Elkay ECU8*1A - Manual

Elkay ECU8*1A

Elkay ECU8*1A – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
Page: / 2
Loading the manual

ECU8*1A, ECU8*2A, ECU8*3A

97381C (Rev. A - 12/98)

Refrigeration Packages

Installation Instructions

TUBE IS SECURED

IN POSITION

SIMPLY PUSH IN

TUBE TO ATTACH

PUSH IN COLLET

TO RELEASE TUBE

PUSHING TUBE IN BEFORE

PULLING IT OUT HELPS TO

RELEASE TUBE

OPERATION OF QUICK CONNECT FITTINGS

1. Insure proper ventilation.

In fully recessed drinking fountains be sure condenser faces louver panel and is

within 1/2" (13 mm) of louver panel when panel is in place.

2. Water inlet is 3/8" (10 mm) O.D. tube connector.

Contractor to supply connections as required.

3. Connecting lines to be made of copper.

Thoroughly flush all lines to remove all foreign matter before

connecting to cooler.

4. Connect cooler to building supply

with a shut-off valve and install a 3/8" (10 mm) water line between the valve

and cooler. Remove burrs from outside of water line. Insert water line into bulkhead union until it reaches a

positive stop, approximately 3/4" (19 mm).

5. Electrical: Make sure power supply is identical

in voltage, cycle, and phase to that specified on cooler serial

plate. Never wire the compressor directly to the power supply.

The grounding of electrical equipment such as telephone, computers, etc., to water lines is a common procedure.

This grounding may be in the building, or may occur away from the building. This grounding can cause electrical

feedback into a water chiller, creating an electrolysis which causes a metallic taste or an increase in the metal

content of the water. This condition is avoidable by using the proper materials indicated below. Drain fittings which

are provided by the installer should be plastic to electrically isolate the chiller from the building plumbing system.

Temperature Control:

Factory-set for 50°F water (± 5°) under normal conditions. For colder water, adjust screw

on item no. 5.

Ventilation:

Cabinet louvers and condenser fins should be periodically cleaned with a brush, air hose, or vacuum

cleaner. Excess dirt or poor ventilation can cause no cold water and compressor cycling on the overload

protector.

Lubrication:

Motors are lifetime lubricated.

Actuation of Quick Connect Water Fittings:

Cooler is provided with lead-free connectors which utilize an o-ring

seal. To remove tubing from the fittings, relieve water pressure, push in on gray collar while pulling on the

tubing. To insert tubing, push tube straight into fitting until it reaches a positive stop, approximately 3/4”.

INSTALLATION

IMPORTANT! INSTALLER PLEASE NOTE:

TROUBLE SHOOTING & MAINTENANCE

START-UP

1. Open supply line valve.

2. Purge all air from all water lines

by operating bubbler valve of fountain to which cooler is connected. A steady

stream flow assures that all air is removed.

3. Rotate fan blade

to assure proper clearance and free action.

4. Connect to proper electrical power.

WIRING DIAGRAM

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Other Elkay Models

All Elkay Other