Crown TWZ120 - Manual
Crown TWZ120 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – Circulator Supplied Loose - May Be Installed On Supply Or Return.
- Page 3 – TABLE 1a: GENERAL SPECIFICATIONS; III Before Installing; Installation of Oil Burning Equipment; TABLE 1b: OPTIONAL TANKLESS HEATER RATINGS; Two problems arise when any oil-fired appliance is power vented:; CROWN
- Page 4 – ) Make sure that the boiler is correctly sized:; IV Locating the Boiler
- Page 5 – FIGURE 3: INSTALLATION OVER A COMBUSTIBLE FLOOR; FRONT VIEW
- Page 6 – V Air for Combustion and Ventilation; For Buildings of Other than Unusually Tight Construction
- Page 7 – For Buildings of Unusually Tight Construction:; space, which communicates directly with the outdoors.
- Page 10 – VI Venting; Standard
- Page 11 – downward or have sags. Vent pipe must be securely supported.; TABLE 2: MINIMUM RECOMMENDED BREECHING AND; Min. Recommended Chimney Size and Height
- Page 12 – FIGURE 10: STANDARD BOILER PIPING; CAUTION; Installation of Residential Hydronic Systems; VII System Piping
- Page 13 – DANGER; PIPE RELIEF VALVE TO A SAFE LOCATION; IMPORTANT
- Page 14 – Piping for Special Situations
- Page 15 – damage to a cast iron boiler such as the TWZ. Some examples include:
- Page 16 – WARNING; A mixing valve does not eliminate the risk of scalding.; VIII TANKLESS HEATER PIPING
- Page 17 – FIGURE 14: TANKLESS HEATER PIPING; IX Fuel Line Piping
- Page 20 – X Wiring; Ground (“green” or bare) - Ground screw on case of L8148 or L8124; Wiring Variations
- Page 22 – XI Start-up and Checkout; Use the following procedure for initial start-up of the boiler:; (FACTORY BOILER WIRING NOT SHOWN - SEE FIGURE 19); NEVER ATTEMPT TO FILL A HOT EMPTY BOILER.
- Page 25 – XII Service and Maintenance; The following procedure should be performed on an annual basis:; TABLE 3c: RIELLO BURNER CONFIGURATION AND SETUP DATA
- Page 26 – a) Make sure that the vent system is free of obstructions and soot.
- Page 27 – Warning; AVOID Breathing Fiber Particulates and Dust; Precautionary Measures
- Page 32 – Manufacturer of Hydronic Heating Products
1
TWZ Series
Oil-Fired Hot Water Boilers
INSTALLATION INSTRUCTIONS
These instructions must be affixed on or adjacent to the boiler
Models:
•
TWZ065
•
TWZ075
•
TWZ100
•
TWZ090
•
TWZ125
•
TWZ150
•
TWZ120
•
TWZ175
•
TWZ200
WARNING
: Improper installation,
adjustment, alteration, service or
maintenance can cause property
damage, injury, or loss of life.
For assistance or additional
information, consult a qualified
installer, service agency or the
oil supplier. Read these instruc-
tions carefully before installing.
D
E S I G N E D T O
L
E A D
Manufacturer of Hydronic Heating Products
P.O. Box 14818 3633 I. Street
Philadelphia, PA 19134
7HO)D[ZZZFURZQERLOHUFRP
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
2 Table of Contents I. Product Description ............................................................. 1 II. Specifications ....................................................................... 1 III. Before Installing ................................................................... 2 IV. Loc...
3 TABLE 1a: GENERAL SPECIFICATIONS Notes: 1. Net Ratings are based on piping and pick-up allowances of 1.15. 2. Burner Capacity Rating, GPH is based on #2 oil with a GrossHeating Value equal to 140000 BTU/Gal. 3. Maximum Working Pressure, Water - 50 PSI. 4. Tankless Heater Ratings based on I=W=H tes...
4 3) Make sure that the boiler is correctly sized: • For heating systems employing convection radiation (baseboard or radiators) use an industry accepted sizingmethod such as the I=B=R Heat Loss Calculation Guide (Pub. #H21 or #H22) published by the Hydronics Institute in Berkeley Heights, NJ. • For...