Carrier 58PHA/PHX- User Manual

Carrier 58PHA/PHX

Carrier 58PHA/PHX– User Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
49 Page 49
50 Page 50
51 Page 51
52 Page 52
53 Page 53
54 Page 54
Page: / 54

Table of Contents:

  • Page 2 – Table 1 – Dimensions; SAFETY CONSIDERATIONS; CARBON MONOXIDE POISONING HAZARD; WARNING; FURNACE RELIABILITY HAZARD; CAUTION
  • Page 3 – INTRODUCTION
  • Page 4 – CODES AND STANDARDS; comply with the national codes listed below and all authorities; Safety
  • Page 5 – Venting; PRECAUTIONS PROCEDURE
  • Page 6 – LOCATION; GENERAL
  • Page 7 – ELECTRICAL OPERATION HAZARD; PERSONAL INJURY AND/OR PROPERTY; TWO HORIZONTAL DUCTS; EXAMPLES: Determining Free Area
  • Page 8 – AIR FOR COMBUSTION AND
  • Page 9 – ACH; Volume; ACH
  • Page 10 – INSTALLATION; UPFLOW INSTALLATION
  • Page 11 – on a Combustible Floor
  • Page 12 – Coil Box Installed on a Combustible Floor
  • Page 13 – Suspended Furnace Support
  • Page 16 – FF
  • Page 18 – Table 6 – Maximum Capacity of Pipe*; control valve and accessible manual equipment shutoff valve
  • Page 19 – Fig. 19 -- Downflow Return Air Configurations and Restrictions
  • Page 20 – Fig. 20 -- Horizontal Return Air Configurations and Restrictions; Street Elbow
  • Page 21 – Table 7 – Electrical Data; ELECTRICAL CONNECTIONS; ELECTRICAL SHOCK AND FIRE HAZARD
  • Page 25 – GENERAL VENTING REQUIREMENTS
  • Page 28 – INTERNAL AREA OF CHIMNEY
  • Page 29 – CHIMNEY INSPECTION CHART
  • Page 32 – on the page following; following these figures; then Up
  • Page 36 – CHECK; General
  • Page 37 – follow exclusively the National Fuel Gas Code.; NOTE
  • Page 38 – FIRE HAZARD
  • Page 39 – Table 11 – Speed Selection; COLOR; FURNACE OVERHEATING HAZARD; Check Safety Controls
  • Page 40 – Checklist; Verify that blower and burner access doors are properly
  • Page 45 – SERVICE; COMPONENT TEST
  • Page 48 – mm
  • Page 49 – FIRE OR EXPLOSION HAZARD
Loading the manual

58PHA/PHX Performance Boost 80

4---Way Multipoise

Induced ---Combustion Gas Furnace

Input Capacities: 45,000 thru 135,000 Btuh

Installation, Start --- up, Operating and

Service and Maintenance

Instructions Series 100/A

SAFETY CONSIDERATIONS

2

. . . . . . . . . . . . . . . . . . . . . . . .

INTRODUCTION

3

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

CODES AND STANDARDS

4

. . . . . . . . . . . . . . . . . . . . . . . . . .

Safety

4

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

General Installation

5

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Combustion and Ventilation Air

5

. . . . . . . . . . . . . . . . . . . . .

Duct Systems

5

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Acoustical Lining and Fibrous Glass Duct

5

. . . . . . . . . . . . .

Gas Piping and Gas Pipe Pressure Testing

5

. . . . . . . . . . . . .

Electrical Connections

5

. . . . . . . . . . . . . . . . . . . . . . . . . . . .

Venting

5

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

ELECTROSTATIC DISCHARGE PRECAUTIONS

PROCEDURE

5

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

LOCATION

6

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

INSTALLATION

10

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Upflow Installation

10

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Downflow Installation

11

. . . . . . . . . . . . . . . . . . . . . . . . . . .

Horizontal Installation

13

. . . . . . . . . . . . . . . . . . . . . . . . . . .

Filter Arrangement

14

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Air Ducts

14

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Gas Piping

17

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

115--V Wiring

22

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

START--UP, ADJUSTMENT, AND SAFETY CHECK

36

. . . . .

General

36

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Start--up Procedures

36

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Adjustments

36

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Check Safety Controls

39

. . . . . . . . . . . . . . . . . . . . . . . . . . .

Checklist

40

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

SERVICE AND MAINTENANCE PROCEDURES

43

. . . . . . .

Introduction

43

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Care and Maintenance

46

. . . . . . . . . . . . . . . . . . . . . . . . . . .

Sequence of Operation

49

. . . . . . . . . . . . . . . . . . . . . . . . . . .

Wiring Diagrams

51

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Troubleshooting

51

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

ama

REGISTERED

ISO 9001:2000

CERTIFIED

NOTE

: Read the entire instruction manual before starting the

installation.
Portions of the text and tables are reprinted from NFPA 54/ANSI
Z223.1--2006

E

, with permission of National Fire Protection

Association, Quincy, MA 02269 and American Gas Association,
Washington DC 20001. This reprinted material is not the

complete and official position of the NFPA or ANSI on the

referenced subject, which is represented only by the standard in
its entirety.

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Other Manuals for Carrier 58PHA/PHX

Summary

Page 2 - Table 1 – Dimensions; SAFETY CONSIDERATIONS; CARBON MONOXIDE POISONING HAZARD; WARNING; FURNACE RELIABILITY HAZARD; CAUTION

2 2-7/16" 1-1/8" 28-7/8" (733mm) 25-1/4" 22-9/16" JUNCTION BOX LOCATION 7/8" DI A ACCESSORY 1/2" (13 mm) DIA. THERMOSTAT WIRE ENTRY 3-15/16" (84mm) LEFT HAND GAS ENTRY 33-5/16" 24-7/8" 5-1/2" 7/8" (22mm) DIA.ACCESSORY 11/16" 21-5/8" BOTTOM INLE...

Page 3 - INTRODUCTION

3 instructions thoroughly and follow all warnings or cautionsinclude in literature and attached to the unit. Consult local building codes, the current editions of the National Fuel GasCode (NFGC) NFPA 54/ANSI Z223.1 and the National Electrical Code (NEC) NFPA 70.In Canada, refer to the current editi...

Page 4 - CODES AND STANDARDS; comply with the national codes listed below and all authorities; Safety

4 A08471 Fig. 2 -- Clearances to Combustibles CODES AND STANDARDS Follow all national and local codes and standards in addition tothese instructions. The installation must comply with regulations of the serving gas supplier, local building, heating, plumbing, andother codes. In absence of local code...

Other Carrier Models