Carrier 50HCQA- Manual

Carrier 50HCQA

Carrier 50HCQA– Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
Page: / 44

Table of Contents:

  • Page 2 – SAFETY CONSIDERATIONS; WARNING
  • Page 4 – INSTALLATION; Jobsite Survey; Step 1 — Plan for Unit Location; NOTE
  • Page 5 – Ductwork must be attached to curb and
  • Page 7 – MAXIMUM ALLOWABLE; Step 5 — Field Fabricate Ductwork; Do not connect ductwork to; For Units with Accessory Electric Heaters —; Step 6 — Rig and Place Unit; UNIT DAMAGE HAZARD; CAUTION
  • Page 8 – Positioning on Curb —; Step 7 — Convert to Horizontal and Connect; without
  • Page 9 – Step 8 — Install Outside Air Hood; Factory Option —; Economizer Hood and Two–Position Hood; Two Position Damper Hood Removal and Setup --; Economizer Hood and Two–Position; Hood Parts
  • Page 10 – Step 9 — Install External Condensate Trap and
  • Page 11 – Step 10 — Make Electrical Connections; ELECTRICAL SHOCK HAZARD; FIRE HAZARD; Units Without Factory--Installed Disconnect —
  • Page 12 – Units with Factory--Installed Disconnect —; Units Without Disconnect Option; Convenience Outlets —; Installing Weatherproof Cover:
  • Page 15 – Electric Heaters; Bare Heater Model Number
  • Page 16 – Single Point Boxes and Supplementary Fuse; Single Point Boxes without Fuses:
  • Page 17 – PremierLink; Temperature (SAT) Sensor on Small Rooftop Units
  • Page 19 – Field Connections; SEN; SET; Connect Thermostat —
  • Page 20 – Table 3 – PremierLink Sensor Usage; NOTES
  • Page 22 – Economizer Controls
  • Page 25 – CCN Bus
  • Page 28 – Table 8 – RTU--MP Controller Inputs and Outputs; LEGEND
  • Page 29 – Outdoor Air Enthalpy Control
  • Page 31 – SW3 Protocol Selection; PROTOCOL; Baud Rate Selections; BAUD RATE
  • Page 33 – Integration Guide; Smoke Detectors
  • Page 34 – Smoke Detector Locations; Supply Air —; Location
  • Page 35 – Return Air with Economizer —; Sampling Tube; Additional Application Data —
  • Page 36 – : See page 42 for table legend and notes.
  • Page 42 – Legend and Notes for Table 10; IMPORTANT; IV Wiring; Step 11 — Adjust Factory--Installed Options; Smoke Detectors —
  • Page 43 – Step 12 — Install Accessories
Loading the manual

1

50HCQA

Single Package Rooftop

Heat Pump

with Puron

r

(R --- 410A) Refrigerant

Sizes 04 --- 06

Installation Instructions

NOTE

: Read the entire instruction manual before starting

the installation

TABLE OF CONTENTS

SAFETY CONSIDERATIONS

2

. . . . . . . . . . . . . . . . . . . .

INSTALLATION

4

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Jobsite Survey

4

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Step 1 -- Plan for Unit Location

4

. . . . . . . . . . . . . . . . . .

Roof Mount

5

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Step 2 -- Plan for Sequence of Unit Installation

5

. . . . . .

Curb--Mount Installation

5

. . . . . . . . . . . . . . . . . . . . .

Pad--Mount Installation

5

. . . . . . . . . . . . . . . . . . . . . .

Frame--Mount Installation

5

. . . . . . . . . . . . . . . . . . . .

Step 3 -- Inspect Unit

5

. . . . . . . . . . . . . . . . . . . . . . . . . . .

Step 4 -- Provide Unit Support

5

. . . . . . . . . . . . . . . . . . .

Roof Curb Mount

5

. . . . . . . . . . . . . . . . . . . . . . . . . .

Slab Mount (Horizontal Units Only)

5

. . . . . . . . . . .

Alternate Unit Support

5

. . . . . . . . . . . . . . . . . . . . . .

Step 5 -- Field Fabricate Ductwork

7

. . . . . . . . . . . . . . . .

For Units with Accessory Electric Heaters

7

. . . . . .

Step 6 -- Rig and Place Unit

7

. . . . . . . . . . . . . . . . . . . . .

Positioning on Curb

8

. . . . . . . . . . . . . . . . . . . . . . . .

Step 7 -- Convert to Horizontal & Connect Ductwork

8

. .

Step 8 -- Install Outside Air Hood

9

. . . . . . . . . . . . . . . .

Economizer Hood Removal and Setup

9

. . . . . . . . .

Two Position Damper Hood Removal and Setup

9

. . .

Economizer Hood and Two--Position Hood

10

. . . . .

