Carrier PRO-DIALOG Plus 30GK Series- User Manual
Carrier PRO-DIALOG Plus 30GK Series– User Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – CONTENTS; Page
- Page 3 – Safety device setting:; NOTE: Please fill in this sheet during the installation
- Page 7 – Follow all safety codes.
- Page 8 – Check compressor mountings; Before the first start-up of the unit proceed as follows:; Preliminary checks; the surface is horizontal, flat and intact.; Cross section of anti-vibration mounting
- Page 9 – Water connections; Note the water inlets and outlets of the heat exchangers.; Typical hydraulic circuit diagram
- Page 10 – Please refer to the controls manual for the unit.
- Page 11 – Leaks must be repaired immediately; Recharging liquid refrigerant; After detection and repair the unit can be recharged.
- Page 12 – Compressor motor protection
- Page 13 – Elliott tube plug
- Page 14 – Condenser coil; Clean the coil with the appropriate cleaning agents.; . This process can either be carried out with; Remove the grille with its support air duct assembly.; Refrigerant circuit; This setting should not be changed unless absolutely necessary.
1
Installation, operation and maintenance instructions
30GH 040-245
30GZ 040-245
Air-cooled liquid chillers
50 Hz
Carrier is participating in
the Eurovent Certification
Programme. Products are
as listed in the Eurovent
Directory of Certified
Products.
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
2 CONTENTS Page Start-up checklist .......................................................................................................................................................................... 3 Dimensions/clearances .........................................................................
3 START-UP CHECK LIST Start-up date: Equipment sold by: Contract No.: Installed by: Contract No.: Site address: Equipment type and serial numbers: 30GH/GZ Electrical data: Supply voltage: Ph. V Ph. 2 V Ph. 3 V Nominal voltage: V % network voltage: Current draw: Ph. 1 A Ph. 2 A Ph. 3 A Control circui...
7 APPLICATION DATA Minimum cooler water flow rates 30GH/GZ Min flow rate, l/s 040-045 3.6 050-060 4.0 085-095 6.0 100-120 8.5 130 9.8 145 12.1 150 9.8 160-245 12.1 Maximum chilled water flow rate The maximum chilled water flow is limited by the maximumpermitted pressure drop in the evaporator. It mu...