ELECTRICAL FEEDBACK
INTO A FOUNTAIN, CREATING AN ELECTROLYSIS WHICH CAUSES A METALLIC TASTE OR AN
INCREASE IN THE METAL CONTENT OF THE WATER. THIS CONDITION IS AVOIDABLE BY USING
THE PROPER MATERIALS AS INDICATED. ANY DRAIN FITTINGS PROVIDED BY THE INSTALLER
SHOULD BE MADE OF PLASTIC TO ELECTRICALLY ISOLATE THE FOUNTAIN FROM THE BUILDING
PLUMBING SYSTEM.
IMPORTANT
ALL SERVICE TO BE PERFORMED BY AN AUTHORIZED SERVICE PERSON
Installer
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
98409C (Rev. B - 9/08) EDFPVR217RC 5/ 8" 16 m m 13 7 /8 " 35 2m m 18 3/ 16 " 46 2m m 2 1/ 4" 57m m 2 1/ 4" 57m m 27" 68 6m m AD A RE QU IR EMEN T 7 1 /8 " 18 1m m 2 3/ 16 " 56mm 13 3 /4" 34 9m m 6 5/ 8" 168 m m 33 " 838mm 40 1 /8 " 10 19 mm D SEE DET A...
98409C (Rev. B - 9/08) EDFPVR217RC PAGE 3 1. Wall should already be framed for the fountain using the positioning dimensions shown in Fig. 2. Shown dimensions pertain to installation location (framing must support up to 150 lbs. weight).2. Install rough-in plumbing as shown in Fig. 2. Run supply wat...
98409C (Rev. B - 9/08) EDFPVR217RC FIG. 3 8 1 2 9 BASIN 3 1 4 1 5 6 1 0 SEE FIG. 7 TOP VIEW 1 7 1 8 1 2 1 2, 4, 20 1 6 11 5, 7 SEE FIG. 3 1 3 FIG. 4 PAGE 4 2 2 2 5 2 3