Step 9 -- Install External Condensate Trap and Line

10

. . .

Step 10 -- Make Electrical Connections

11

. . . . . . . . . . .

Field Power Supply

11

. . . . . . . . . . . . . . . . . . . . . . . .

Units without Factory--Installed Disconnect

11

. . . .

Units with Factory--Installed Disconnect

12

. . . . . . .

Convenience Outlets

12

. . . . . . . . . . . . . . . . . . . . . . .

Factory--Option Thru--Base Connections

13

. . . . . . .

Units without Thru--Base Connections

14

. . . . . . . . .

Field Control Wiring

14

. . . . . . . . . . . . . . . . . . . . . . .

Thermostat

14

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Unit without Thru--Base Connection Kit

14

. . . . . . .

Heat Anticipator Settings

14

. . . . . . . . . . . . . . . . . . .

Electric Heaters

15

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Single Point Boxes and Supplementary Fuses

16

. . . . .

PremierLink

t

(Factory Option)

17

. . . . . . . . . . . . . . . . .

Supply Air Temperature (SAT) Sensor

17

. . . . . . . . .

Outdoor Air Temperature (OAT) Sensor

19

. . . . . . .

EconoMi$er

t

2

19

. . . . . . . . . . . . . . . . . . . . . . . . . . .

Field Connections

19

. . . . . . . . . . . . . . . . . . . . . . . . . .

Space Temperature (SPT) Sensors

19

. . . . . . . . . . . .

Connect Thermostat

19

. . . . . . . . . . . . . . . . . . . . . . .

Configure the Unit for Thermostat Mode

22

. . . . . .

Economizer Controls

22

. . . . . . . . . . . . . . . . . . . . . . . .

Outdoor Air Enthalpy Control

22

. . . . . . . . . . . . . . .

Differential Enthalpy Control

22

. . . . . . . . . . . . . . . .

Return Air Enthalpy Sensor

22

. . . . . . . . . . . . . . . . .

Indoor Air Quality (CO

2

sensor)

22

. . . . . . . . . . . . .

Outdoor Air Quality Sensor

23

. . . . . . . . . . . . . . . . .

Smoke Detector/Fire Shutdown (FSD)

23

. . . . . . . . .

Filter Status Switch

24

. . . . . . . . . . . . . . . . . . . . . . . .

Supply Fan Status Switch

24

. . . . . . . . . . . . . . . . . . .

Remote Occupied Switch

24

. . . . . . . . . . . . . . . . . . .

Space Relative Humidity Sensor

24

. . . . . . . . . . . . .

Power Exhaust (output)

24

. . . . . . . . . . . . . . . . . . . . .

CCN Communication Bus

24

. . . . . . . . . . . . . . . . . .

RTU--MP Control System

26

. . . . . . . . . . . . . . . . . . . . . .

Supply Air Temperature (SAT) Sensor

28

. . . . . . . . .

Outdoor Air Temperature (OAT) Sensor

28

. . . . . . .

EconoMi$er

t

2

28

. . . . . . . . . . . . . . . . . . . . . . . . . . .

Field Connections

29

. . . . . . . . . . . . . . . . . . . . . . . . . .

Space Sensors

29

. . . . . . . . . . . . . . . . . . . . . . . . . . . .

Economizer Controls

29

. . . . . . . . . . . . . . . . . . . . . . . .

Outdoor Air Enthalpy Control

29

. . . . . . . . . . . . . . .

Differential Enthalpy Control

29

. . . . . . . . . . . . . . . .

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Other Manuals for Carrier 50HCQA

Summary

Page 2 - SAFETY CONSIDERATIONS; WARNING

2 Return Air Enthalpy Sensor 29 . . . . . . . . . . . . . . . . . Indoor Air Quality (CO 2 sensor) 30 . . . . . . . . . . . . . Outdoor Air Quality Sensor 30 . . . . . . . . . . . . . . . . . Connecting Discrete Inputs 30 . . . . . . . . . . . . . . . . . . Communication Wiring -- Protocols 31 . . ....

Page 4 - INSTALLATION; Jobsite Survey; Step 1 — Plan for Unit Location; NOTE

4 C10231 Fig. 1 -- Unit Dimensional Drawing – 04 — 06 Size Unit (cont.) INSTALLATION Jobsite Survey Complete the following checks before installation. 1. Consult local building codes and the NEC (National Electrical Code) ANSI/NFPA 70 for special installa- tion requirements. 2. Determine unit locati...

Page 5 - Ductwork must be attached to curb and

5 Roof Mount — Check building codes for weight distribution requirements. Unit operating weight is shown in Table 1. Step 2 — Plan for Sequence of Unit Installation The support method used for this unit will dictate different sequences for the steps of unit installation. For example, on curb--mounte...

Other Carrier Models